Loading...
HomeMy WebLinkAboutRE four seasons 7 4 08 PDF - Adobe Acrobat Standard IPM.Note RE: four seasons 7 4 08.PDF - Adobe Acrobat Standard RE: Mike McGee SMTP MMcGee@vailgov.com Mike McGee SMTP MMcGee@vailgov.com David Rhoades; JR Mondragon; JR Rulapaugh; Leonard Sandoval; Mark Miller; Mike Vaughan; Tom Kassmel John King; Martin Haeberle four seasons 7 4 08.PDF - Adobe Acrobat Standard Martin, I will make my schedule fit yours anytime today before 4 PM. Mike 376-0738 >>> John King <JKing@safebuilt.com> 07/07/2008 10:58 AM >>> Mike and Martin, I will make myself available at whatever time works for you. I'm 20 minutes away. Martin, this is a perfect example of why I asked you about the permitting of temp uses the other day. Although Charlie told Layton in was not required, perhaps we should revisit the issue. Thanks -----Original Message----- From: Mike McGee [mailto:MMcGee@vailgov.com] Sent: Monday, July 07, 2008 10:53 AM To: John King; Martin Haeberle Cc: David Rhoades; JR Mondragon; JR Rulapaugh; Leonard Sandoval; Mike McGee; Mark Miller; Mike Vaughan; Tom Kassmel Subject: RE: four seasons 7 4 08.PDF - Adobe Acrobat Standard To All, I had a discussion with Chief Miller this morning ref the Four Seasons. I would like to request a walk-through with Martin and perhaps John King to see first hand, the conditions as they exists now. The IFC requires temp standpipes, an operational plan, and an exiting plan. Normal workplace standards would require adequate lighting. and ventilation. The Fire Dept's biggest concern is we not have a clear and consistent means of access or egress. Layton continues to frame and pour faster than they can draft updated plans. We have no means to fight a fire in the lower levels, despite the presence of flexible natural gas lines strung across screw jacks with bailing wire, active temp electrical services, storage rooms and cages with a variety of materials, and the offices in the basement. Rescue of construction workers will be a challenge due to what seems to be an ever changing exit path, most of which are not marked. Stairs that were there last week are gone now. New stairs are there but not labeled. Escape routes were to be marked in red lines on the floor. What lines exists are often covered with materials, fade to nothing, stop mid way, or are not there at all. Layton has an excuse for each element. This weekends incident just tends to reinforce my observation that they will do whatever they think they can get away with. When they get caught, they apologize and repeat the same mistake. Makes me think their "mistakes" are not accidents. I am open today and Tues. I will be out of the state for two weeks starting Thurs AM. I am trying to hold Wed afternoon open for last minute clean up. If there is some time you can spend to do a walk through thoday or Tues, Please let me know. Thanks, Mike >>> John King <JKing@safebuilt.com> 07/07/2008 10:18 AM >>> Martin, per discussions with Mike, we have only been performing inspections on the upper level of the four seasons project since the Red Tag was issued. Please let me know if there is anything I can do to help. Thanks, John -----Original Message----- From: Martin Haeberle [mailto:MHaeberle@vailgov.com] Sent: Monday, July 07, 2008 10:15 AM To: John King Cc: Leonard Sandoval; Mike McGee; Mark Miller; Tom Kassmel Subject: Re: four seasons 7 4 08.PDF - Adobe Acrobat Standard John, Please give me an update on the status of inspections for this project so that I can adequately support and address Mikes concerns Thanks Martin Martin A. Haeberle, C.B.O. Chief Building Official Town of Vail 75 South Frontage Road Vail, Colorado 81658 970.479.2142 (o) 970.479.2452 (f) 970.376.3672 (c) John King SMTP JKing@safebuilt.com JKing@safebuilt.com John King David Rhoades SMTP DRhoades@vailgov.com DRhoades@vailgov.com David Rhoades JR Mondragon SMTP JMondragon@vailgov.com JMondragon@vailgov.com JR Mondragon JR Rulapaugh SMTP JRulapaugh@vailgov.com JRulapaugh@vailgov.com JR Rulapaugh Leonard Sandoval SMTP LSandoval@vailgov.com LSandoval@vailgov.com Leonard Sandoval Martin Haeberle SMTP MHaeberle@vailgov.com MHaeberle@vailgov.com Martin Haeberle Mark Miller SMTP MMiller@vailgov.com MMiller@vailgov.com Mark Miller Mike Vaughan SMTP MVaughan@vailgov.com MVaughan@vailgov.com Mike Vaughan Tom Kassmel SMTP TKassmel@vailgov.com TKassmel@vailgov.com Tom Kassmel