HomeMy WebLinkAboutLayton Const (20)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2158
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT
Job Address: 1 VAIL RD VAIL
Location.....: 13 VAIL ROAD
Parcel No...: 210107101016
APPLICANT LAYTON CONSTRUCTION CO. INC 05/22/2008
9090 SOUTH SANDY PARKWAY
SANDY
UT 840 -70 -640
License: 333 -A
CONTRACTOR LAYTON CONSTRUCTION CO. INC 05/22/2008
9090 SOUTH SANDY PARKWAY
SANDY
UT 840 -70 -640
License: 333 -A
OWNER VAIL DEVELOPMENT LLC 05/22/2008
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Permit # PW08 -0094
Status ...:
ISSUED
Applied..:
05/22/2008
Issued . .:
07/16/2008
Expires. .:
06/27/2008
Phone: (801) 568 -9090
Phone: (801) 568 -9090
Desciption:
Single lane closure on W. Meadow Drive for 3 days. Material
delivery
****++++++++******+++++++******+*++++ + * + * * * * * * + + * + + + + * + + * * * * * ** * * * *+ FEE SUMMARY +*+++++*******++++++++++++ * * * * * + * + + + + + * * + * * + * + * + + + + + + + * ++
Public Way ------ > ??
Bond Amount --- > $0.00
TOTAL FEES --- > $1,040.00
Approvals:
Item: 05500 PUBLIC WORKS
07/16/2008 is Action: AP
Item: 05550 ENGINEERING CIVILS
Payments--------- - - - - -> $1,100.00
BALANCE DUE ---- > $0.00
CONDITION OF APPROVAL
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec /detail book available in April of 1998.
* * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN
ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNER Olt CONTRACTOR I~0R- HIMSELF AND OWNER
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R080001171 Amount: $1,100.00 07/16/200802:31 PM
Payment Method: Cash Init: LS
Notation: credit
card /authorization# OS417C
-----------------------------------------------------------------------------
Permit No: PW08 -0094 Type: PUBLIC WAY PERMIT
Parcel No: 2101- 071 - 0101 -6
Site Address: 1 VAIL RD VAIL
Location: 13 VAIL ROAD
Total Fees: $1,100.00
This Payment: $1,100.00 Total ALL Pmts: $1,100.00
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
ST 00100003112100 PUBLIC WAY FEES 1,100.00
(07/16/2008) Leonard Sandoval - Re: Permit fee for spring season lane closures Page 1
From: ]amei|Tu,nbuU
To: Leonard Sandoval
Date: 07/18/3008 11:16 AM
Subject: Re: Permit fee for spring season lane closures
Come in today and paid.... authorization # is 05417C Jilt
'^> Leonard Sandoval 7/10/ZOO8 11:25 AM >v>
Mark,
The total fee of the permits for lane closures was $105O.00dollars
Cost of concrete barriers to the town $750.00 dollars
Permit fee remaining, (tnmV $1100.00 dollars
Thanks
Mark
Mark will stop by and pay for this permit fee.
Thank you
C V11
.` MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSU Y 2
APPLICATION FOR
RIGHT OF WAY USE- STREET CUT PERMIT B
P dlo
W #:
P W#:
Parcel #:
Blds Permit #:
o7 K"
oo f l
B /-'� iC
ToWn CEIVE
Publi Works ept
1309 lkho 7
Vail, 0 81 ; 21KI ,0008
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right�y Use -
Street Cut Permit and forfeiture of application fees. By signing this permit; the applicant declares he/she has read
this document, Town of Vail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code
and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: S.i0.00
, L �+� Company c
Company Name: IL.�TII A CDkdS ( X04 Phone:. 11 b -
�6 a ` „ City /State/ // 4� yO l p
Company Address: /� zip: y �/ (/I f
Contractor
License Number
Contact Name
ROW Use.Location:
Requested RO
Use Dates:
W S'
rl� �ec aC
Email: l Y`�' C� LGardvi- Cox - , r— q"
Contact
Phone. �% 0- Ll01-1: "177 1
Purpose for Request: Street Cut Dimension (if applicable):
❑ Underground Utility Installation
❑ Landscaping Length:
• Temp Site Access
• Construction Staging _ Width (min 4'):
• Roadway Construction}'
&L Other (explain): 4W tL4 f A 6 Total.Square.Footage:
Re uested ROW Use: t
J� Single Lane Closure — Ift of closure•(including.taper)
❑ Two Lane Closure — Ift of closure'(including taper)
❑ Three Lane Closure— Ift of closure (including taper)
❑ Sidewalk/Bike Path i, Ift of closure -
❑.. Other (explain):
1. `Applicant shall submit a traffic control plan; and work site /staging plan with this `application. Traffic
Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent
intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. A,ofull
street closures are allowed. '
2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routing application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
acel Enery (800 - 922 -1987) Qwest (800 -932 -1987)
Comcast (800- 922 -1987) Holy Cross Electric (800 - 922 -1987)
Eagle River Water & Sanitation District (970 - 477 -5453)
Town of Vail Electric (970 - 479 -2158) Town of Vail Irrigation (970 - 479 -2158)
CX
Print Applicant Name
F: \cdev \FORMS\ Permits \Public.Worl.s \row_application 1006.doc
Date
sw
Page 1 of 1
' Leonard Sandoval - Jersey barriers
From:
"Mark Reed"
To:
"Leonard Sandoval"
Date:
06/02/2008 6:39 PM
Subject:
Jersey barriers
Layton will sell to TOV for 50.00 each, we can make the adjustments on lane closure permits if it works for you.
