Loading...
HomeMy WebLinkAboutLayton Const (18)r 4. TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S, FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2158 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Permit # PW08 -0072 Job Address: 1 VAIL RD VAIL Status ...: ISSUED Location.....: 13 VAIL ROAD Applied ..: 05/08/2008 Parcel No...: 210107101016 Issued . .: 05/14/2008 Expires. .: 05/16/2008 APPLICANT LAYTON CONSTRUCTION CO. INC 05/08/2008 Phone: (801) 568 -9090 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 05/08/2008 Phone: (801) 568 -9090 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 05/08/2008 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Desciption: Single lane closure on for 4 days 4/30, 4/31, Public Way ------ > Bond Amount --- > E. Meadow Dr. for t ailer r moval ) / 5/8, and 5/9 - "/ ' z -� %>? _y"/ /�-��- /,�j ^— * * * * * * * * * * * * * * * * * * * # * * # * * * * * * * *# FEE SUMMARY #******#*****#************ * * * * * * * * * * * * * * * * * * * * * * * * # * * * * ** ?? $0.00 TOTAL FEES --- > $1,050.00 Payments--------- - - - - -> $1,150.00 BALANCE DUE ---- > $0.00 ##**## rt***##+##++##* s* rt*+*###+***###*#+##**# s* s*+**** rt+#*#**+ rt+*#**#** rt*+*#**#* * # *rt * * # * * * * * #rt * # # #rt * * * *rt #rt # # + +* *rtrt # * + # * * * * * # * * + # # # * + + * + # # # # * +* Approvals: Item: 05500 PUBLIC WORKS 05/14/2008 is Action: AP Item: 05550 ENGINEERING CIVILS CONDITION OF APPROVAL # # # # # ### rtrt#### rt##*### rt* # # # # #+ # # # # # # # # + + # # # # # # # # # # # # # ## rtrt # # # # # # # # *# # + + # # # # # # # # #rt # # # *# rtrt+* # * * # # * * * # *rt + # * * *rt # * * * * # # # # # # # ## #rtrt * # # # # # # # # + # *rtrtrt ## ## DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUA APPLICATION FOR APR RIGHT OF WAY USE- STREET CUT PERMIT \\--f PRJ #: ei3 -$ tt7vF of Vail PWW: 99e Public Works Dept Parcel 4: Q 1309 Elkchom Dr Bldg Permit 9: B /� (, - �l 7 6 Vail, CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use - Street Cut permit and forfeiture of application fees. By signing this permit; the applicant declares he/she has read all contents of this document, Town orVail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: $50.00 � , Company 8-0/ 5 6 �• "9� 9 O Company Name: ��/)Y ( t �,f�Ns t Phone: . City /State/ Company Address: 20 f� SfJ �T� //�^' Zip:'dt 13�. Contractor License Number: 2�> -4 Email:' HSI Gdt..� Contact Name: ROW Use Location: Contact Phone: % (� ` yc) 1' "/ 7 7 Requested ROW ` Requested Use Dates: � .3O to S B :Work Times: A'� - 3 _6y .- Purpose for Request: `eye �' Od^3 Street Cut Dimension (if applicable):..: • Underground Utility Instal ation :''/ • Landscaping Length: • Temp Site Access • Construction Staging W idth (min 4'): ''`• • Roadway Construction 42r_ Other (explain): To'tal.Square.Footage: Requested-ROW Use: H t t$ Single Lane Closure — Ift of closuret(including.taper) ❑ Two Lane Closure — ]ft of closure'(mcluding taper) - ❑ Three Lane Closure — Ift of closure (including taper) ❑ Sidewalk/Bike Patli'= .Tft•of closure - - n.. Other (exnlain): 1. `Applicant shall submit a traffic control plan; and work'site /staving plan with this 'application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. Nofull 01-ee! clasures are allowed. 2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3, Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. acel Enery (800 - 922 -198 Qwest (800 - 922 -19 Comcast (800 -922 -1987) Holy Cross Electric (800 - 922 -19 Eagle River Water & Sanitation District (970 - 477 -5453 Town of VDAElerAic (970 -479 -215 'Town of Vail Irrigation (970479 - 2158) 41— G nt Applicant Name Applicant Si F: \cdev \FOr.MS \PermitAPublic Worl.s \row_application_2006.doc Date U FROM .CC ENTERPRISES FAX NO. :9702420530 Sep. 10 2007 01:53PM P9 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor: LAYTON CONSTRUCTION MHT #8 Project: WEST MEADOW RD - VAIL - 4 SEASONS RESORT Method of Handling Traffic: ONE LANE ROAD N PREPARED BY: W E ATSSA TCS NAME DATE S PHONE: 9.70 -242 -0669 CERTIFICATION # 0003704 ISSUE DATE:. EXPIRATION DATE: �" _ .. j S_FRONTAGE ROAD - - - - , /' ~ - - - - - - - - - - - - - - - - - - rROUND 1 .A- - . -- - - - - - - - - - - - . - - - - - - - - -- - - - - - - C FOUR SEASONS GATE GATE DEAD `41 END 100' 1001;14. L� ROAD WORK AHEAD !