Loading...
HomeMy WebLinkAboutLayton Const (27)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2158 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT LAYTON CONSTRUCTION CO. INC 01/24/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 01/24/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 01/24/2008 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Permit # PW08 -0008 Status ...: ISSUED Applied..: 01/24/2008 Issued. .: 01/24/2008 Expires . .: 01/23/2008 Phone: (801) 568 -9090 Phone: (801) 568 -9090 Desciption: Single lane closure on W. Meadow Drive to allow for track equipment delivery. Winter of 2008. REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI FAMILY DISTRICT (HDMF) ******++****++++*+++++**+**++******** * * + * + # * * * * * * # * * * * * * * * * * * * * * * * ** FEE SUMMARY *****************+******** * * * * * * * * * * # * * * * * * * * * * * * * * * * * * ** Public Way ------ > ?? Bond Amount --- > $0.00 TOTAL FEES --- > $275.00 Approvals: Item: 05500 PUBLIC WORKS 01/24/2008 is Action: AP Item: 05550 ENGINEERING CIVILS Payments--------- - - - - -> $275.00 BALANCE DUE ---- > $0.00 CONDITION OF APPROVAL DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * ** *REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN * * ** ADVANCE BY VLEPHONE A_T,479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE - STREET CUT PERMIT �� g Town ofVail PW #: b �^ Public Works Dept Parcel #: 1309 Elkhorn Dr Bldg Permit 4: B j2 Vail, CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use - Street Cut Permit and forfeiture of application fees. By signing this permit; the applicant declares he/she has read all contents of this document, Town orVail Roadway Standards and chapters of?itle 8 — Public Ways and Property, of the Vail Municipal Code and is Fully aware of its requirements and agrees to pay all applicable fees. Application Fee: ✓;50.00 Company Company Name: Phone:. -7 Company Address: 4' n qo S; Contractor License Number: S 32—S — A Contact Name: ► —k.�( ROW Use Location: kAke— Sf �Q �irir'/1rAi"� City /State/ Zip: >e�- Irl Q1-7 c{ U d Email: t'1'1►"C,c� GdN-- Contact Requested ROW ;.Requested Use Dates: �— to i- •".Work Times•• Purpose for Request: _ Street Cut Dimension (if applicable): `t ❑ Underground Utility Installation • Landscaping Length: • Temp Site Access • Construction Staging Width (min 4'): ❑ Roadway Construction ❑ Other (explain):. Total.Square.Footage: :. Requested -ROW User ' '; "�,:`• Z Single Lane Closure — Ift of closuce-(including taper) ❑ Two Lane Closure — Ift of closure'(including taper) ❑ Three Lane Closure — Ift of closure (including taper) ❑ Sidewalk/Bike Path' = lft of closure ❑.. Other (explain): 1. °Applicant shall submit a traffic control plan, and work'site /staving plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. Nafa11 street closures are a!latved 2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routine application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. acel Enery (800 -922 -1987) Qwest (800 - 922 -1987) Comcast (500 -922 -1987) Holy Cross Electric (800 - 922 -1987) Ea-le River Water R Sanitation District (970 - 477 - 5453) Town of Vail,Electric070 -479 -2158) Town of Vail Irrigation (970 - 479 -2158) Prim Applicant Applicant Signature F: \cdev \FOr.MS\ Permits \Public.Worla \roN_application 2006.doc Date ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R080000086 Amount: $275.00 01/24/200809:06 AM Payment Method: Check Init: LS Notation: ck# 5135 - Mark M. Reed ----------------------------------------------------------------------------- Permit No: PW08 -0008 Type: PUBLIC WAY PERMIT Parcel No: 2101 - 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: 13 VAIL ROAD, Total Fees: $275.00 This Payment: $275.00 Total ALL Pmts: $275.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code -------------- - - - Description Current Pmts - -- ST 00100003112100 ------------------------ - - - - -- ------ PUBLIC WAY FEES - - - - -- 275.00 Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x x Fee Months S ft of Closure Paved Surface $ 0.25 x x Non -Paved Surface $ 0.05 x x Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x 1 x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x 1 x Fee Months Paved Surface $ 1.00 x x Non -Paved Surface $ 0.20 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface Fee $ 0.30 $ 1.00 $ 50.00 $ 0.05 ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 01/21/2008 Four Season Single Lane Closure West Meadow Drive Equipment delivery S ft of Cut x x x Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 F. IPWISpeciticationslRDWY StandardslPermit Fee Worksheet.xls $ - $ - $ 150.00 $ 75.00 $ - 1$ 225.00 0 1$ 50.00 r$ 275.00