Mark Reed
Senior Project Superintendent
Layton Construction Company
Phone: 970 - 479 -5389
Fax: 970 - 479 -5916
Cell: 970 - 401 -1777
mreed@l_aytonconstruction_,com (G' �42A,-'d, �
4 71�0 , 0;o
SL f W L. —t/ e. FCC �'o.�"t Ci ✓ewe J j QJrU • `� o
1100i do
file://CADocuments and Settings \Administrator \Local Settings \Temp \XPgrpwise \48443E... 07/10/2008
x
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days
Single Lane $ 0.15 x 3 x
Two Lane $ 0.45 x x
Three Lane $ 1.50 x x
Sidewalk /Bike Path $ 0.15 x 3 x
Fee Months
Paved Surface $ 0.25 x x
Non -Paved Surface $ 0.05 x x
Fee Weeks
Core Areas Heated Streetscape $ 0.25 x x
Lft of Closure
300
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Days
Single Lane $ 1.00 x x
Two Lane $ 3.00 x x
Three Lane $ 6.00 x x
Sidewalk /Bike Path $ 0.50 x x
Fee Months
Paved Surface $ 1.00 1 x B x
Non -Paved Surface $ 0.20 x x
Fee Da s
Core Areas Heated Streetscape $ 0.50 x x
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /Inspection Fee
Total Permit Fee
Four Season
Single lane and sidewalk closures
5/29 thru 5/31
Fee S ft of Cut
$ 0.30 x
$ 1.00 x
$ 50.00 x
$ 0.05
Fee S ft of Cut
$ 8.00 x
$ 15.00 x
$ 200.00 x
$ 0.25
FAPK0ISpecihcationsWDWY StandardsTennit Fee Worksheet.xls
300
$ 135.00
$ 135.00
$
$ -
=D
$
_ $ -
=D
$ 270.00
a
$ 100.00
I $ 370.00
s.�. 140
Leonard Sandoval - Lane Closures
From:
"Mark Reed"
To:
"Leonard Sandoval"
Date:
05/29/2008 10:25 AM
Subject:
Lane Closures
Leonard, we are requesting lane closures on West Meadows south side of Four Seasons:
Thursday, 2:00 PM until 5:00 PM Z1
Friday 7:00 AM until 4:00 PM 3 t7
Saturday 6:30 AM until 5:00 PM,
TMC will be providing the traffic control for us.
