HomeMy WebLinkAboutPW 2006 (2)COLORADO DEPARTMENT OF TRANSPORTATION UTILITY PERMIT PERMITTEE Name DEPARTMENT USE ONLY Date issued 10/17/06 HOLY CROSS ENERGY Permit # 13,291 Address S.H.# 070A Frontage Rd. M.P. 176mm P.O. BOX 2150 District 03 GLENWOOD SPRINGS, CO 81602 Section 02 Telephone: (970) 949-5892 Representative: JEFF VROOM Patrol 2MARY4 NOTICE TO PERMITTEE: You must notify owner or operator of underground utility facilities at least two (2) business days prior to making or beginning excavations in the vicinity of such facilities, as required under Section 9-1.5-103, Colorado Revised Statutes. CALL UTILITY NOTIFICATION CENTER OF COLORADO (UNCC), 1-800-922-1987 & CDOT 970-2 48-7 2 30, FOR MARKING OF MEMBER UTILITIES.. CONTACT NON-MEMBER UTILITIES DIRECTLY ACTIVITY DESCRIPTION (Furnished by Permittee) PURPOSE XX Installation XX Adjustment ❑ Removal ❑ Maintenance of existing Facility FACILITY (Type, size, class of transmittant, design pressure or potential, etc.) INSTALL 2-4 INCH PVC CONDUITS & 3 PHASE 14.4/24.9K%' PRIMARN ELECTRIC CABLES TO RELOCATE TO EXISTING ELECTRICAL VAULT. NATURE OF INSTALLATION XX Longitudinal (Parallel) XX Transverse (Crossing) XX Buried" ❑ Aerial/Ground-mounted ❑Attach. To Hwy. Str. No. LOCATION State Hwy. No. 070A Frontage Rd. County EAGLE City/Town VAIL Milepoint(s) 176mm Intersecting Feature(s): WEST OF EXIT 176 SOUTH ROUNDABOUT ADDITIONAL REMARKS CURRENT INSURANCE CERTIFICATE ON FILE. PLEASE REVIEW & COMPLY WITH THE ATTACHED "LATE FALL, WINTER & SPRING SPECIAL PROVISIONS FOR UTILITY INSTALLATIONS" For underground facility location information, contact: UNCC & CDOT Telephone 1-800-922-1987 & (970) 248-7230 SPECIAL PROVISIONS (completed by the Department) The Special Provisions are terms and conditions of this permit. Any work shall only be in accordance with the approved plans and special provisions as set forth in this permit and its attachments. The CDOT inspector is LARRY DUNGAN Telephone (970) 845-8816 Fax (970)845-8816 Work is to be completed on or before: 11/15/06 or within days, (as applicable) Work time restrictions: DAYLIGHT HOURS ONLY. NO WEEKENDS OR HOLIDAYS. Designated minimum cover is See SPECIAL PROVISIONS #24 Designated overhead clearance is NA (ALSO SEE ATTACHED STANDARD PROVISIONS, AND ADDITIONAL SPECIAL PROVISIONS), (TRAFFIC CONTROL MUST CONFORM TO THE MUTCD) Other: FIELD INSPECTOR SHALL BE NOTIFIED 48 HOURS PRIOR IS TO BEGIN OR PERMIT IS VOID. Permittee is prohibited from commencing any work within highway ROW prior to issuance of a fully endorsed and validated permit. Permit, plan exhibit, insurance certificate(s), and traffic control plan must be available on site during work. High visibility vests are required at all times during working hours. 1. Your request to use and/or occupy state highway system rights of way as described above is granted subject to the terms and conditions of this permit, including the Standard and Special Provisions as shown on the permit and all attachments hereto. 2. To the extent authorized by law, Permittee hereby assumes, releases and agrees to indemnify, defend, protect, and save the State of Colorado harmless from and against any loss and/or damages to the property of the State of Colorado, third parties or the Permittee's facilities, and all loss and/or damage on account of injury to or death of any person whomsoever, arising at any time, caused by or growing out of the occupation of Colorado State Highway rights of way by Permittee's facilities or any part thereof, including but not limited to installation, adjustment, relocation, maintenance or operation, or removal of existing facilities, unless such loss and/or damage arises from the sole negligence or willful conduct of the State of Colorado or its employees or agents. 3. Failure by the Permittee to comply with any of the included terms or conditions may subject this permit to suspension or cancellation, at the discretion of the Department of Transportation. 4. THIS PERMIT IS NOT VALID UNTIL FULLY ENDORSED BY ALL PARTIES, WITH DATE OF ISSUE AFFIXED BY AN AUTHORIZED REPRESENTATIVE OF THE DEPARTMENT. A FULLY EXECUTED COPY OF THIS PERMIT MUST BE ON FILE AT THE TRANSPORTATION REGION OFFICE. 