� ROAD WORK AMFAM T 100' 100, WEST MEADOW RD NOTES; 1, CONTRACTOR WILL NEED FLAGGERS TO STOP TRAFFIC FOR THE TRUCKS TURNING ON HIGHWAY DURING WORKING HOURS ONLY 2. ONE FLAGGER WILL BE AT THE FIRE STATION TO ALLOW ACCESS FOR THE FIRE DEPT 3. FLAGGERS WILL USE RADIOS TO COMMUNICATE. SIGNS & DEVICES: 3 - ROAD WORK AHEAD 2 - FLAGGER SYMBOLS J EAST MEADOW DRIVE V Permit Fee Worksheet ROW Use (min $50)' Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 2 x 200 = Two Lane $ 0.45 x x = Three Lane $ 1.50 x x = Sidewalk/Bike Path $ 0.15 x 2 x 200 = $ 60.00 $ 60.00 Fee Months S ft of Closure Paved Surface $ 0.25 1 x x = $ - Non -Paved Surface $ 0.05 x x = $ - Fee Weeks S ft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ - Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk/Bike Path $ 0.50 x x Fee Months Paved Surface $ 1.00 x B x Non -Paved Surface $ 0.20 x x Fee Da s Core Areas Heated StreetscaPel $ 0.50 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 04/30/2008 Four Season Single Lane Closure on W. Meadow Drive Office Trailer removal Fee S ft of Cut $ 0.30 x $ 1.00 x $ 50.00 x $ 0.05 Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 _ $ $ - 0 $ 120.00 O $ 100.00 1$ 220.00 F: IPWISpecificadonslROWYStandartlslPermit Fee Worksheet .xls 7op 0 C) Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 0.15 x 2 x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk/Bike Path $ 0.15 x 2 x Fee Months Paved Surface $ 0.25 1 x � x Non -Paved Surface $ 0.05 x x Fee Weeks Core Areas Heated Streetscapel $ 0.25 1 x x Lft of Closure $ 60.00 $ 60.00 $ $ $ Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ _ Two Lane $ 3.00 x x = $ Three Lane $ 6.00 x x = $ _ Sidewalk/Bike Path $ 0.50 x x = $ Fee Months S ft of Closure Paved Surface $ 1.00 x x = $ Non -Paved Surface $ 0.20 x x = $ Fee Da s j S ft of Closure Core Areas Heated Streetscape $ 0.50 x LI x = $ - Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee Four Season Single Lane Closure on W. Meadow Drive Fee S ft of Cut $ 0.30 x $ 1.00 x $ 50.00 x $ 0.05 Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 F:V'WlSpecificatlonslRDWY StandardslPermit Fee Worksheet.xls $ 120.00 O $ 100.00 $ 220.00 Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 2 x 200 Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x 2 x 200 Fee Months S ft of Closure Paved Surface $ 0.25 1 x x Non -Paved Surface $ 0.05 x x Fee P � x Weeks � S ft�� Core Areas Heated Streetsca e $ 0.25 x $ 60.00 $ 60.00 $ _ $ = D Non- Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ Two Lane $ 3.00 x x = $ Three Lane $ 6.00 x x = $ Sidewalk /Bike Path $ 0.50 x x = $ Fee Months S ft of Closure Paved Surface $ 1.00 x � x = $ - Non -Paved Surface $ 0.20 x x = $ Fee Da s S ft of Closure Core Areas Heated Streetscape $ 0.50 x x = $ Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub-Total Application /Inspection Fee Total Permit Fee 05/12/2008 Four Season Single lane Closures 5/12 -5-14 $ 120.00 Fee S ft of Cut $ 0.30 x = $ $ 1.00 x = $ $ 50.00 x = $ $ 0.05 = $ Fee S ft of Cut $ 8.00 x = $ $ 15.00 x = $ $ 200.00 x = $ $ 0.25 = $ $ $ 100.00 $ 220.00 F:V'WlSpecificationslRDWY StandardsWermit Fee Worksheet.xls Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 0.15 x 2 x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x 2 x Fee Months Paved Surface $ 0.25 1 x x Non -Paved Surface $ 0.05 x B x Fee Weeks Core Areas Heated Streetscapel $ 0.25 1 x x Lft of Closure 200 Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months Paved Surface $ 1.00 x � x Non -Paved Surface $ 0.20 x x 200 $ 60.00 $ 60.00 $ _ $ =D _ $ - $ Fee Da s S ft of Closure Core Areas Heated Streetscape $ 0.50 x x = $ - Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 05/13/2008 Four Season Single lane Closures 5/15 -5-16 $ 120.00 Fee S ft of Cut $ 0.30 x = $ - $ 1.00 x = $ - $ 50.00 x = $ - $ 0.05 = $ - Fee S ft of Cut $ 8.00 x = $ $ 15.00 x = $ - $ 200.00 x = $ - $ 0.25 = $ - $ - $ 100.00 $ 220.00 F:1PW1SpecificafionsV?DWY StandardslPermit Fee Worksheet.xls Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x x Fee Months S ft of Closure Paved Surface $ 0.25 x � x 1710 Non -Paved Surface $ 0.05 x x Fee Weeks S ft of Closure Core Areas Heated Streetscape $ 0.25 x x Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months S ft of Closure Paved Surface $ 1.00 1 x B x Non -Paved Surface $ 0.20 x x Fee Da s S ft of Closure Core Areas Heated Streetscape $ 0.50 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee Fee S ft of Cut $ 0.30 x $ 1.00 x $ 50.00 x $ 0.05 Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 10 parking spaces at 811 Potato Patch F: ~SpecificafionsVRD WY StandardslPermit Fee Worksheet.xls _ $ 2,565.00 $ - _ $ - _ $ $ =D $ 2,565.00 $ 100.00 2,665.00 TOWN OF VAIL, COLORADO Statement Statement Number: R080000704 Amount: $1,150.00 05/14/200802:23 PM Payment Method: Cash Init: LS Notation: credit card # 5031 / Layton Construction ----------------------------------------------------------------------------- Permit No: PW08 -0072 Type: PUBLIC WAY PERMIT Parcel No: 2101 - 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: 13 VAIL ROAD Total Fees: $1,150.00 This Payment: $1,150.00 Total ALL Pmts: $1,150.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- ST 00100003112100 PUBLIC WAY FEES 1,150.00