Loading...
HomeMy WebLinkAboutLayton Const (5)TOWN OF VAIL 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2138 NOTE DEPARTMENT OF COMMUNITY DEVELOPMENT THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT LAYTON CONSTRUCTION CO. INC 12/19/2006 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 12/19/2006 License: 333 -A OWNER VAIL DEVELOPMENT LLC 12/19/2006 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Permit # PW06 -0216 Status ...: ISSUED Applied..: 12/19/2006 Issued . .. 12/19/2006 Expires . .: Phone: (801) 568 -9090 Phone: (801) 568 -9090 Desciption: Temp site access for allow and creating a access point to site for installation of construction trailer. Permit will expire April 15, 2007 REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI FAMILY DISTRICT (HDMF) #+##*###****###**##****##**###*#####* # # # * *+ # # * * # # * # # # # * * # # # # # # # * # # ## FEE SUMMARY ###**######***#**#**###### # # # * # # # * # * * # * # # # # * * # # * # # # # # * # ## Public Way ------ > ?? Investigation - - - - -> ?? Bond Amount - - -> Payments--------- - - - - -> $132.50 BALANCE DUE ---- > $0.00 TOTAL FEES --- > $132.50 Approvals: Item: 05500 PUBLIC WORKS 12/19/2006 is Action: AP Permit will expire 4 -15 -07 12/19/2006 is Action: AP Item: 05550 ENGINEERING CIVILS CONDITION OF APPROVAL Cond: CON0008612 Only use of small construction vehicles allowed during winter ski months. DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER 0 TOWN OF VAIL, COLORADO Statement Statement Number: R060002124 Amount: $132.50 12/19/200610:36 AM Payment Method: Check Init: LS Notation: ck# 1265 ----------------------------------------------------------------------------- Permit No: PW06 -0216 Type: PUBLIC WAY PERMIT Parcel No: 2101 - 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: 13 VAIL ROAD Total Fees: $132.50 This Payment: $132.50 Total ALL Pmts: $132.50 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- ST 00100003112100 PUBLIC WAY FEES 132.50 MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE- STREET CUT PERMIT PR3 #: ,/ p 8' Town of Vail PW#f: Public Works Dept Parcel #: 1309 Elkhom Dr Bldg Permit # B OI /mil/ Vail, CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use - Street Cu,. Permit and forfeiture of application fees. By signing this permit, the applicant declares nelshe has read all contents of this document;.Town of Vail Roadway Standards and chapters of Title S — Public Ways and Property, of the Vail Municipal Code and is fully aware of its requiremen`tss and agrees to pay all applicable fees. Application Fee: $50.00 1�( C, 7, STl�l�G7O/�I ' Company col- Jk Company Name: - Phone: City/State/ Company Address: 107OS, SNP ( 121<w) Zip: Contractor _f1 L7L�7�15E = 333 j 11 / License Number: L!%fI-! GDl�7I2/t GTGK =lI/���T�III'SSDI mail :- :,GIClIr1�°;l�ll�i�%/%�/ls /. �/'� Contact el-'' =310 Contact Name: Pews �"� �` Phone: ROW Use Location: W MCkbvW Ate'' : �}� �� Requested ROW i eq essted 1 Z Use Dates: �9. mbrk Times.: �� ��✓% 777 G Purpose for Request: ;Street Cut Dimeusron (>f applicable) ` ❑ Underground Utility Installation t UK • Landscaping • Temp Site Access • Construction Staging " Widt:V -1 n 41) • Roadway Construction ReKva Other (explain): bRiygLo %X � ' Total Squ Footage: -. %MP A-u ss vy v PR Requested ROW Use: �::- _? _ __ • Single Lane Closure— Ift of cloiEY (including taper) • Two Lane Closure — ift of closure• (uirludmg taped t • Three Lane Closure — lft of closutes(mcludmg tapei)�_ -= • Sidewalk/Bike Path Ift*of closure W = F.:-. ' ......' f L. 1 _ + , 1. fikpplicanttshall submit traffic control plan, and work. site /staging plan with tilts application Traffic {;Control Pian!shall *be in rom�lianee withfhe =MUTCD i 4shall �hotiwstreets withs.uames, .99peent :mte'rsections, adva3lced warning s bnage taper lengths,-buffer~spaceiand w_ ork zone dimensions. Na full -streef closures areallawerl � �' � � '. ; },�- u F. 2. Applicant must contact Puoic Worlss bepartment at 479 -2 98 24 hours prior to commencing of work. Failure to notify the Towr. will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. lcel