Loading...
HomeMy WebLinkAboutB08-0010 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES : ��r�vnu, • . Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 NEW MULTI-FAM BUILD PERM Permit #: B08-0010 Project #: PRJ06-0474 Job Address: 612 W LIONSHEAD CR VAIL Status. . : ISSUED Location......: LANDMARK CONDOS Applied . . : 01/24/2008 Parcel No....: 210106307001 Issued. .. : 05/10/2010 Expires. ..: 09/O6/2010 OWNER MARY SUILIVAN JOSEPHS TRUST 01/24/2008 MICHELE H. 1308 E CAMPBELL ST ARLINGTON HEIGHTS IL 60004 APPLICANT ALTER DESIGN BUILDERS LLC 01/24/2008 Phone:970-479-5330(LOCAL PHON 5500 W. HOWARD ST. SKOKIE IL 60077 License:352-A CONTRACTOR ALTER DESIGN BUILDERS LLC 01/24/2008 Phone: 970-479-5330(LOCAL PHON 5500 W. HOWARD ST. SKOKIE IL 60077 License:352-A Description: LANDMARK-CONSTRUCT NEW FACADE ON EXISTING 7 STORY STRUCTURE. CONSTRUCT NEW ELEVATOR/CLOCK TOWER AND NEW/EXISTING TOWN HOME BUILDING; 17 NEW CONCOMINIUMS, NEW LOBBY STRUCTURE;NEW BELOW GROUND GROUND PARKING STRUCTURE; CONSTRUCT NEW WEST BALCONY ENCLOSURE AND SENENTH FLOOR MEZZANINE EXPANSION FOR THE LANDMARK CONDOS RENOVATION AND ADDITION Occupancy Type Factor Sq Feet Valuation Totals... 44,588$25,525,000.00' Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $25,525,000.00 Type Construction: Total Sq Ft Added: 44588 •,•••,••,,•,,••••••••••,,••,,••,•••,_•_•••••••,,,,•,•••••,••'•••••,•••••,•••,•••, FEE SUMMARY wxx�r,txxrrw�+.�w�xxvwiix:xrx�,ew+x�xw�ww�w,ew,rea,r�w,e�e,et+�r��rw,rw�ify::,rr�w����vrer Building Permit Fee------> $95,125.00 Will Call------------------------> $4.00 Total Calculated Fees-----------> 711,848.25 Plan Check--------------------> $61,831.25 Use Tax Fee--------------------> 510,300.00 Additional Fees----------------------> 07,947.81) Add'I Plan Check Hours-> $0.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES---------> 203,900.44 Investigation-----------------> $0.00 Recreation Fee-------------> $44,588.00 Payments-------------------------> 203,900.44 Total Calculated Fees------> 711,848.25 BALANCE DUE----------------------> 50.00 +r�w:,.,rww,.,.•x,r,r�y,r.r�f,rxrrrr�rir�rx:::::�x�w��+.�:::.xwwww..wwwwwxxwwsn.,eeixixs.wwxxrww�xxxxxixxee�rer����e��rrvrr�xr�rr�xwrwi:3���r.�xwxx:..v.::w.�wx:w.�xxxw:,ex:xwwrxexexxy�w�s.�:�xx.x�w DECLARATIONS I hereby acknowledge that i have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPEC N SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 P . VS�. L�. C� Si n ture of Owner or Contrac or Date new_construction_perm it_041908 Print Name new_constructio n_perm it_041908 Rwf�fffw�f#if�Rl�xfwwwwYfAkRlRYw1*wt*wrta***fttflff*ww/#/ff�f4ltfYY�lftY�wwwM*ftfkRf#ffffttf��ytf�Y4�RRfw}xRR��Wf*4*kAMfRktlttklYw�Rt�4t�flRRl4��lfyx�YYRw*xtRxtt�w#titffffRiRfKft�f*• APPROVALS Permit#: B08-0010 as of 05-10-2010 Status: ISSUED wr��:�xweeizwxvnrwxx:�xrxwrr,rw�wv.