Loading...
HomeMy WebLinkAboutLayton Const (20)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2158 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT LAYTON CONSTRUCTION CO. INC 05/22/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 05/22/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 05/22/2008 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Permit # PW08 -0094 Status ...: ISSUED Applied..: 05/22/2008 Issued . .: 07/16/2008 Expires. .: 06/27/2008 Phone: (801) 568 -9090 Phone: (801) 568 -9090 Desciption: Single lane closure on W. Meadow Drive for 3 days. Material delivery ****++++++++******+++++++******+*++++ + * + * * * * * * + + * + + + + * + + * * * * * ** * * * *+ FEE SUMMARY +*+++++*******++++++++++++ * * * * * + * + + + + + * * + * * + * + * + + + + + + + * ++ Public Way ------ > ?? Bond Amount --- > $0.00 TOTAL FEES --- > $1,040.00 Approvals: Item: 05500 PUBLIC WORKS 07/16/2008 is Action: AP Item: 05550 ENGINEERING CIVILS Payments--------- - - - - -> $1,100.00 BALANCE DUE ---- > $0.00 CONDITION OF APPROVAL DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER Olt CONTRACTOR I~0R- HIMSELF AND OWNER ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R080001171 Amount: $1,100.00 07/16/200802:31 PM Payment Method: Cash Init: LS Notation: credit card /authorization# OS417C ----------------------------------------------------------------------------- Permit No: PW08 -0094 Type: PUBLIC WAY PERMIT Parcel No: 2101- 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: 13 VAIL ROAD Total Fees: $1,100.00 This Payment: $1,100.00 Total ALL Pmts: $1,100.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- ST 00100003112100 PUBLIC WAY FEES 1,100.00 (07/16/2008) Leonard Sandoval - Re: Permit fee for spring season lane closures Page 1 From: ]amei|Tu,nbuU To: Leonard Sandoval Date: 07/18/3008 11:16 AM Subject: Re: Permit fee for spring season lane closures Come in today and paid.... authorization # is 05417C Jilt '^> Leonard Sandoval 7/10/ZOO8 11:25 AM >v> Mark, The total fee of the permits for lane closures was $105O.00dollars Cost of concrete barriers to the town $750.00 dollars Permit fee remaining, (tnmV $1100.00 dollars Thanks Mark Mark will stop by and pay for this permit fee. Thank you C V11 .` MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSU Y 2 APPLICATION FOR RIGHT OF WAY USE- STREET CUT PERMIT B P dlo W #: P W#: Parcel #: Blds Permit #: o7 K" oo f l B /-'� iC ToWn CEIVE Publi Works ept 1309 lkho 7 Vail, 0 81 ; 21KI ,0008 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right�y Use - Street Cut Permit and forfeiture of application fees. By signing this permit; the applicant declares he/she has read this document, Town of Vail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: S.i0.00 , L �+� Company c Company Name: IL.�TII A CDkdS ( X04 Phone:. 11 b - �6 a ` „ City /State/ // 4� yO l p Company Address: /� zip: y �/ (/I f Contractor License Number Contact Name ROW Use.Location: Requested RO Use Dates: W S' rl� �ec aC Email: l Y`�' C� LGardvi- Cox - , r— q" Contact Phone. �% 0- Ll01-1: "177 1 Purpose for Request: Street Cut Dimension (if applicable): ❑ Underground Utility Installation ❑ Landscaping Length: • Temp Site Access • Construction Staging _ Width (min 4'): • Roadway Construction}' &L Other (explain): 4W tL4 f A 6 Total.Square.Footage: Re uested ROW Use: t J� Single Lane Closure — Ift of closure•(including.taper) ❑ Two Lane Closure — Ift of closure'(including taper) ❑ Three Lane Closure— Ift of closure (including taper) ❑ Sidewalk/Bike Path i, Ift of closure - ❑.. Other (explain): 1. `Applicant shall submit a traffic control plan; and work site /staging plan with this `application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. A,ofull street closures are allowed. ' 2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. acel Enery (800 - 922 -1987) Qwest (800 -932 -1987) Comcast (800- 922 -1987) Holy Cross Electric (800 - 922 -1987) Eagle River Water & Sanitation District (970 - 477 -5453) Town of Vail Electric (970 - 479 -2158) Town of Vail Irrigation (970 - 479 -2158) CX Print Applicant Name F: \cdev \FORMS\ Permits \Public.Worl.s \row_application 1006.doc Date sw Page 1 of 1 ' Leonard Sandoval - Jersey barriers From: "Mark Reed" To: "Leonard Sandoval" Date: 06/02/2008 6:39 PM Subject: Jersey barriers Layton will sell to TOV for 50.00 each, we can make the adjustments on lane closure permits if it works for you. Mark Reed Senior Project Superintendent Layton Construction Company Phone: 970 - 479 -5389 Fax: 970 - 479 -5916 Cell: 970 - 401 -1777 mreed@l_aytonconstruction_,com (G' �42A,-'d, � 4 71�0 , 0;o SL f W L. —t/ e. FCC �'o.