Loading...
HomeMy WebLinkAboutLayton Const (8)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 St FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2158 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT LAYTON CONSTRUCTION CO. INC 04/02/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 04/02/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 04/02/2008 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Permit # PW08 -0027 Status ... Applied. . Issued . . . Expires . .: APPROVED 04/02/2008 04/02/2008 Phone: (801) 568 -9090 Phone: (801) 568 -9090 Desciption: Lane closure on S. Frontage Rd. for set up and tear down of a crane. 3 -24 and 3 -26 -08 ***************************»********* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY **************#************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Public Way - - - - -> ?? Bond Amount - - -> $0.00 TOTAL FEES - - -> $1,050.00 Approvals: Item: 05500 PUBLIC WORKS 04/02/2008 cdelles Action: AP Item: 05550 ENGINEERING CIVILS Payments--------- - - - - -> $1,050.00 BALANCE DUE ---- > $0.00 CONDITION OF APPROVAL DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * ** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN * * ** ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R080000383 Amount: $1,050.00 04/02/200812:43 PM Payment Method:Credit Crd Init: CAD Notation: paid with credit card cc5031 ----------------------------------------------------------------------------- Permit No: PW08 -0027 Type: PUBLIC WAY PERMIT Parcel No: 2101 - 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: 13 VAIL ROAD Total Fees: $1,050.00 This Payment: $1,050.00 Total ALL Pmts: $1,050.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- ST 00100003112100 PUBLIC WAY FEES 1,050.00 a Z MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERIAIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE - STREET CUT PERMIT Town of Vail PRI *: 03'04-(p5 Public Works Dept PWW: 0g -oo2.7 1309 Elkhorn Dr Parcel #: Vail, CO 81657 Bld Permit B all (�/ 6 WARNING: Inclusion of false information in this permit application establishes an automatic dental for a Right of Way Use Street Cut Permit and forfeiture ol'application fees. By signing this permit; the applicant declares he/she has read all contents of this document, Town of Vail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: y50,00 Company Company Name: ' (�%l.Sl : (( J. Phone:. �� %'-�� b �S ' (� f 0 City /State Company Address:_7n2, 0 �' ki rem N'. Zip: rs �u �yn7e� Contractor °• License Number: Email: Contact •• • Contact Name: �� / CE C� .. - Phone: 9 70" VD L /' .7 7 ROW Use Location: 5 Requested ROW3''9 .6 Requested Use Dates: rtal- . Work Times:, / _ Purpose for Request: _ Street Cut Dimension (if applicable): ❑ Underground Utility Installation • Landscaping Length: • Temp Site Access - , • Construction Staging Width (min 4'): • Roadway Construction 4' Other (explain): 40 - To tal,Square.Footage: Requested -ROW Use: It Single Lane Closure— Ift of closuii-(including,taper) ;;Z= - ❑ Two Lane Closure— Ift of closure'(including taper) ❑ Three Lane Closure — Ift of closure (including taper) ❑ Sidewalk/Bike Path`' - Ift. of closure ❑:. Other (explain): 1. 'Applicant shall submit a traffic control plan and work'site /staving plan with this -application. Traffic Control Plan shall be in compliance with the MUTCD and shall sbow streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. 1Yojul! ,rYreei closures are a!lo�ved. :. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routine application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Enery (800 - 922 -1987) Qwest (800 -922 -1957) Comcast (800 -922 -1987) Holy Cross 'Electric (800 - 922 -1987) Eagle River V,'ater g Sanitation District (970 - 477 -5453) Town of Vail Electric (970-479-22 15 9) Town of Vail Irrigation (970 -479 =2158) Print Applicant Name Applicant F: \cd ev \FORMS \Permits \Public .W orl,.s \rov.'_appi i c ati on_' 006. doc Dal_ 0 10/23/2007 17:01 19702420530 CC ENTERPRISES PAGE 02/02 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor: LAYTON CONSTRUCTION MHT #13 Project: 4 SEASONS RESORT - SOUTH FRONTAGE ROAD REVISED Method of Handling Traffic: SHOULDER CLOSURE PREPARED BY, N f &w44 Wa,1 107 w B ATSSA TCS NAME DATE PHONE: 970 -242 -0669 s CERTIFICATION # 00037043 ISSUE DATE: 11/1112004 EXPIRATION DATE: I.Q Y > ROUND 1 - -- - - _ - -- -- -- -- � � � � � BOUT ' NOTES: 1, CONTRACTOR WILL NEED SHOULDER CLOSED DURING WORKING HOURS ONLY 2. REFER TO MUTCD FIGURE 61-1-3 FOR TYPICAL SHOULDER CLOSURE SETUP. SIGNS AND DEVICES: 2 - UTILITY WORK AHEAD 1 - SHOULDER WORK CONES Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x x Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x x Fee Months Paved Surface $ 0.25 x x Non -Paved Surface $ 0.05 x x Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x 2 x 500 Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months S ft of Closure Paved Surface 1 $ 1.00 x x Non -Paved Surface $ 020 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface Fee S ft of Cut ACC /PCC $ 0.30 x Brick Paver $ 1.00 x Pothole (each) $ 50.00 x Non -Paved Surface 1 $ 0.05 Moratorium Streets Surface Fee S ft of Cut ACC /PCC $ 8.00 x Brick Paver $ 15.00 x Pothole (each) $ 200.00 x Non -Paved Surface $ 0.25 Sub -Total Application /Inspection Fee Total Permit Fee 03/24/2008 Four Season Single lane closure for two days on the S. Frontage Road to set up and tear down a crane. Dates of scheduled closure are 3 -24 -08 and 3 -26 -08 FAPMSpecificationslRDWY StandardslPermit Fee Worksheet.xis _ $ $ 1,000.00 $ $ 1,000.00 _ $ _ $ $ 50.00 $ 1,050.00