��t��::rxvrx�xrr�r���wxxwiirrrtrxww�����xrw�+.w�i:�::x++�t��r�wwi:��wr»:w,rwx,r��:w�:::w�w,r:�����::wx+wwrx�,ew+v.wr+�:�:xr�ix++w�,r,r��rt���rx�tirtrxx+,r������ Item: 05100 BUILDING DEPARTMENT 02/26/2008 jplano Action: CR CORRECTION LETTER SENT 04l11/2008 jplano Action: CR 2ND CORRECTION LETTER SENT 05/28/2008 jplano Action: CR 3RD CORRECTION LETTER SENT 06/02/2008 jplano Action: PA MICRO-PiLE INSTALLATION ONLY, ISSUES STILL PENDING FOR THE FULL PERMIT 06/25/2008 NSC Action: AP approved full set of drawings IR#6566 09/22/2008jplano Action: AP Rev1, Approved, loft finishes in the tower. Date stamped by SAFEbuilt 8/22/08, 3 hour plan review due=$180.00 10/01/2008 jplano Action: CR REV2/IR8775 - CORRECTION LETTER SENT REGARDING ADDITIONAL SQUARE FOOTAGE SUBMITTAL, 3488 ADDITIONAL SQUARE FEET 11/10/2008 jplano Action: CR REV2/IR8775 -2ND CORRECTION LETTER SENT REGARDING ADDITIONAL SQUARE FOOTAGE SUBMITTAL, 3488 ADDITIONAL SQUARE FEET, PROBLEM WITH EXITING FROM PARKING STRUCTURE 11/12/2008 jplano Action: AP REV2/IR8775- APPROVED, 3488 ADDITIONAL SQUARE FEET, PROBLEM WITH EXITING FROM PARKING STRUCTURE WAS REMOVED FROM THE PLANS, 30 HOURS DUE=$1800 02/13/2009 jplano Action: CR Rev3/IR9710- Correction letter sent on revisions to shoring 03/30/2009 jplano Action: AP Rev3/IR9710- Approved-Corrections addressed, Please have appropriate TOV departments approve accordingly prior to issuance. $1380.00 due 04/21/2009 jplano Action: AP Rev5/IR9858, Approved new set of drawings date stamped by SB 4/21/09, 15 hours of plan review due=$900.00 04/21/2009 jplano Action: COND Rev4 returned to TOV for inhouse review OS/11/2009 E Pendley Action: AP IR# 10276 Public Access Car Ramp Revisions Rev 6 Approved 1.5 hours @ $60 =$90.00 10/26/2009 C Davis Action: AP IR# 10526 Rev 7 Landmark Boiler Flue/Shaft Wall Clearance Modification 3 hours @ $60.00= $180.00 No added sq ftage no added valuation 11/06/2009 EPendley Action: AP IR#10548 REV 8 Additional Fire Stopping Review Approved Additional Fee $120.00 JEaton 11./16/2009 EPendley Action: AP �R# 10576 Rev 9 (Relates M08-0145) Duct Changes Approved Units 51, 52, 53; 54, 55, 56, 57 No Added Valuation 2 Hrs PR @$60 per Hr. $120.00 11/18/2009 E Pendley Action: DN This submittal is denied due to plans not matching transmittal sheet. SAFEbuilt did not receive FP Plans. Did receive changes to mechanical system. (Revised fire sprinkler plans received, routed to Safe Built and Fire. No additional new_co nstruction_perm it_041908 valuation.)This note was entered under L/H/N. JEaton 11.18.09 12/18/2009 E Pendley Action: DN Rev 10 IR# 10615 Corrected Submittal for Mechanical Room Revision Corrections Required Comment Letter Sent via Email to HOlsen on 12.18.09 J Eaton 01/11/2010 NSC Action: DN Rev11 IR#10616 Correction letter sent on 1/11/10 for Spray Applied Foam insulation in Ext wall 01/22/2010 Ependley Action: AP Revised mechanical plans received. Four copies routed to SafeBuilt. No additional valuation. Rev 12 IR 10699 Plan Review 2 hrs a�$60 =$120 Jae 01/22/2010 EPendley Action: AP Rev 10 IR# 10615 Approved "Re-Issue to 3rd Revision to Permit"dated 01.11.2010 Sheets A-001A, TOV-3 and A-003 PR 4hrs @$60= $240.00 Jae 02/11/2010 MDenney Action: AP Rev 14 IR# 10771 , Modifications to Emergency Power Distribution and Elevator Control to Accommodate the Fire Marshal's Request Approved 2 hrs PR @$60 per hr= $120.00 Jae 02.11.10 02/16/2010 DGoodman Action: AP Rev 13 IR# 10767 Approved Sign Submittal No Added Valuation 2 hrs pr @$60 per hr= $120.00 JEaton 02.16.10 02/24/2010 E Pendley Action: DN Revised details regarding insulation location received. No additional valuation. One copy routed to Martin Haeberle, three copies routed