HomeMy WebLinkAboutLayton Const (5)TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2138
NOTE
DEPARTMENT OF COMMUNITY DEVELOPMENT
THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT
Job Address:
1 VAIL RD VAIL
Location.....:
13 VAIL ROAD
Parcel No...:
210107101016
APPLICANT LAYTON CONSTRUCTION CO. INC 12/19/2006
License: 333 -A
CONTRACTOR LAYTON CONSTRUCTION CO. INC 12/19/2006
License: 333 -A
OWNER VAIL DEVELOPMENT LLC 12/19/2006
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Permit # PW06 -0216
Status ...: ISSUED
Applied..: 12/19/2006
Issued . .. 12/19/2006
Expires . .:
Phone: (801) 568 -9090
Phone: (801) 568 -9090
Desciption:
Temp site access for allow and creating a access point to
site for installation of construction trailer. Permit will
expire April 15, 2007 REZONING OF CHATEAU & ALPINE STANDARD
SITES FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO
HIGH DENSITY MULTI FAMILY DISTRICT (HDMF)
#+##*###****###**##****##**###*#####* # # # * *+ # # * * # # * # # # # * * # # # # # # # * # # ## FEE SUMMARY ###**######***#**#**###### # # # * # # # * # * * # * # # # # * * # # * # # # # # * # ##
Public Way ------ > ??
Investigation - - - - -> ??
Bond Amount - - -> Payments--------- - - - - -> $132.50
BALANCE DUE ---- > $0.00
TOTAL FEES --- > $132.50
Approvals:
Item: 05500 PUBLIC WORKS
12/19/2006 is Action: AP Permit will expire 4 -15 -07
12/19/2006 is Action: AP
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
Cond: CON0008612
Only use of small construction vehicles allowed during
winter ski months.
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec /detail book available in April of 1998.
* * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN
ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
0
TOWN OF VAIL, COLORADO Statement
Statement Number: R060002124 Amount: $132.50 12/19/200610:36 AM
Payment Method: Check Init: LS
Notation: ck# 1265
-----------------------------------------------------------------------------
Permit No: PW06 -0216 Type: PUBLIC WAY PERMIT
Parcel No: 2101 - 071 - 0101 -6
Site Address: 1 VAIL RD VAIL
Location: 13 VAIL ROAD
Total Fees: $132.50
This Payment: $132.50 Total ALL Pmts: $132.50
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
ST 00100003112100 PUBLIC WAY FEES 132.50
MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE
APPLICATION FOR
RIGHT OF WAY USE- STREET CUT PERMIT
PR3 #: ,/ p 8' Town of Vail
PW#f: Public Works Dept
Parcel #: 1309 Elkhom Dr
Bldg Permit # B OI /mil/ Vail, CO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use -
Street Cu,. Permit and forfeiture of application fees. By signing this permit, the applicant declares nelshe has read all contents of
this document;.Town of Vail Roadway Standards and chapters of Title S — Public Ways and Property, of the Vail Municipal Code
and is fully aware of its requiremen`tss and agrees to pay all applicable fees. Application Fee: $50.00
1�( C, 7, STl�l�G7O/�I ' Company col- Jk
Company Name: - Phone:
City/State/
Company Address: 107OS, SNP ( 121<w) Zip:
Contractor _f1 L7L�7�15E = 333 j 11 /
License Number: L!%fI-! GDl�7I2/t GTGK =lI/���T�III'SSDI mail :- :,GIClIr1�°;l�ll�i�%/%�/ls /. �/'�
Contact el-'' =310
Contact Name: Pews �"� �` Phone:
ROW Use Location: W MCkbvW Ate'' :
�}� ��
Requested ROW i eq essted 1 Z
Use Dates: �9. mbrk Times.: �� ��✓% 777
G
Purpose for Request: ;Street Cut Dimeusron (>f applicable) `
❑ Underground Utility Installation t UK
• Landscaping
• Temp Site Access
• Construction Staging " Widt:V -1 n 41)
• Roadway Construction
ReKva
Other (explain): bRiygLo %X � ' Total Squ Footage:
-.
%MP A-u ss vy v PR
Requested ROW Use: �::- _? _ __
• Single Lane Closure— Ift of cloiEY (including taper)
• Two Lane Closure — ift of closure• (uirludmg taped t
• Three Lane Closure — lft of closutes(mcludmg tapei)�_ -=
• Sidewalk/Bike Path Ift*of closure W =
F.:-. ' ......'
f L. 1 _ + ,
1. fikpplicanttshall submit traffic control plan, and work. site /staging plan with tilts application Traffic
{;Control Pian!shall *be in rom�lianee withfhe =MUTCD i 4shall �hotiwstreets withs.uames, .99peent
:mte'rsections, adva3lced warning s bnage taper lengths,-buffer~spaceiand w_ ork zone dimensions. Na full
-streef closures areallawerl � �' � � '. ; },�- u F.