Enery (800-9222-1987) Qwest (800 -922 -1987) Comcast (800 - 922 -1987) Holy Cross Electric (800- 922 -1987) Eagic River Water &-Sanitation District (970 - 477 -5453 Town of Vail Electric (970 - 479 -2158) Town of Vail Irrigation. (970 - 479 -215 1 Ot4f, i?i K W Print Appiicant Name Signature F:1PW\Specifica1ions \RD)A1Y S=dards \ROW permitsTermit Application.doc Date low RANE 2 CANSTRUCTICIN '—'FENCING (TYP) " 4r^ h�ifl a PORTABLE TOILETS r� PARKING •:� � (9'X1$') loop PuEp7i1�T,;.p;,y II � RIVAIE DUPLE" RESIDENCES B2A AND 82B AEADOW DRIVE�ys • 1 j �Y. '��� 3X5. � � , +{,Y""`?L:+,,d` Wf F ( 0 MAINTAIN ACCESS To E)aSTING FIRE HYDRANT +a ea Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Da s Lft of Closure $ 0.15 x x - $ Single Lane = $ _ $ 0.45 x x Two Lane = $ _ $ 1.50 x x Three Lane _ $ _ Sidewalk /Bike Path $ 0.15 x x Fee Months S ft of Closure $ 0.25 x x $ Paved Surface 22.50 Non -Paved Surface $ 0.05 x x -1`� _ $ Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Da s Lft of Closure $ 1.00 x x = $ - Single Lane = $ Three Lane _ Two Lane $ 3.00 x x $ 6.00 x x = $ - _ Sidewalk /Bike Path $ 0.50 x x $ Fee Months S ft of Closure Paved Surface $ 1.00 x x - Non -Paved Surface $ 10x 2 x 150 = Sub -total $ 82.50 Street Cut (min $50) Non - Moratorium Streets Surface Fee S ft of Cut ACCIPCC $ 0.30 x - $ Brick Paver $ 1.00 x - $ Pothole (each) $ 50.00 x - $ Non -Paved Surface $ 0.05 = $ Moratorium Streets Surface Fee S ft of Cut ACC /PCC $ 8.00 x $ Brick Paver $ 15.00 x - $ Pothole (each) $ 200.00 x - $ Non -Paved Surface $ 0.25 - $ Sub -Total $ Application /Inspection Fee $ 50.00 $ 132.50 Total Permit Fee Temp site access on W. Meadow Drive F.'IPIMSpecifications\RDWY StandardslPermit Fee Worksheet.xls Deprtrtment 0096hr Works f� Transportation 08/08/2006 Layton Construction Company, Inc. 9090 S. Sandy Parkway Sandy, Utah 84070 Attn: Doug Carley, Project Manager RE: Staging plans comments for the Four Season Project Mr. Doug Carley, J 1M A4WF, IL aH( 8- ly -Glo 1309 Elkhorn Drive Vail Colontdo= 81657 970479 -2158 +�y��]�� 00%&I Fax: 970 - 479 -2166 1.V111�I www.V4ilgov.c »m Sea PERM iT AftCat D iF7FQ `t'-29 -oc Here are the comments regarding the staging plan. Note: Staging plans are required for both winter and summer months of each as updated construction schedules. Public way pe and fees are also required when d is ex ire. --T- ;� cess from 4- ✓ I. vide a Public way permit and fee in the amount of $132.50 dollars for temp site ac W. Meadow Drive. This permit will expire on Nov. 1, 2006 ,R,,,,J' ft m ✓ 2. -Provide a.permit fee of 4$ 00.ars for the Holy Cross utility relocation and staging on the S. Frontage Rd. �wr c� rfl � �, t!. ✓ 3. Provide a permit fee of $1987.00 dollars, for the permit submitted for dewatering. fi�Lf'r1� 4. No sidewalk closure along the S. Frontage Rd. allowed unless an alternative route is provided and approved by the Town of Vail Public Works Departmerrt. GP. /Cl; �tsTPki5c5 5. Provide traffic control plan for the intersection of W. Meadow Drive and Vail Road. This plan is required due to the increase amount of oversize truck traffic. Jac at; ufP'S => 6. Provide a traffic control plan for the trucks exiting out of site onto the S. Frontage Road. 7. The Town of Vail is requesting Layton Construction, takes another look at using more of S. Frontage Road exit route during the mass excavation process. As discussed during the staging meeting, you currently show 213 of dirt exiting out the S. Frontage Rd. and 113, out W. Meadow Drive. This 1/3 of the dirt removal is proposed or scheduled during Vail Peaks ski season. The Town of Vail would prefer to see the number more like 80120, or less going out W. Meadow Drive. Please adjust and revise. 8. If unable to address the above request, Layton Construction and HB Development should be aware that the Town of Vail reserves the right to limit amount of use on W. Meadow Drive for construction activity during the summer and winter months. ✓G�r� 9. Provide a Copy of the Storm water Discharge Permit from the State of Colorado.