�"t Ci ✓ewe J j QJrU • `� o 1100i do file://CADocuments and Settings \Administrator \Local Settings \Temp \XPgrpwise \48443E... 07/10/2008 x Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 0.15 x 3 x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x 3 x Fee Months Paved Surface $ 0.25 x x Non -Paved Surface $ 0.05 x x Fee Weeks Core Areas Heated Streetscape $ 0.25 x x Lft of Closure 300 Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months Paved Surface $ 1.00 1 x B x Non -Paved Surface $ 0.20 x x Fee Da s Core Areas Heated Streetscape $ 0.50 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee Four Season Single lane and sidewalk closures 5/29 thru 5/31 Fee S ft of Cut $ 0.30 x $ 1.00 x $ 50.00 x $ 0.05 Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 FAPK0ISpecihcationsWDWY StandardsTennit Fee Worksheet.xls 300 $ 135.00 $ 135.00 $ $ - =D $ _ $ - =D $ 270.00 a $ 100.00 I $ 370.00 s.�. 140 Leonard Sandoval - Lane Closures From: "Mark Reed" To: "Leonard Sandoval" Date: 05/29/2008 10:25 AM Subject: Lane Closures Leonard, we are requesting lane closures on West Meadows south side of Four Seasons: Thursday, 2:00 PM until 5:00 PM Z1 Friday 7:00 AM until 4:00 PM 3 t7 Saturday 6:30 AM until 5:00 PM, TMC will be providing the traffic control for us. Mark Reed Senior Project Superintendent Layton Construction Company Phone: 970 - 479 -5389 Fax: 970 - 479 -5916 Cell: 970 - 401 -1777 mreedOa lavtonconstruct ion. corn file://C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \483E84... 05/30/2008 .AO Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 3 x 300 Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk/Bike Path $ 0.15 x 3 x 300 Fee Months S ft of Closure Paved Surface $ 0.25 1 x x Non -Paved Surface Fs--o-.051 x x Fee Weeks S ft of Closure Core Areas Heated Streetscape $ 0.25 x x Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk/Bike Path $ 0.50 x x Fee Months Paved Surface $ 1.00 1 x x Non -Paved Surface $ 0.20 x x Fee Days Core Areas Heated Streetscape $ 0.50 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee Fee S ft of Cut $ 0.30 x $ 1.00 x $ 50.00 x $ 0.05 Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 F.- PMSpecificafions%RDWY StandardslPermit Fee Worksheet xls $ 135.00 $ 135.00 $ - _ $ - =D $ $ =D $ 270.00 %0- $ 100.00 $ Page 1 of 1 f Leonard Sandoval - Lane closure From: "Mark Reed" To: "Leonard Sandoval" Date: 05/20/2008 2:35 PM Subject: Lane closure Leonard, I am requesting two lane closures this week on West Meadows, one on Wednesday and one on Friday. For the purpose of deliveries and they will be needed from 7:00 to 3:00. Mark Reed Senior Project Superintendent Layton Construction Company Phone: 970 - 479 -5389 Fax: 970 - 479 -5916 Cell: 970 - 401 -1777 mreed @Iay_tonconstruction._com 09 file: / /C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \4832E1... 05/20/2008 Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 3 x 300 = Two Lane $ 0.45 x x = Three Lane $ 1.50 x x = Sidewalk /Bike Path $ 0.15 x 3 x 300 = $ 135.00 $ 135.00 Fee Months S ft of Closure Paved Surface $ 0.25 x x = $ Non -Paved Surface $ 0.05 x x = $ Fee Weeks S ft of Closure Core Areas Heated Streetscape $ 0.25 x �� x = $ Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ Two Lane $ 3.00 x x = $ Three Lane $ 6.00 x x = $ Sidewalk /Bike Path $ 0.50 x x = $ Fee Months S ft of Closure Paved Surface $ 1.00 x x $ Non -Paved Surface $ 0.20 x x = $ Fee Da s S ft of Closure Core Areas Heated Streetscape $ 0.50 x x = $ - Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 06/04/2008 Four Season Single lane and sidewalk closures 6 -4 -08 -Vail Road 6 -4 -08 - W. Meadow 6 -5 -08 - W. Meadow until 10:00 am only $ 270.00 Fee S ft of Cut $ 0.30 x = $ - $ 1.00 x = $ - $ 50.00 $ 0.05 = $ Fee S ft of Cut $ 