5. In accepting this permit the undersigned, representing the Permittee, verifies that he or she has the autho ty to sign for and bind the Permittee, and that he or she has read, understands and accepts all the included conditions. Attested 7r . Dat 1 I Signature f Date _ _ _ r-:-___ _ Title ✓ ec' lh I Title 1 c rl, ) COLORADO DEPARTMENT OF TRANSPORTATION Chief Engineer : By A il- ED FINK / MIKE VERKETIS Date 110/17/06 CDOT Form # 333a Rev. 02, .y E)WNG FIRE HYDRANT BE REMOVED •t. - PROPOSED FIRE HYDRANT ASSEMBLY MATH 12'X6' TEE AND 6- GATE VALVE (DRY TAP) (MUELLER MOUNTAIN HYDRANT) NOTE: FIRE HYDRANT LOCATIONS PER VAIL FIRE DEPARTMENT INSTALL 2-4" PVC CONDUITS (JOINT TRENCH) ~'~'`PROP0.SED IRRIGATION LINES LANDSCAPE PLANS "It 5' TYPE R 4 tr. y( r _"_t2 tti y 1 ;ABANDON WA t~ ~ L t ' T TO EXISTING MAIN r x \ EXISTING PEDESTA TO REMAIN k' ~--_l PREVIOUS I 4' STORM MANHOLE (TYP) INSTALL PTV PEDESTAL • PROPOSED BUILDING ELECTRIC TRANSFORMERS. INSTALL TRANSFORMER VAULTS IN ACCORDANCE MATH HOLY CROSS ELECTRIC STANDARDS AND SPECIFICATIONS. cl ` AREA DRAINS (TYP) EXISTING ELECTRIC LINE TO BE q ABANDONED AND REMOVED RE: MECH. PLANS "FOLLOWING" INSTALLATION OF NEW ELECTRIC SERVICE TRANSFORMER PLACE EXPOSED ETV TO REMAIN LINE IN 4" PVC CONDUIT . 4" PVC FOR PTV TYPE INLE1 T l ABANDON GAS LINE .'RISES FRX ND. :97e2420530 May. 26 2006 10:26RM P2 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS; INC contractor, IAYTON CONSTRUCTION REVISED ~J SOUTH FRONTAGE ROAD (POLE RELOCATE) 7 Protect, 4 SEASONS - VAIL U- U Method of Handling Traffic: SHOULDER CLOSED ON FOUR LANE ROAD N PREPARED By, ATSSA TCS NAME DATE PHONE 970-242-0669 5 CERTIFICATION # 00037043 umm ISSUE DATE: jLL1aQQ4 vWK IXPIRATION DATE: OlEODS 200' E- 350 - - FRONTAGE RD 350' ~ (I r ZONE CLO= It.o- NOTE: 1, CONTRACTOR WILL NEED SHOULDER CLOSED AND SIDEWALK CLOSED FOR POLE RELOCATION. WORK WILL LAST FOR ONE WEEK, CONTRACTOR WILL BE DIGGING A TRENCH SOUTH FROM FRONTAGE ROAD, AT NIGHT, TRENCH WILL BE BARRICADED VATH DRUMS AND FENCE. 2. REFER TO MLITCD FIGURE 6H~ FOR TYPICAL APPLICATION, SIGNS: T - SHOULDER WORK 2 - UTILITY WORK AHEAD 2 -SIDEWALK CLOSED 2 - TYPE U BARRICADE DRUMS/LIGHTS FENCE r« AVO 1309 Elkhorn Drive TOWN *ViAIL Lail, Colorado 81657 .970-479-2158 Pax: 970-479-2166 tuww. vailgou corn Department of Public Works d- Transportation 08/08/2006 Layton Construction Company, Inc. 9090 S. Sandy Parkway Sandy, Utah 84070 Attn: Doug Carley, Project Manager RE: Staging plans comments for the Four Season Project. Mr. Doug Carley, Here are the comments regarding the staging plan. Note: Staging plans are required for both winter and summer months of each year, as well as updated construction schedules. Public way permit and fees are also required when dates on permits expire. 1. Provide a Public way permit and fee in the amount of $132.50 dollars for temp site access from W. Meadow Drive. This permit will expire on Nov. 1, 2006. 2. Provide a permit fee of $400.00 dollars for the Holy Cross utility relocation and staging on the S. Frontage Rd. 3. Provide a permit fee of $1987.00 dollars, for the permit submitted for dewatering. 4. No sidewalk closure along the S. Frontage Rd. allowed unless an alternative route is provided and approved by the Town of Vail Public Works Department. 5. Provide traffic control plan for the intersection of W. Meadow Drive and Vail Road. This plan is required due to the increase amount of oversize truck traffic. 6. Provide a traffic control plan for the trucks exiting out of site onto the S. Frontage Road. 7. The Town of Vail is requesting Layton Construction, takes another look at using more of S. Frontage Road exit route during the mass excavation process. As discussed during the staging meeting, you currently show 2/3 of dirt exiting out the S. Frontage Rd. and 1/3, out W. Meadow Drive. This 1/3 of the dirt removal is proposed or scheduled during Vail Peaks ski season. The Town of Vail would prefer to see the number more like 80/20, or less going out W. Meadow Drive. Please adjust and revise. 8. If unable to address the above request, Layton Construction and HB Development should be aware that the Town of Vail reserves the right to limit amount of use on W. Meadow Drive for construction activity during the summer and winter months. 9. Provide a Copy of the Storm water Discharge Permit from the State of Colorado. 10. Provide co pies of the Utility Permits and Traffic Control Plan submitted to CDOT and Notice to Proceed. 11. Ne w Winter Staging plan will be required on or before Nov. 1. 2006. This plan will be good until April 15, 2007. 12. La yton Construction understands and will comply to the Vail Village/Lionshead Village Construction Hours Handout. 