2. Applicant must contact Puoic Worlss bepartment at 479 -2 98 24 hours prior to commencing of work.
Failure to notify the Towr. will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routing application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
lcel Enery (800-9222-1987) Qwest (800 -922 -1987)
Comcast (800 - 922 -1987) Holy Cross Electric (800- 922 -1987)
Eagic River Water &-Sanitation District (970 - 477 -5453
Town of Vail Electric (970 - 479 -2158) Town of Vail Irrigation. (970 - 479 -215
1 Ot4f, i?i K W
Print Appiicant Name
Signature
F:1PW\Specifica1ions \RD)A1Y S=dards \ROW permitsTermit Application.doc
Date
low
RANE 2
CANSTRUCTICIN
'—'FENCING (TYP) "
4r^ h�ifl
a PORTABLE
TOILETS
r�
PARKING
•:� � (9'X1$')
loop
PuEp7i1�T,;.p;,y
II �
RIVAIE DUPLE"
RESIDENCES
B2A AND 82B
AEADOW DRIVE�ys
• 1 j �Y. '��� 3X5. � � ,
+{,Y""`?L:+,,d`
Wf F
( 0
MAINTAIN ACCESS
To E)aSTING
FIRE HYDRANT
+a ea
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
$ 0.15 x x - $
Single Lane = $ _
$ 0.45 x x
Two Lane = $ _
$ 1.50 x x
Three Lane _ $ _
Sidewalk /Bike Path
$ 0.15 x x
Fee Months S ft of Closure
$ 0.25 x x $
Paved Surface 22.50
Non -Paved Surface $ 0.05 x x -1`� _ $
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
$ 1.00 x x = $ -
Single Lane = $
Three Lane _
Two Lane
$ 3.00 x x
$ 6.00 x x = $ -
_
Sidewalk /Bike Path
$ 0.50 x x $
Fee Months S ft of Closure
Paved Surface $ 1.00 x x - Non -Paved Surface $ 10x 2 x 150 =
Sub -total $ 82.50
Street Cut (min $50)
Non - Moratorium Streets
Surface Fee S ft of Cut
ACCIPCC $ 0.30 x - $
Brick Paver $ 1.00 x - $
Pothole (each) $ 50.00 x - $
Non -Paved Surface $ 0.05 = $
Moratorium Streets
Surface Fee S ft of Cut
ACC /PCC $ 8.00 x $
Brick Paver $ 15.00 x - $
Pothole (each) $ 200.00 x - $
Non -Paved Surface $ 0.25 - $
Sub -Total $
Application /Inspection Fee $ 50.00
$ 132.50
Total Permit Fee
Temp site access on W. Meadow Drive
F.'IPIMSpecifications\RDWY StandardslPermit Fee Worksheet.xls
Deprtrtment 0096hr Works f� Transportation
08/08/2006
Layton Construction Company, Inc.
9090 S. Sandy Parkway
Sandy, Utah 84070
Attn: Doug Carley, Project Manager
RE: Staging plans comments for the Four Season Project
Mr. Doug Carley,
J 1M A4WF, IL aH( 8- ly -Glo
1309 Elkhorn Drive
Vail Colontdo= 81657
970479 -2158
+�y��]�� 00%&I Fax: 970 - 479 -2166
1.V111�I www.V4ilgov.c »m
Sea PERM iT AftCat
D iF7FQ `t'-29 -oc
Here are the comments regarding the staging plan.
Note: Staging plans are required for both winter and summer months of each as updated
construction schedules. Public way pe and fees are also required when d is ex ire.
--T-
;� cess from
4- ✓ I. vide a Public way permit and fee in the amount of $132.50 dollars for temp site ac
W. Meadow Drive. This permit will expire on Nov. 1, 2006
,R,,,,J' ft m ✓ 2. -Provide a.permit fee of 4$ 00.ars for the Holy Cross utility relocation and staging on the S.
Frontage Rd.
�wr c� rfl � �, t!. ✓ 3. Provide a permit fee of $1987.00 dollars, for the permit submitted for dewatering.
fi�Lf'r1� 4. No sidewalk closure along the S. Frontage Rd. allowed unless an alternative route is provided and
approved by the Town of Vail Public Works Departmerrt.
GP. /Cl; �tsTPki5c5 5. Provide traffic control plan for the intersection of W. Meadow Drive and Vail Road. This plan is
required due to the increase amount of oversize truck traffic.
Jac at; ufP'S => 6. Provide a traffic control plan for the trucks exiting out of site onto the S. Frontage Road.
7. The Town of Vail is requesting Layton Construction, takes another look at using more of S.
Frontage Road exit route during the mass excavation process. As discussed during the staging
meeting, you currently show 213 of dirt exiting out the S. Frontage Rd. and 113, out W. Meadow
Drive. This 1/3 of the dirt removal is proposed or scheduled during Vail Peaks ski season. The
Town of Vail would prefer to see the number more like 80120, or less going out W. Meadow
Drive. Please adjust and revise.
8. If unable to address the above request, Layton Construction and HB Development should be aware
that the Town of Vail reserves the right to limit amount of use on W. Meadow Drive for
construction activity during the summer and winter months.
✓G�r� 9. Provide a Copy of the Storm water Discharge Permit from the State of Colorado.