Mark Reed
Senior Project Superintendent
Layton Construction Company
Phone: 970 - 479 -5389
Fax: 970 - 479 -5916
Cell: 970 - 401 -1777
mreedOa lavtonconstruct ion. corn
file://C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \483E84... 05/30/2008
.AO
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 300
Two Lane $ 0.45 x x
Three Lane $ 1.50 x x
Sidewalk/Bike Path $ 0.15 x 3 x 300
Fee Months S ft of Closure
Paved Surface $ 0.25 1 x x
Non -Paved Surface Fs--o-.051 x x
Fee Weeks S ft of Closure
Core Areas Heated Streetscape $ 0.25 x x
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x
Two Lane $ 3.00 x x
Three Lane $ 6.00 x x
Sidewalk/Bike Path $ 0.50 x x
Fee Months
Paved Surface $ 1.00 1 x x
Non -Paved Surface $ 0.20 x x
Fee Days
Core Areas Heated Streetscape $ 0.50 x x
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /Inspection Fee
Total Permit Fee
Fee S ft of Cut
$ 0.30 x
$ 1.00 x
$ 50.00 x
$ 0.05
Fee S ft of Cut
$ 8.00 x
$ 15.00 x
$ 200.00 x
$ 0.25
F.- PMSpecificafions%RDWY StandardslPermit Fee Worksheet xls
$ 135.00
$ 135.00
$ -
_ $ -
=D
$
$
=D
$ 270.00
%0-
$ 100.00
$
Page 1 of 1
f
Leonard Sandoval - Lane closure
From:
"Mark Reed"
To:
"Leonard Sandoval"
Date:
05/20/2008 2:35 PM
Subject:
Lane closure
Leonard, I am requesting two lane closures this week on West Meadows, one on Wednesday and one on
Friday. For the purpose of deliveries and they will be needed from 7:00 to 3:00.
Mark Reed
Senior Project Superintendent
Layton Construction Company
Phone: 970 - 479 -5389
Fax: 970 - 479 -5916
Cell: 970 - 401 -1777
mreed @Iay_tonconstruction._com
09
file: / /C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \4832E1... 05/20/2008
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 300 =
Two Lane $ 0.45 x x =
Three Lane $ 1.50 x x =
Sidewalk /Bike Path $ 0.15 x 3 x 300 =
$ 135.00
$ 135.00
Fee Months S ft of Closure
Paved Surface $ 0.25 x x = $
Non -Paved Surface $ 0.05 x x = $
Fee Weeks S ft of Closure
Core Areas Heated Streetscape $ 0.25 x �� x = $
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $
Two Lane $ 3.00 x x = $
Three Lane $ 6.00 x x = $
Sidewalk /Bike Path $ 0.50 x x = $
Fee Months S ft of Closure
Paved Surface $ 1.00 x x $
Non -Paved Surface $ 0.20 x x = $
Fee Da s S ft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /Inspection Fee
Total Permit Fee
06/04/2008
Four Season
Single lane and sidewalk closures
6 -4 -08 -Vail Road
6 -4 -08 - W. Meadow
6 -5 -08 - W. Meadow until 10:00 am only
$ 270.00
Fee S ft of Cut
$ 0.30 x = $ -
$ 1.00 x = $ -
$ 50.00
$ 0.05 = $
Fee S ft of Cut
$ 8.00 x = $ -
$ 15.00 x = $
$ 200.00 x = $ _
$ 0.25 = $
$
$ 100.00
$ 370.00
EVIMSpecificationslRDWY StandardsWermit Fee Worksheet xls
Page 1 of 1
Leonard Sandoval - Lane Closers this Week!
From:
"Philip Daley"
To:
Date:
06/03/2008 1:55 PM
Subject:
Lane Closers this Week!
CC:
"Mike Ellis", "Mark Reed", 'Bob Hutchinson"
Leonard,
I am just sending you a confirming e-mail per our phone conversation today. Layton Construction is going to have
lane closers on Vail Road and West Meadows drive from 6:00am- 12:00pm tomorrow. On Thursday the 5th Layton
will need a lane closer on West Meadows Drive from 6:00 am -10:00 am.
Let me know if this doesn't work
Thanks,
1
Philip Daley _ y�, VVI tp 40
Project Engineer
Layton Construction Company, Inc.