to SafeBuilt. See Entry for Rev#11 Spray Applied Product Proposed Not Allowed Per ER Report 0146 and 2003 IBC Section 2603.5 Jae 02.24.2010 Item: 05400 PLANNING DEPARTMENT 05/28/2008 bgibson Action: AP 08/22/2008 bgibson Action: NA DEFERRED SUBMITTAL FOR INTERIOR FINISHES UNITS 701-705 09/25/2008 bgibson Action: AP 8/15/08 corrections 08/13/2009 bgibson Action: AP revisions to date 10%02/2009 bgibson Action: AP decorative copper chimney shrouds approved by planning 02/10/2010 bgibson Action: AP Sign package approved by Planning. plan routed to Safebuilt. Item: 05600 FIRE DEPARTMENT 02/12/2008 McGee Action: DN Vail Fire& Emergency Services 42 West Meadow Drive Vail, Colorado 81657 970-479-2250 Plan Review 608-0010 Landmark Town Homes January 18, 2008 We have reviewed the plans dated 01/18/08 under permit 608-0010. The comments are as follows: new_construction_perm it_041908 1. Fire protection and fire alarm plans were not attached to the set distributed to the Fire Dept. Plans need to be submitted before any additional review. 2. No Life Safety Report was submitted. 3. No specifications were submitted. 4. Fire staging in the Lionshead Mall is not acceptable. 5. No preliminary meetings were held in any significant level of detail with the FPE and Fire Dept prior to submittal. Therefore, no understanding exists as to the approach to fire protection, evacuation (plan require.d per IFC Chapter 4), emergency power, smoke management or other aspects. 6. Code sheet indicates the building is 84 ft, eight levels. From Lionshead Mall, this building is a high-rise. 7. Type construction is suspect as to Type III. See SafebuilYs analysis and review. 8. Fire flow has not been substantiated. 9. No fire dept access is available from the south entrance. Turning radius is too small. 10. Significant elements may impact the Landmark Tower, egress, elevator, fire alarm control panel location, etc. 11. Where is the fire control valve room? 12. Plans should indicate North Day Lot development and any"common elements" (sidewalks, egress, drainage, utilities)that are intended to be shared. 13. Snow removal on north side should be shown on plans or in narrative form. 14. Fire Dept strongly suggests a joint meeting with the architectural design team and the FPE before re-submittal. Review suspended pending additional information. Michael McGee Deputy Chief Vail Fire Department 02/19/2008 mcgee Action: CR Vail Fire Dept received a copy of the FA and FP plans on 2/19/08, dated 02/14/08. The plan review comments are as follows: The existing FDC's may not be accessible. Plans call for connecting to existing. Interconnecting the new standpipes will cause excessive delay in filling from a fire truck. Separate FDC's are required. The plans call for re-using the existing FACP. The capacity of the existing fire alarm control panel may not handle both buildings. Fire department hose connections are required in the new garage, both levels. new_construction_perm it_041908 The review of the design of the interstitial space is held in abeyance until details in building construction type are resolved with Safebuilt. 06/06/2008 McGee Action: AP Approved as noted: 1. Operational Plan is approved as submitted 06/05/08. 2. Deferred submittals are subject to review. 