13. La yton will provide an updated Construction Schedule at the beginning of project and as needed or requested for the Town of Vail Public Works Dept. 14. Provide Tower Crane details 15. Coordination required on the replacement of the Spraddle Creek Culvert scheduled for the fall 2006. 16. Provide pr oposed plan for construction employee vehicle parking locations, during construction. 17. Provide details on the propose d covered walkway. (Temp lighting, snow removal, etc. etc.) 18. Provide details on ho w Layton Construction will manage dust control, anti-tracking, sweeping and house cleaning operations. Please feel free to call me if you have any questions, Thank you, Leonard Sandoval COLORADO DEPARTMENT OF TRANSPORTATION SPECIAL USE PERMIT []LANDSCAPE XXXGENRAL CONSTN []SURVEY []OTHER( PERMITTEE RECEIVED Name Date pisssu issued 12/19/05NLY BLACK DIAMOND RESORTS-VAIL, LLC Permit # 12,878 Address S.H.# 070A Frontage Rd. M.P. 175mm 50 SOUTH 6TH STREET, SUITE 1480 District 03 MINNEAPOLIS, MN 55402 Section 02 Telephone (612)313-0123 Representative: DOUG HIPSKIND Patrol 2MARY4 NOTICE TO PERMITTEE: You must notify owner or operator of underground utility facilities at least two (2) business days prior to making or beginning excavations in tine vicinity of such facilities, as required under Section 9-15-103, Colorado Revised Statutes. CALL UTILITY NOTIFICATION CENTER OF COLORADO (UNCCK DOT), 1-800-922-1987/(970) 248-7230, FOR MARKING OF MEMBER UTILITIES.. CONTACT NON-NIEMBER UTILITIES DIRECTLY ea NATURE OF ACTIVITY INSTALL SOIL NAILS FOR FOUNDATION SUPPORT AND TEMPARY DEWATERING WELLS. THIS WORK IS BEING DONE UNDER A LEASE AGREEMENT WITH CDOT RIGHT OF WAY SECTION. ALL TERMS AND CONDITIONS OF THIS AGREEMENT SHALL BE FOLLOWED. LOCATION: St,{ Hmy. No.070A Frontage Rd PrCOUn FP'r'EAGL cntiTU FRnIVTef:F Rnen eTFXr`T 17( RVAIL n►tlvn~IIn►tT 3~ ~C.p(s) S Other Location Information ADDITIONAL REMARKS CURRENT INSURANCE CERTIFICATE ON FILE. SPECIAL PROVISIONS (completed b the Department) The Special Provisions are terms and conditions of this permit. Any work shall only be in accordance with the special provisions and other applicable details as set forth in this permit and its attachments. The CDOT Inspector is: LARRY DUNGAN Telephone (970)845-8816 Fax (970)845-8816 Work is to be completed on or before: 8115/06 Ext. to 11115/06 (FX'T IF I or within days, (as applicable) Work time restrictions: DAYLIGHT HOURS ONLY, NO WEEKENDS OR HOLIDAYS. (ALSO SEE ATTACHED STANDARD PROVISIONS, AND ADDITIONAL SPECIAL PROVISIONS), (TRAFFIC CONTROL MUST CONFORM TO THE MUTCD) Other. Permittee is prohibited from commencing any activity within highway ROW prior to issuance of a fully endorsed and validated permit. Permit, insurance certificate(s), and traffic control plan must be available on site during work High visibility vests are required at all times during working hours. 1. Your request to perform the work as described above is granted subject to the terms and conditions of this permit, including the Standard and Special Provisions as shown on the permit and all attachments hereto. 2. To the extent authorized by law, the Permittee shall indemnify, save, and hold harmless the State, its employees and agents, against any and all claims, damages, liability, and court awards including costs, expenses, and attorney fees incurred as a result of any act or omission by the Permittee, or its employees, agents, subcontractors or assignees pursuant to the terms of this permit. 3. Failure by the Permittee to comply with any of the included terms or conditions may subject this permit to suspension or cancellation, at the discretion of the Department of Transportation. 4. THIS PERMIT IS NOT VALID UNTIL FULLY ENDORSED BY ALL PARTIES, WITH DATE OF ISSUE AFFIXED BY AN AUTHORIZED REPRESENTATIVE OF THE DEPARTMENT. A FULLY EXECUTED COPY OF THIS PERMIT MUST BE ON FILE AT THE TRANSPORTATION REGION OFFICE. 5. In accepting this permit the undersigned, representing the Permittee, verifies that he or she has the authority to sign for and bind the Permittee, and that he or she has read, understands and accepts all the included conditions. Attested Date I Signature Date [ 51-2,1 /6(- I__._____--_____-_-I-. _ Title I Title lcz NIA h 40L- aP ~i+~L 1~t~3?I{~t•1r i t-d G 1 vT-S Id1A.S A ~6 r !