8.00 x = $ - $ 15.00 x = $ $ 200.00 x = $ _ $ 0.25 = $ $ $ 100.00 $ 370.00 EVIMSpecificationslRDWY StandardsWermit Fee Worksheet xls Page 1 of 1 Leonard Sandoval - Lane Closers this Week! From: "Philip Daley" To: Date: 06/03/2008 1:55 PM Subject: Lane Closers this Week! CC: "Mike Ellis", "Mark Reed", 'Bob Hutchinson" Leonard, I am just sending you a confirming e-mail per our phone conversation today. Layton Construction is going to have lane closers on Vail Road and West Meadows drive from 6:00am- 12:00pm tomorrow. On Thursday the 5th Layton will need a lane closer on West Meadows Drive from 6:00 am -10:00 am. Let me know if this doesn't work Thanks, 1 Philip Daley _ y�, VVI tp 40 Project Engineer Layton Construction Company, Inc. Direct Line: 1- 970 - 479 -5389 Cell: 1- 970 - 401 -0961 'w, M e Fax: 1- 970 - 479 -5916 V / , ` 7 file://CADocuments and Settings \Administrator \Local Settings \Temp \XPgrpwise \48454D... 06/04/2008 Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 0.15 x 9 x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x x Fee Months Paved Surface $ 0.25 x � x Non -Paved Surface $ 0.05 x x Lft of Closure 300 = $ 405.00 S ft of Closure _ $ $ Fee Weeks S ft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months S ft of Closur( Paved Surface $ 1.00 1 x � x Non -Paved Surface $ 0.20 x x _ $ $ D p S ft of _Closure = �� Core Areas Heated Streetsca e $ 0.50 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 07/10/2008 Four Season Single lane Closures for week of 6 -9 -08 $ 405.00 Fee S ft of Cut $ 0.30 x = $ $ 1.00 x = $ $ 50.00 x = $ $ 0.05 = $ Fee S ft of Cut $ 8.00 x = $ $ 15.00 x = $ $ 200.00 x = $ $ 0.25 = $ $ $ 100.00 $ 505.00 F. WWISpecificationslRDWY StandardslPermit Fee Worksheel.xls m Page 1 of 1 h Leonard Sandoval - Lane Closers -June 10th -13th From: "Philip Daley" To: Date: 06/06/2008 4:50 PM Subject: Lane Closers -June 10th -13th CC: "Mark Reed" , "Mike Ellis" , "Bob Hutchinson" , "Ben McClurg" , "Brandon Bergener" Leonard, Layton Construction would like to request the following lane closers for next week (June 10th -13th) West Mead` Drive Q� d� ; Tuesd -7:00 am -5:00 pm Wednesday -7:00 am -5:00 pm Thursday -7:00 am -5:00 pm S Friday -7:00 am -5:00 pm Vail Road �+ Tuesday -7:00 am -5:00 pm 1 Wednesday -7:00 am -5:00 pm Thursday -7:00 am -5:00 pm Friday -7:00 am -5:00 pm Let me know if this will work. Thanks, Philip Daley Project Engineer Layton Construction Company, Inc. Direct Line: 1 -970- 479 -5389 Cell: 1- 970 - 401 -0961 Fax: 1- 970 - 479 -5916 LAI61 u. file: / /C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \48496A... 06/09/2008 Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Single Lane $ 0.15 x 3 x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x x Fee Months Paved Surface $ 0.25 x � x Non -Paved Surface $ 0.05 x x Lft of Closure 300 = $ 135.00 S ft of Closure Fee Weeks S ft of Closure Core Areas Heated Streetscape $ 0.25 x x _ $ Non- Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months Paved Surface $ 1.00 x � x Non -Paved Surface $ 0.20 x x $ _ $ Fee Da s S ft of Closure Core Areas Heated Streetscape $ 0.50 x x = $ - Sub -total Street Cut (min $50) Non - Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 06/16/2008 Four Season W. Meadow Drive Single Lane Closures $ 135.00 Fee S ft of Cut $ 0.30 x = $ - $ 1.00 x = $ - $ 50.00 x = $ _ $ 0.05 = $ Fee S ft of Cut $ 8.00 x = $ - $ 15.00 x = $ $ 200.00 x = $ $ 0.25 = $ $ $ 100.00 $ 235.00 F:TMSpecirrcafionslRDWY StandardsPermit Fee Worksheet.x/s Page 1 of 1 Leonard Sandoval - Lane Closers! From: "Philip Daley" To: Date: 06/13/2008 1:05 PM Subject: Lane Closers! CC: "Mark Reed", "Bob Hutchinson", "Mike Ellis", 'Ben McClurg" Leonard, Layton Construction would like to confirm that the following lane closers for West Meadow Drive are acceptable per your conversation with Mark Reed: Monday- 06/16/08- 6:00 am -6:00 pm Wednesday- 06/18/08- 6:00 am -6:00 pm Friday - 06/20/08- 6:00 am -6:00 pm Let me know if you agree. Thanks, Philip Daley Project Engineer Layton Construction Company, Inc. Direct Line: 1- 970 - 479 -5389 Cell: 1- 970 - 401 -0961 Fax: 1- 970 - 479 -5916 file: //C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \485270... 07/10/2008