Loading...
HomeMy WebLinkAboutLayton Const (35)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 -479 -2158 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Permit # PW09 -0092 Job Address: 1 VAIL RD VAIL Status ...: ISSUED Location.....: S. Frontage Road / 13 VAIL ROAD Applied..: 05/28/2009 Parcel No...: 210107101016 Issued . .: 06/15/2009 Expires . .: 05/28/2009 APPLICANT LAYTON CONSTRUCTION CO. INC 05/28/2009 Phone: (801) 568 -9090 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 05/28/2009 Phone: (801) 568 -9090 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 05/28/2009 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Desciption: Single lane closure on S. Frontage Road, crane staging. DEVELOPMENT OF FOUR SEASONS HOTEL **##+###**#***##*++*+*#*##*******##+# # * + * * + # # * * + * # * * + + + * # # # # * # * * # * ** FEE SUMMARY *+***#***+**+***+*+++++*++ * + # + # # * * * * + * + * * # # # + * # + + + * # + * * +# Public Way ------ > ?? Bond Amount --- > $0.00 Payments--------- - - - - -> $0.00 TOTAL FEES --- > $150.00 BALANCE DUE ---- > $0.00 Approvals: Item: 05500 PUBLIC WORKS 06/15/2009 is Action: AP Item: 05550 ENGINEERING CIVILS CONDITION OF APPROVAL DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. f SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRTOR TO PERMIT ISSUANCE APPLICATION FOR ' RIGHT OF WAY USE - STREET CUT PERMIT PRJfl: • D 3 Y 6� _vL Par el #: Z O/' -677 1' O �' 6 Bldg Permit#'• B 0—'-0/ 6' Town ofVail Public Works Dept 1309 Elkhorn Dr Vail, CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial 'for a Right of Way Use - Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he /she has read all contents of this document, Town or Vail Roadway Standards and chapters of Title 8— Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees, Application Fee: 550,00 LL nn Company Company Name: 4�yTavi Phone: _ COI S��" �d _ City /State/ Company Address: �O�ld 5• Zip; i't's{ /./t �S//57 D. Contractor " %' License Number 3 33 Email: �i� At dAusf C!✓ . >' Contact Phone: Ve1j '•7 7 7 !/Llai-�C %wee 17 b ' Contact Name: _ • • ROW Use.Location: —�Q, (.� O .,,., .ten }..:.•, - �ii::.Kl;i:,�•. "•:; . Requested ROW ..Requested Use Dates: to 5} "CJ -:Work Times:'' Purpose for Request: t,::, _' Street Cut Dimension (if applicable):., ❑ Underground Utility Installation ❑ Landscaping . %ti Length: • Temp Site Access. • Construction Staging Width (min 4'): • Roadway Construction l � �[ Other �� J� �/L�� Toial•.Square.Footage: (explain):- - ' - .'� Requested -ROW Use: " ❑ Single Lane Closure — Ifl of clostir "e (including•taper) I-] two Lane Closure — lfl of closure (including taper) ❑ Three Lane Clostire — Ift of closure (including taper) ❑ Sidewalk/Bike Path-­ of closure Other (explain): Y" ne' A_' ' 1. 'Applicant shall submit a traffic control plan; and work site /stagtng plan with this application. 'Traffic Control Plan shall be in compliance with the MUTCD and sbal] show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. Nofall ' .srreef closurer'are allowed - 2. Applicant must contact Public Works Department at 479 -2195 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line-within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allov%, up to one week to process. Y.cel Enery (800 -922 -1987) fA Qwest (800 -922 -1957) 1� Comcast (800 -922 -1987) /Z4 Holy Cross Electric (500 -922 -1987) 1N Fade River Water & Sanitation District (970= 177 - 5453)• A A , Tovvm ofVail Electric (970 - 479 -2158) Tor�m Of Vail lrrigatian (970 - 479- 2158)_T___ 1 N Print A� pplicant Name V ,'p F: \cdev\ FORMS \PermitslPubIic.WorhArow_appli cation_2006.doc s�Z7-6 Late T w y � T w cn 0 v O` �ozpv ,:j o T7 y X rn I C �q a I n O t o n 1 r I 1 7 m 1 > m n v I 1 � 1 1 .1 o I O N j z z o o � r: I � � I Cn. i UC= -3> VAIL ROAD i I I r1d� VAIL ROAD rn =>' -0 � � —1 l J M °.D�� -rr m00 m --q D n m –+ = `- (D `a Z to D c O A Ri o m n m p D z o � m � 0 � C4- Cnn U, Q�Ocn n U' C � m z O O � Oz cn O :n m o 4� z D �o n � p