/~LS►.sgt~1Z 7T . of ('01 OR DO DEPARTNTE T OF TRANSPORTATION ( hi~~l F n"inrc; It W N ~ v ~ .r A a m C C ° ~ ry ~ • to C a ~ ~s ~ n • a O p `C O cs (D m p, tc O G O+ 'b ry LL. N C o n v N. 27, Q• O G. cr n CD y `C7 O Utl0 (D N r+ Z" •u In. 1= o o o.,~ n w n < p A D ' C CD ;7D' CD CD ( a w. ~ o o 000 0 - 0zn, 0 0 O 000 0 c 3 N N j CD W N N N N W 00 - FD W N N 0 0 N 07 ? N O 0 N 0 N -p N N N 0 O N 0 0 0 0 0 0 0 0 c 0~ 0 0 0 =000 0 0 0 0 .0 (D o 0) 01 0) 0 0) 0) 0) N O) 0 . m . (n Q n 2 G D E n S D G) c N D D a D , u Q) (n a O s. 2) 1 < ZI CD ZI C N (n m O1 < a (D a) a CD X 0 CL . a: c a: (a - ~ (n D G) CD CD G) D m o D a D ' ° 0 C7 n cQ ~ N (Q 0 (D CL (D O N (D N W 0 N = n O O =3 CD W (D O (D S 0 O O CD (O N O n 7 CD z; T Q =r U) 7 N O CD < O n r O ° o 7 a (Q (D c 3 m O (D N O m m `D n 3 a o m D C 0 (D ° 3 m =3 CD V~ N CL (D ~ N (D < (n (n . . d w •G 0 U) O CD N Q. O o m 3 rn O O r-F CD 3 m m Q D C~ O ~ N D n 0 r r-r D 0 r~ O N 1U (D (D (D x Q TI O ~ (D w O cn m N O Cn a~ ~v cc a ~ ~ o ~ o- c r o uo a ° w a o o Q° a m CL 0 P, CD r, C7 Cn ° o o C a N I is I'D Fl is C. w o a ulo o p CD o o ~ n (D c. C7, 5 CD o o rn° Q ~s N O°° ° o uq qlG a x o ff. f D c C 0~ a o y a a c a ~ (D ro ~ a cro ~ ° o CD a m b CD o w o ~ io cro T rn ° a. 7o w • ti a CD N W O* O ° p 0 O O O O= N CL ° N N (D pJ N N n W W N CL N n W - 0) W (D W W W O o O W N W O O - ~ W N N n N N N N N c n N (p N O N N N N ° N O O j;j• O (D ~ O O O O N O < O W 0 0 0 O 7 0 rn O W O O o . o O m O O) O O) O W O C O W W O O O O O O 0) O) O N O O 0 (n O 3 z1 f m 'r m G) _ , * . r . s = N 0) v ~ m m m m i m n n n (7 C7 m a 3 . CD (n m 7 3 p o 0) N CD O N CD U o (D m mp cn < o 0 ` -I c 0) CL - 0) S 0)• o - W v 2 0 (D (n W M U)i ° CD o W ID X X a o m v v n 3 3 •o v O ° N 0) ° (D 7 n, (2 m (D (D =3 (D - 7 C CD O (CD ° o a s 3 0 (D cn Q < M (D (D cc Q w ;:w -0 ° ~ =r c n (a 0' o O o -0 0 a c v o --I ° n p :E X, 9 o ° o 3 O h o =r 3 O o _ =r ° ° c i o G' -I O O ~ _ R v N O 'D . < N 0) < CD CL - O ~ 0 O O (D < (n O O 3 °o - W v O N o O n o) CD d O N CT O 7 EL U) d p j O N O N 0 d (D 7c = O n W co 0) a s < 0 ° rn a p :3 a c o m v 0 ~ m 0 0 3 No (D 0 o 0 3 ° cn ° U 3 (D C o. 0 N CD n y O C O o 0 C) d D (n (D N (Q W. CL ° NJ W a 0 (D 0 ( ° a m o C ) O g n 27 a) rn ' rn ~ o p_ cs O rn p IC3 o a (D o p o G7 rD rc °O`° ° " vC CD a C. o'er o o o r o Y as G. c o rD o < CL ° n y rP y -C3 (D P. Ki • vo ro y a w G W fD ul~ N a G CD b 0 < rL A pp WW a o c c n y O po F _ w cr (D ,0,,,~ C 0~ O C ~ p ° CD, a O O O o 0 0 0 O O S 0) 0 0 E O Q O N ? j =r N (D I (D W W W (D O W W n (A fD p~ W N N N N = N (n N N N° 0 N R co O O O (n O O O O O O (D O (o w N CD 0 0 O CD F 0 C) CD (D O, (n O (D ? O c i i (D W CD W W W 3 0 o m co co n C-D o m =r 0 n' (n CD I (o ca o 3 (D (D o > (n 3 0 3 v ° W w - W 7 - n m W 3(D O Q O (D D CD (Q (Q ° a m 3 0? m< c m `n 3 a o- C7 < 'c (n n w Z) CT (D L m c s CD 3a o C W D n' (<D 0 CD CD CL CD < :3 - o E-L o- --4 ° a a o m W < o o-~ m O 0 0 = ° n o o- - (D o< -o -a cn m W W o o co ° 3 3 m o 0 d 07 Q C W -o co (n 3 0 0 v i -0 m ° 0) m (o > > - = a Xc (o (D (n (A CL m n 7(n O O ° < m n (o W N O O 7 N c -p o- O n 3 3 cDD m o_ (n O 7' (D (D o CD (D CD (D 0 FD' (D 0 (D (D m N ° N 10 to < in v ° (D. o o ° 3 N (fDi O v O W O = N O (n . O CD (D O (n N 7' (n W O N 7 C 4 C:) CD N 3 o o o m m (D(Q (n 0 o CL 0 O p (p ~ W (O W 00 W J W W W CT W A W W W N W W O N (D N pD O CL m Laf I La§ o o~ a a m 0 c o T w (n c CD 0 N CD < u) c CD T .y+ v I C1 0 3 Z O m oo m m m v a 3 N j O- c a m 'a CD m S. CD < D cn - (n , c 3 Q m Cl. m CD F CD 3 N O N N S D O K V (n p p w O 7 .(1 O O (D 5. 0 O O y 0 3 o cn x :3 :3 n 3 3 (D U 3 3 C (D 3 N c (On J n CD 7 (D 7 O N Z (D (A y N C71 Ut cn A N N N A N (11 m N 0 N w w 0 _ d w N N _ d a) N N 0) O O ~G tll ~ N ~ U! Dl `G ~ N ~G N `G N D) 'G `G N `G 41 'G N K N O O T O -4 c O T O 7 O 7 O > 3 3 7 aD 0 O 0 V M. = 7 Z4 =r C (D 522 3 W ( ~ ~ eD . TI I~Z A O ~ O -W+ O Qo- O O O O (O O _ (O O _ Q O _ O O O G c C <D O O O O D) O) 01 O O O O Q1 01 O) 01 O Ol N N d Q CL C C C 7 Gl CO) M (O N N -n :3. T :3. - T M. S C -iT G (D Q O 3 T 7 C T 11 7 V N O (v d 3 O N O (D N (n OD OD ` M. co A -4 N ` N , m (\i J' `0 r 00 N O.