Direct Line: 1- 970 - 479 -5389
Cell: 1- 970 - 401 -0961 'w, M e
Fax: 1- 970 - 479 -5916 V / , `
7
file://CADocuments and Settings \Administrator \Local Settings \Temp \XPgrpwise \48454D... 06/04/2008
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days
Single Lane $ 0.15 x 9 x
Two Lane $ 0.45 x x
Three Lane $ 1.50 x x
Sidewalk /Bike Path $ 0.15 x x
Fee Months
Paved Surface $ 0.25 x � x
Non -Paved Surface $ 0.05 x x
Lft of Closure
300 = $ 405.00
S ft of Closure
_ $
$
Fee Weeks S ft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x
Two Lane $ 3.00 x x
Three Lane $ 6.00 x x
Sidewalk /Bike Path $ 0.50 x x
Fee
Months S ft of Closur(
Paved Surface
$ 1.00
1 x
� x
Non -Paved Surface
$ 0.20
x
x
_ $
$
D
p S ft of _Closure = ��
Core Areas Heated Streetsca e $ 0.50 x x
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /Inspection Fee
Total Permit Fee
07/10/2008
Four Season
Single lane Closures for week of 6 -9 -08
$ 405.00
Fee S ft of Cut
$ 0.30 x = $
$ 1.00 x = $
$ 50.00 x = $
$ 0.05 = $
Fee S ft of Cut
$ 8.00 x = $
$ 15.00 x = $
$ 200.00 x = $
$ 0.25 = $
$
$ 100.00
$ 505.00
F. WWISpecificationslRDWY StandardslPermit Fee Worksheel.xls
m
Page 1 of 1
h
Leonard Sandoval - Lane Closers -June 10th -13th
From: "Philip Daley"
To:
Date: 06/06/2008 4:50 PM
Subject: Lane Closers -June 10th -13th
CC: "Mark Reed" , "Mike Ellis" , "Bob Hutchinson" , "Ben McClurg" , "Brandon Bergener"
Leonard,
Layton Construction would like to request the following lane closers for next week (June 10th -13th)
West Mead` Drive Q�
d� ;
Tuesd -7:00 am -5:00 pm
Wednesday -7:00 am -5:00 pm
Thursday -7:00 am -5:00 pm
S Friday -7:00 am -5:00 pm
Vail Road
�+ Tuesday -7:00 am -5:00 pm
1 Wednesday -7:00 am -5:00 pm
Thursday -7:00 am -5:00 pm
Friday -7:00 am -5:00 pm
Let me know if this will work.
Thanks,
Philip Daley
Project Engineer
Layton Construction Company, Inc.
Direct Line: 1 -970- 479 -5389
Cell: 1- 970 - 401 -0961
Fax: 1- 970 - 479 -5916
LAI61 u.
file: / /C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \48496A... 06/09/2008
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days
Single Lane $ 0.15 x 3 x
Two Lane $ 0.45 x x
Three Lane $ 1.50 x x
Sidewalk /Bike Path $ 0.15 x x
Fee Months
Paved Surface $ 0.25 x � x
Non -Paved Surface $ 0.05 x x
Lft of Closure
300 = $ 135.00
S ft of Closure
Fee Weeks S ft of Closure
Core Areas Heated Streetscape $ 0.25 x x _ $
Non- Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x
Two Lane $ 3.00 x x
Three Lane $ 6.00 x x
Sidewalk /Bike Path $ 0.50 x x
Fee Months
Paved Surface $ 1.00 x � x
Non -Paved Surface $ 0.20 x x
$
_ $
Fee Da s S ft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /Inspection Fee
Total Permit Fee
06/16/2008
Four Season
W. Meadow Drive Single Lane Closures
$ 135.00
Fee S ft of Cut
$ 0.30 x = $ -
$ 1.00 x = $ -
$ 50.00 x = $ _
$ 0.05 = $
Fee S ft of Cut
$ 8.00 x = $ -
$ 15.00 x = $
$ 200.00 x = $
$ 0.25 = $
$
$ 100.00
$ 235.00
F:TMSpecirrcafionslRDWY StandardsPermit Fee Worksheet.x/s
Page 1 of 1
Leonard Sandoval - Lane Closers!
From: "Philip Daley"
To:
Date: 06/13/2008 1:05 PM
Subject: Lane Closers!
CC: "Mark Reed", "Bob Hutchinson", "Mike Ellis", 'Ben McClurg"
Leonard,
Layton Construction would like to confirm that the following lane closers for West Meadow Drive are acceptable
per your conversation with Mark Reed:
Monday- 06/16/08- 6:00 am -6:00 pm
Wednesday- 06/18/08- 6:00 am -6:00 pm
Friday - 06/20/08- 6:00 am -6:00 pm
Let me know if you agree.
Thanks,
Philip Daley
Project Engineer
Layton Construction Company, Inc.
Direct Line: 1- 970 - 479 -5389
Cell: 1- 970 - 401 -0961
Fax: 1- 970 - 479 -5916
file: //C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \485270... 07/10/2008