06/13/2008 McGee Action: AP Release of full building permit approved on condition as indicated in the attached email: Mike, Per our telephone conversation, Schirmer Engineering is under contract with the Owner to prepare the pressurization performance specification and the modeling analyses as you and he discussed earlier this morning. We will be resubmitting the drawings today, with the performance spec to follow early next week. The subsequent modeling will inform the design team of the mechanical changes necessary, which will follow as deferred submittals. From our conversation, I understand this process meets your approval and that you will lift the fire departmenYs hold on issuing the building permit. The permit number is 608-0010. Thank you again for all of your assistance throughout this process. Regards, Ed Curle LEED AP Y Architecture and Planning A. Epstein and Sons International, Inc. 600 W. Fulton Street Chicago, IL 60661-1259 Tele: 312.454.9100 Direct: 312.429.8210 Fax: 312.559.1217 06/26/2008 mcgee Action: AP Xcel Energy conducted assessment of existing gas meter set at 10:00 AM, 06/26/08, and determined existing meter locations are new construction_permit 041908 adequate for expressed intent. 04/17/2009 mcgee Action: AP 701 -705 Finish Furnish Proof of Asbestos Clearence. Provide seperat fire alarm and fire sprinkler permits to reflect changes.. Scope letter must be stamped by FPE of Record. 04/17/2009 mcgee Action: AP AESI P.N. 2721000 08/14/08 1. Fire Department records do not show agreement to delete pressurization from elevator/stair. Lowest level of fire department access is greater than 75 ft to highest occupied floor. Sheet M 100 shows supply fans for stairway pressurization. 2. Electrical rooms that open into elevator lobby pose a concern, especially if pressurization is eliminated. 3. Applicant is advised ship ladder specifications are posted on TOV website. All ships ladders provided fire department access shall meet VFES specifications. Sheet A 705 04/23/2009 mcgee Action: CR Rev#2 to Permit Set Received 03 25 09 Sheet Comments TOV-1 Plans show setback variance from face of Concert Hall Bldg. Exterior face of Concert Hall is combustible. TOV-5 Plans show the electrical room opens to the elevator lobb . In the event of electrical fault in the Y electrical room, the entire elevator may become unusable for evacuation of non-ambulatory persons on upper floors. See Sheet A 106. Original plans called for pressurization of elevator lobbies. No equivalency has been demonstrated. A 003 Landscaping shown would obstruct fire department connections. A 705 See TOV Fire Dept standards for ships ladders. M 100 Plans show SF 5 and 6 are to pressurize stairwell. Plan notes indicate CO detectors for garage. Plans do not indicate location or operational sequence of CO detectors for guest rooms. M 102 SF 3 requires smoke detector. M 201 Use of laundry and electrical rooms for employee break room, office or storage is prohibited. 08/11/2009 McGee Action: AP Revision approved pet correspondence wit Architect. 08/21/2009 McGee Action: AP Car Ramp new_co nstruction_perm it_041908 Revise fire sprinkler plans as needed. 11/09/2009 McGee Action: AP Fire stopping plan dated Oct 26, 2009. Special inspection by others. 