~ U1 A O m O = y O m : OD o 0 0 W `o v o V 0 (T 0 (O. o Q7 o OOI o' ` o 0 0 0 W 0 rn rn rn rn rn rn rn rn rn rnl rnl N ~ =r A d C (O m - N _ W W O ~ -D O X . v CD C (D N (`]1 c W 3 m ° = C) G) D (`An p (D Q1 ;a 0 D co _ (Nn C N D ~ rn V = N W n v D D q c au D i o m H I L L G L A Z I E R A R C H I T E C T S TRANSMITTAL DATE: April 3, 2006 To: Leonard Sandoval Town of Vail Construction Project Coordinator FROM: Andrew A. Bober VIA: Hand Carried PAGES: PROJECT: Four Season Resort - Vail, Colorado HGA #02028 COMMENTS: Leonard, I have attached a copy of Layton Construction, "Summer Staging Plan Notes", dated March 30, 2006 for your review and comments. This is a preliminary plan and will be revised to adjust location of Jersey Barriers along South Frontage Road and comments received by you. Layton will also prepare a plan for Winter Staging Plan for your review and comments. It is hoped that we can discuss your comments at the April 11, 2006 meeting in the TOV offices. Thank you, Andy Cc 925 A L M A S T R E E T PALO ALTO CALIFORNIA 94301-2405 TEL 650.617.0366 FAX 650.617.0373 WWW.HILLGLAZIER.COM Four Seasons Staging Plan Meeting staging-piang n: Winter, to-be-strbmitted-before-Nov. 1, 2006. Spring of 2007, to be submitted before April 1, 2007 Provide information on parking arrangements, access and how many on site. Summer and Shw~wb 'k an S~~P Winter. No use of S. Frontage Rd. or W. Meadow Drive for temp parking or staging. o,,}{ Provide detailed updated construction schedule. To reflect the Village Construction Hours handout. u I(- ZDW- Construction fencing should withstand 90 miles per hour winds. Provide stamped detail. 4 Parking submitted is for winter use. Parking is free in VTRC during summer months. Please note, free parking is al~so` for skier guest, not only for construction workers. # Or/ wotky~&- Provide traffic control plans for S.Frontage Rd. and Vail Rd. if any plans to use these areas are needed. w S. rrll Discuss proposed covered walkways Snow removal durin winter months? Width of walkway ~*,W-Wide ? - Lighting ? Concrete barriers - Barriers on plan are shown separated. They must be attached.. Adjust and revise. Maintance? S l c Yk u~ r 1) s "~-dd t C? Provide copy of storm Water discharge permit Submit Application of Public Way Permit, access and fees Provide detailed Temp light plan. Provide Stamped covered walkway detail plan.-t Provide stamped erosion control plan, Provide anti-tracking, sweeping and dust control plan. Address any PW civil plan, Fire, PD, Loading and Delivery, issues. Discuss coordination of the replacement of Spraddle Creek Culvert. Others: Question for Staff: -Acc s-, -~o V7i'rP Aa,es s ~ fig K CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION SECTION 3301 GENERAL 3301.1 Scope. The provisions of this chapter shall govern safety during construction and the protection of adjacent public and private properties. 3301.2 Storage and placement. Construction equipment and materials shall be stored and placed so as not to endanger the public, the workers or adjoining property for the duration of the construction project. SECTION 3302 CONSTRUCTION SAFEGUARDS 3302.1 Remodeling and additions. Required exits, existing structural elements, fire protection devices and sanitary safe- guards shall be maintained at all times during remodeling, al- terations, repairs or additions to any building or structure. Exceptions: 1. When such required elements or devices are being re- modeled, altered or repaired, adequate substitute pro- visions shall be made. When the existing building is not occupied. 3302.2 Manner of removal. Waste materials shall be removed in a manner which prevents injury or damage to persons, ad- joining properties and public rights-of-way. SECTION 3303 DEMOLITION 3303.1 Construction documents. Construction documents and a schedule for demolition must be submitted when required by the building official. Where such information is required, no work shall be done until such construction documents or sched- ule, or both, are approved. 3303.2 Pedestrian protection. The work of demolishing any building shall not be commenced until pedestrian protection is in place as required by this chapter. 3303.3 Means of egress. A party wall balcony or horizontal exit shall not be destroyed unless and until a substitute means of egress has been provided and approved. 3303.4 Vacant lot. Where a structure has been demolished or removed, the vacant lot shall be filled and maintained to the ex- isting grade or in accordance with the ordinances of the juris- diction having authority. 3303.5 Water accumulation. Provision shall be made to pre- vent the accumulation of water or damage to any foundations on the premises or the adjoining property. 