Loading...
HomeMy WebLinkAboutLayton const (9)TOWN OF VAIL 75 S. FRONTAGE ROAD VAIL, CO 81657 970479 -2158 NOTE DEPARTMENT OF COMMUNITY DEVELOPMENT THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT LAYTON CONSTRUCTION CO. INC 04/02/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 04/02/2008 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 04/02/2008 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Desciption: Single lane closure on W. Meadow Dr. for a chiller delivery. 3 -21 -08 Permit # PW08 -0028 Status ... . Applied..: Issued . . . Expires . .: APPROVED 04/02/2008 04/02/2008 Phone: (801) 568 -9090 Phone: (801) 568 -9090 ************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ******************#####*# k**# * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Public Way ------ > ?? Bond Amount --- > $0.00 TOTAL FEES - - -> $350.00 Approvals: Item: 05500 PUBLIC WORKS 04/02/2008 cdelles Action: AP Item: 05550 ENGINEERING CIVILS Payments--------- - - - - -> $350.00 BALANCE DUE ---- > $0.00 CONDITION OF APPROVAL DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * ** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN * * ** ADVANCE BY TELEPHONE AT 479 -214.9 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. • i MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE - STREET CUT PERMIT Town ofVail PW4: & 3-- o4b$ Public Works Dept PW #• o: -oo z$ 1309 Elkhorn Dr Parcel #: Bldg Permit k B n — 0/ 4 6 Vail, CO 81637 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use - Street Cut Permit and forfeiture of application fees. By signing this permit; the applicant declares he/she has read all contents of this document, Town orVail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: $50.00 1 n Company c q Company Name: 1 it .//1'1 1?<7 s (�Q, Phone:. S`0 %'..s t�0 ` [0 / City/State Company Address:(?/19 0 .5e tj,( /�r"�../ Zip: 4 Contractor License Number Contact Name: ROW Use.Location: Requested ROW Use Dates: N.�W-M � • Email: �jl'P"r' ' • ®Ir�_J�/_Z'�� -� C1��OG� Contact n Phone: 9 7O- �lO -.;1� 7 •% Purpose for Request: Street Cut Dimension (if applicable): ❑ Underground Utility Installation a ❑ Landscaping Length. • Temp Site Access - • Construction Staging Width (min 41: ❑ Roadway Construct' n Other (explain):C ,'llec{P1 /G� Total.SquareFootage: Requested -ROW Use: J>Si Single Lane Closure — Ift of closure (including.taper) �C?tS ❑ Two Lane Closure — Ifl of closure (including taper) ` ❑ Three Lane Closure — lft of closure (including taper) J. ❑ Sidevwa1VBike Path'- 1f1•of closure - ❑:. Other (explain): 1. 'Applicant shall submit a traffic control plan and work'site /staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. lVojul/ street closures are allowed. 2. Applicant must contact Public Works Department at 479 -2195 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3, Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routine application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Enery (800 - 922 -1987) Qwest (800 -922 -198 Comcast (800 -922 -1987) Holy Cross Electric (800 - 922 - 1987)_ Eagle River Water & Sanitation District (970 - 477 -545 Town ofVail Electric (970 -479 ?158 r-r\_ nee_ Print Applicant Name Town of Vail Irrigation (970-479-2-158) Applicant Signature FAcdevTORMSTermits Public Worts \rocv_application_2006.doc Date .;R0M':.CC,ENTERPRISES ti FAX N0. :9702420530 Sep. 10 2007 01:53PM P9 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor: LAYTON CONSTRUCTION MHT #8 Project: WEST MEADOW RD - VAIL - 4 SEASONS RESORT Method of Handling Traffic: ONE LANE ROAD N PREPARED BY: w ATSSA TCS NAME DATE S PHONE; 9.70- 242 -0669 CERTIFICATION # 0003704.3 ISSUE DATE:. J EXPIRATION DATE: "_. S, FRONTAGE ROAD / / % r ROUND 1 -A- - — — . —. - - -- — — — — — — . ` BOUT ' — — — — — **% woo of RVAU WORK C FOUR SEASONS-) T � n 100' GATE GATE 1 Wnov S,TE 1 \ / ,, L 100- DEAD END WEST MEADOW RD 100' 100' �? ROAD WORK AHEAD NOTES; 1, CONTRACTOR WILL NEED FLAGGERS TO STOP TRAFFIC FOR THE TRUCKS TURNING ON HIGHWAY DURING WORKING HOURS ONLY 2, ONE FLAGGER WILL BE AT THE FIRE STATION TO ALLOW ACCESS FOR THE FIRE DEPT, 3. FLAGGERS WILL USE RADIOS TO COMMUNICATE. SIGNS & DEVICES: 3 - ROAD WORK AHEAD 2 - FLAGGER SYMBOLS J EAST MEADOW DRIVE Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x x = $ Two Lane $ 0.45 x x = $ Three Lane $ 1.50 x x = $ Sidewalk /Bike Path $ 0.15 x x = $ Fee Months S ft of Closure Paved Surface $ 0.25 x x = $ _ Non -Paved Surface $ 0.05 x x = $ - Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x 1 x 300 = $ 300.00 Two Lane $ 3.00 x x = $ - Three Lane $ 6.00 x x = $ Sidewalk /Bike Path $ 0.50 x x = $ - Fee Months S ft of Closure Paved Surface $ 1.00 x � x = $ - Non -Paved Surface $ 0.20 x x = $ Sub -total $ 300.00 Street Cut (min $50) Non - Moratorium Streets Surface Fee S ft of Cut ACC /PCC $ 0.30 x = $ Brick Paver $ 1.00 x = $ Pothole (each) $ 50.00 x = $ Non -Paved Surface $ 0.05 = $ Moratorium Streets Surface Fee S ft of Cut ACC /PCC $ 8.00 x = $ Brick Paver $ 15.00 x = $ Pothole (each) $ 200.00 x = $ Non -Paved Surface $ 0.25 = $ - Sub -Total $ Application /inspection Fee $ 50.00 Total Permit Fee $ 350.00 03/24/2008 Four Season Single Lane closure on W. Meadow Drive Chiller Delivery F. PMSpecificationskRDWY StandardslPermit Fee Worksheet.xls TOWN OF VAIL, COLORADO Statement Statement Number: R080000384 Amount: $350.00 04/02/200812:48 PM Payment Method:Credit Crd Init: CAD Notation: paid with credit card cc 5031 ----------------------------------------------------------------------------- Permit No: PW08 -0028 Type: PUBLIC WAY PERMIT Parcel No: 2101- 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: 13 VAIL ROAD Total Fees: $350.00 This Payment: $350.00 Total ALL Pmts: $350.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- ST 00100003112100 PUBLIC WAY FEES 350.00