11/23/2009 mvaughan Action: AP revision 3 asbuilts of fire protection drawings dated11/13/09 02/17/2010 mvaughan Action: AP signage package approved. 02/25/2010 McGee Action: CR Revision 13 Mech G111 /Storage G106. Submit revisions to fire alarm and fire sprinkler plans. Scope letter is acceptable. 02/25/2010 McGee Action: AP Revision 11 Electrical circuit to east elevator for em power. 03/29/2010 McGee Action: AP SAFM insulation 576 and 666 Item: 05500 PUBLIC WORKS 04/02/2008 csalli Action: CR correction letter sent with Safebuilt's letter in Feb 2008 04/10/2008 csalli Action: CR corrections letter sent to safebuilt to be coordinated with other dept comments 4/10/08 06/02/2008 csalli Action: COND Full building permit approved with the following conditions: 1. The Construction License Agreement will need to be executed prior to installation of any shoring in public right of way. 2. A revocable permit for private improvements in public right of way shall be executed prior to any T.C.O. or C.O. 3. A Heat Maintenance Agreement will need to be executed for the snowmelted sidewalk along W Lionshead Cir prior to any T.C.O. or C.O. 4. The existing street light in confilct with the proposed storm sewer identified as profile 1 shall be replaced with a new TOV Village Street Light and installed in a location to be approved by the Town of Vail. Item: 05101 BUILDING DEPT REVISION 10/02/2009 MARTIN Action: AP Approved submittal of chimmney caps from Arapahoe roofing dated 9/29/2009 04/27/2010 Martin Action: AP Revision to insulation approved •i4Y�y'tikiFiFYYYif4�k�t#1r1`f:lf1r444f*i!V RlrttiHrxf4ffffftlrrt1rY44YiRYy'fYYYy'frYe�4�4�k4fYf#iFYeYtyV4it1Mf41r1M44i!#frkf`ff##�f`tRiff`VffiRiRYffttfflfrttfYfitikffRYl�kiF�k�FiFf*Y#Y(f#iii�fi44#�k*lfifrffftl4lfRf444f�Rt1f#44f4lf See the Conditions section of this Document for any that may apply. new construction_permit_041908 f�YZtW*YtWt�lf!lffffYtfYt*�wwwYYfk#/k/kf�*xtf�lZA1lMkfYY�ffftwwMW�MMi/4w*4*�l�f�tR#R�f#f4Rittff�lllxffkflYkwf*WVr4wrttw*�tf44�ff4x�f��iflkYtt�tw***�Y�wff*f##�ft4��iR�ktffRf��kRfffffff CONDITIONS OF APPROVAL Permit#: 608-0010 as of 05-10-2010 Status: ISSUED •ie:�,erwxr►xws.xw��::ttxr:iirwxrewxwwv.tr�ext�iN.rrxxx:�xfr:r�t+**xw�xex,�nen,rv:w�,r,rwwr����x�t+:��►rx+.ttixRRxt�x+xr+xwewwwwwrx��:t���:��►srx::i,e��w:x+wxxewwvrww�w���ix��:e�xir::��+����r:» Cond: CON0010058 FIRE DEPARTMENT: Approved as noted: 1. Operational Plan is approved as submitted 06/05/08. 2. Deferred submittals are subject to review. PUBLIC WORKS: Full building permit approved with the following conditions: 1. The Construction License Agreement will need to be executed prior to installation of any shoring in public right of way. 2. A revocable permit for private improvements in public right of way shall be executed prior to any T.C.O. or C.O. 3. A Heat Maintenance Agreement will need to be executed for the snowmelted sidewalk along W Lionshead Cir prior to any T.C.O. or C.O. 4. The existing street light in confilct with the proposed storm sewer identified as profile 1 shall be replaced with a new TOV Village Street Light and installed in a location to be approved by the Town of Vail. BUILDING DEPARTMENT: The release of this portion of the permit does not constitute the