2003 INTERNATIONAL BUILDING CODE@ 3303.6 Utility connections. Service utility connections shall be discontinued and capped in accordance with the approved rules and the requirements of the authority having jurisdiction. SECTION 3304 SITE WORK 3304.1 Excavation and fill. Excavation and fill for buildings and structures shall be constructed or protected so as not to en- danger life or property. Stumps and roots shall be removed from the soil to a depth of at least 12 inches (305 mm) below the surface of the ground in the area to be occupied by the building. Wood forms which have been used in placing concrete, if within the ground or between foundation sills and the ground, shall be removed before a building is occupied or used for any purpose. Before completion, loose or casual wood shall be re- moved from direct contact with the ground under the building. 3304.1.1 Slope limits. Slopes for permanent fill shall not be steeper than one unit vertical in two units horizontal (50-per- cent slope). Cut slopes for permanent excavations shall not be steeper than one unit vertical in two units horizontal (50-per- cent slope). Deviation from the foregoing limitations for cut slopes shall be permitted only upon the presentation of a soil investigation report acceptable to the building official. 3304.1.2 Surcharge. No fill or other surcharge loads shall be placed adjacent to any building or structure unless such build- ing or structure is capable of withstanding the additional loads caused by the fill or surcharge. Existing footings or foundations which can be affected by any excavation shall be underpinned adequately or otherwise protected against set- tlement and shall be protected against later movement. 3304.1.3 Footings on adjacent slopes. For footings on ad- jacent slopes, see Chapter 18. 3304.1.4 Fill supporting foundations. Fill to be used to support the foundations of any building or structure shall comply with Section 1803.5. Special inspections of com- pacted fill shall be in accordance with Section 1704.7. SECTION 3305 SANITARY 3305.1 Facilities required. Sanitary facilities shall be pro- vided during construction, remodeling or demolition activities in accordance with the International Plumbing Code. SECTION 3306 PROTECTION OF PEDESTRIANS 3306.1 Protection required. Pedestrians shall be protected during construction, remodeling and demolition activities as required by this chapter and Table 3306.1. Signs shall be pro- vided to direct pedestrian traffic. 563 SAFEGUARDS DURING CONSTRUCTION TABLE 3306.1 PROTECTION OF PEDESTRIANS HEIGHT OF CONSTRUCTION DISTANCE FROM CONSTRUCTION TO LOT LINE TYPE OF PROTECTION REQUIRED Less than 5 feet 8 feet or less Construction railings 5 feet or more None Less than 5 feet Barrier and covered walkway 5 feet or more, but not more than one-fourth the height of construction More than 8 feet Barrier and covered walkway 5 feet or more, but between one-fourth and one-half the hei ht of construction Barrier 5 feet or more, but exceeding one-half the height of construction None For SI: I foot = 304.8 mm. 3306.2 Walkways. A walkway shall be provided for pedestrian travel in front of every construction and demolition site unless the authority having jurisdiction authorizes the sidewalk to be fenced or closed. Walkways shall be of sufficient width to ac- commodate the pedestrian traffic, but in no case shall they be less than 4 feet (1219 mm) in width. Walkways shall be pro- vided with a durable walking surface. Walkways shall be ac- cessible in accordance with Chapter 11 and shall be designed to support all imposed loads and in no case shall the design live load be less than 150 pounds per square foot (psf) (7.2 kN/m'-). 3306.3 Directional barricades. Pedestrian traffic shall be pro- tected by a directional barricade where the walkway extends into the street. The directional barricade shall be of sufficient size and construction to direct vehicular traffic away from the pedestrian path. 3306.4 Construction railings. Construction railings shall be at least 42 inches (1067 mm) in height and shall be sufficient to direct pedestrians around construction areas. 3306.5 Barriers. Barriers shall be a minimum of 8 feet (2438 mm) in height and shall be placed on the side of the walkway nearest the construction. Barriers shall extend the entire length of the construction site. Openings in such barriers shall be pro- tected by doors which are normally kept closed. 3306.6 Barrier design. Barriers shall be designed to resist loads required in Chapter 16 unless constructed as follows: 1. Barriers shall be provided with 2-inch by 4-inch (51 mm by 102 mm) top and bottom plates. 2. The barrier material shall be a minimum of 3/4-inch (19.1 mm) boards or '/4-inch (6.4 mm) wood structural use panels. 3. Wood structural use panels shall be bonded with an adhe- sive identical to that for exterior wood structural use pan- els. 4. Wood structural use panels '14 inch (6.4 mm) or 5/16 inch (23.8 mm) in thickness shall have studs spaced not more than 2 feet (610 mm) on center (o.c.). 5. Wood structural use panels 3/8 inch (9.5 mm) or'/2 inch (12.7 mm) in thickness shall have studs spaced not more than 4 feet (1219 mm) o.c., provided a 2-inch by 4-inch (51 mm by 102 mm) stiffener is placed horizontally at 564 midheight where the stud spacing exceeds 2 feet (610 mm) o.c. 6. Wood structural use panels 5/s inch (15.9 mm) or thicker shall not span over 8 feet (2438 mm). 3306.7 Covered walkways. Covered walkways shall have a minimum clear height of 8 feet (2438 mm) as measured from the floor surface to the canopy overhead. Adequate lighting shall be provided at all times. Covered walkways shall be de- signed to support all imposed loads. In no case shall the design live load be less than 150 psf (7.2 kN/m2) for the entire struc- ture. Exception: Roofs and supporting structures of covered walkways for new, light-frame construction not exceeding two stories in height are permitted to be designed for a live load of 75 psf (3.6kN/m2) or the loads imposed on them, whichever is greater. In lieu of such designs, the roof and supporting structure of a covered walkway are permitted to be constructed as follows: L Footings shall be continuous 2-inch by 6-inch (51 mm by 152 mm) members. 2. Posts not less than 4 inches by 6 inches (102 mm by 152 mm) shall be provided on both sides of the roof and spaced not more than 12 feet (3658 mm) o.c. 3. Stringers not less than 4 inches by 12 inches (102 mm by 305 mm) shall be placed on edge upon the posts. 4. Joists resting on the stringers shall be at least 2 inches by 8 inches (51 mm by 203 mm) and shall be spaced not more than 2 feet (610 mm) o.c. 5. The deck shall be planks at least 2 inches (51 mm) thick or wood structural panels with an exterior expo- sure durability classification at least 23/32 inch (18.3 mm) thick nailed to the joists. 6. Each post shall be knee braced to joists and stringers by 2-inch by 4-inch (51 mm by 102 mm) minimum members 4 feet (1219 mm) long. 7. A 2-inch by 4-inch (51 tnm by 102 mm) minimum curb shall be set on edge along the outside edge of the deck. 3306.8 Repair, maintenance and removal. Pedestrian protec- tion required by this chapter shall be maintained in place and 2003 INTERNATIONAL BUILDING CODED 1k i SAFEGUARDS DURING CONSTRUCTION kept in good order for the entire length of time pedestrians may be endangered. The owner or the owner's agent, upon the com- pletion of the construction activity, shall immediately remove walkways, debris and other obstructions and leave such public property in as good a condition as it was before such work was commenced. 3306.9 Adjacent to excavations. Every excavation on a site lo- cated 5 feet (1524 mm) or less from the street lot line shall be enclosed with a barrier not less than 6 feet (1829 mm) high. Where located more than 5 feet (1524 mm) from the street lot line, a barrier shall be erected when required by the building of- ficial. Barriers shall be of adequate strength to resist wind pres- sure as specified in Chapter 16. SECTION 3307 PROTECTION OF ADJOINING PROPERTY 3307.1 Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, skylights and roofs. Provisions shall be made to control water runoff and ero- sion during construction or demolition activities. The person making or causing an excavation to be made shall provide writ- ten notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining build- ings should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. SECTION 3308 TEMPORARY USE OF STREETS, ALLEYS AND PUBLIC PROPERTY 3308.1 Storage and handling of materials. The temporary use of streets or public property for the storage or handling of materials or of equipment required for construction or demoli- tion, and the protection provided to the public shall comply with the provisions of the authority having jurisdiction and this chapter. 3308.1.1 Obstructions. Construction materials and equip- ment shall not be placed or stored so as to obstruct access to fire hydrants, standpipes, fire or police alarm boxes, catch basins or manholes, nor shall such material or equipment be located within 20 feet (6096 mm) of a street intersection, or placed so as to obstruct normal observations of traffic sig- nals or to hinder the use of public transit loading platforms. 3308.2 Utility fixtures. Building materials, fences, sheds or any obstruction of any kind shall not be placed so as to obstruct free approach to any fire hydrant, fire department connection, utility pole, manhole, fire alarm box or catch basin, or so as to interfere with the passage of water in the gutter. Protection against damage shall be provided to such utility fixtures during the progress of the work, but sight of them shall not be ob- structed. 2003 INTERNATIONAL BUILDING CODED SECTION 3309 FIRE EXTINGUISHERS [F] 3309.1 Where required. All structures under construction, alteration or demolition shall be provided with not less than one approved portable fire extinguisher in accordance with Section 906 and sized for not less than ordinary hazard as follows: At each stairway on all floor levels where combustible materials have accumulated. 2. In every storage and construction shed. 3. Additional portable fire extinguishers shall be provided where special hazards exist, such as the storage and use of flammable and combustible liquids. 3309.2 Fire hazards. The provisions of this code and the Inter- national Fire Code shall be strictly observed to safeguard against all fire hazards attendant upon construction operations. SECTION 3310 EXITS 3310.1 Stairways required. Where a building has been con- structed to a height greater than 50 feet (15 240 mm) or four sto- ries, or where an existing building exceeding 50 feet (15 240 mm) in height is altered, at least one temporary lighted stairway shall be provided unless one or more of the permanent stair- ways are erected as the construction progresses. 3310.2 Maintenance of exits. Required means of egress shall be maintained at all times during construction, demolition, re- modeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. [F] SECTION 3311 STANDPIPES 3311.1 Where required. Buildings four stories or more in height shall be provided with not less than one standpipe for use during construction. Such standpipes shall be installed where the progress of construction is not more than 40 feet (12 192 mm) in height above the lowest level of fire department access. Such standpipe shall be provided with fire department hose connections at accessible locations adjacent to usable stairs. Such standpipes shall be extended as construction progresses to within one floor of the highest point of construction having secured decking or flooring. 3311.2 Buildings being demolished. Where a building is be- ing demolished and a standpipe exists within such a building, such standpipe shall be maintained in an operable condition so as to be available for use by the fire department. Such standpipe shall be demolished with the building but shall not be demol- ished more than one floor below the floor being demolished. 3311.3 Detailed requirements. Standpipes shall be installed in accordance with the provisions of Chapter 9. Exception: Standpipes shall be either temporary or perma- nent in nature, and with or without a water supply, provided that such standpipes conform to the requirements of Section 905 as to capacity, outlets and materials. SAFEGUARDS DURING CONSTRUCTION 3311.4 Water supply. Water supply for fire protection, either temporary or permanent, shall be made available as soon as combustible material accumulates. [F] SECTION 3312 AUTOMATIC SPRINKLER SYSTEM 3312.1 Completion before occupancy. In buildings where an automatic sprinkler system is required by this code, it shall be unlawful to occupy any portion of a building or structure until the automatic sprinkler system installation has been tested and approved, except as provided in Section 110.3. 3312.2 Operation of valves. Operation of sprinkler control valves shall be permitted only by properly authorized person- nel and shall be accompanied by notification of duly desig- nated parties. When the sprinkler protection is being regularly turned off and on to facilitate connection of newly completed segments, the sprinkler control valves shall be checked at the end of each work period to ascertain that protection is in ser- vice. 566 2003 INTERNATIONAL BUILDING CODE@