approval of the full building permit. The remaining issues on the third correction letter, dated 4/11/08, will have to be addressed completely for issuance of the full building permit. The owner and contractor are obligated to return the site to the original condition if a full building permit is not issued. ' Cond: CON0010123 SEE APPROVAL LETTER DATED JUNE 23, 2008 FROM SAFEBUILT FOR APPROVAL CONDITIONS: 1. PROVIDE WET-STAMPED LETTER FROM STRUCTURAL ENGINEER TO VERIFY EXISTING CONCRETE IS ADEQUATE AND PROVIDE DETAILS FOR ANY REPAIRS DEEMED NECESSARY. 2. PROVIDE COMPLETE FIRE-STOPPING SUBMITTAL. ONE COMPREHENSIVE SUBMITTAL FROM THE ARCHITECT OF RECORD IS REQUIRED. 3. PROVIDE PRESSURIZATION OF STAIR AND ELEVATOR CORES TO SATISFACTION OF VAIL FIRE DEPARTMENT. 4. MAIN ENTRY DOORS IN NEW LOBBY, #G100A ND G100B ARE SHOWN AS MEANS OF EGRESS FROM OTHER AREAS IN THE BUILDING THAT WILL BE OCCUPIED WHEN LOBBY IS CLOSED. THESE DOORS ARE TO REMAIN UNLOCKED FROM THE EGRESS SIDE AT ALL TIMES. Cond: CON0010635 701 -705 Finish Furnish Proof of Asbestos Clearence. new construction_permit 041908 Provide seperat fire alarm and fire sprinkler permits to reflect changes.. Scope letter must be stamped by FPE of Record. Cond: CON0010636 AESI P.N. 2721000 08l14/08 1. Fire Department records do not show agreement to delete pressurization from elevator/stair. Lowest level of fire department access is greater than 75 ft to highest occupied floor:`Sheet M 100 shows supply fans for stairway pressurization. 2. Electrical rooms that open into elevator lobby pose a concern, especially if pressurization is eliminated. 3. Applicant is advised ship ladder specifications are posted on TOV website. All ships ladders provided fire department access shall meet VFES specifications. Sheet A 705 new_co n st ru ct io n_pe rm it_041908 r i ��-� 1 � £i��cg`�g�';�T���,"'� � '� � r _ i 71 a�' : , R f . � �2'3.,�,'d ^ t S �7 - t. � �,��4�+R� ;����,f�� ., ����� � (����� �.a �� i.. � f .,.�' ,�"•_� ; �� �"� ';�� � -;r��`����e �'� :� ��,' m� _. j�}' ,� '�3 Scruth Fr�ntag�. .�_ :�F.� � ' .� � 'P? `� .�'��. . •� � � �: �►•,�ti:�,;. �`: ,r,�; i� 4 ` s. '�� ��'j t . � � � .� . •{+ �� `,��, �,"�,��X ,. `� ��"� _�'� "�+�`S�M��k . ,��.=� , L �`{ M r ,,� . ,_ �.� e` � i�'M1' .A . l tl ,�° / TRANSMITTAL FORM Revision Submittals: 1. "Field SeY'of approved plans MUST accompany revisions. 2. No further inspedions will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum),and are due upon issuance. Permit#(s)information applies to: Attention: ( )Revisions B08-0010 Martin Haeberle ( ) Response to Correction Letter ^,attached copy of correction letter ( )Deferred Submittal (�)Other Project Street Address: 610 W. Lionshead Circle Description/List of Changes: (Number) (Street) (Suite#) 4 stamped copies each of A-108 and A-109 Building/Complex Name: The Landmark Indicating the SAFM insulation at units 57B and 666. Contact Information: Company: Alter Design Builders Company Address: 5500 W. Howard St. ��,: Skokie State: �� Zip: 60077 Contact Name: Howard Olsen Contact Phone: 970 389-2881 E-Mail holsen�altergroup.com Revised ADDITIONAL Valuations(Labor 8 Materials) (DO NOT include original valuation) Building: $ (use additional sheet if necessary) Plumbing: � Date Received: Electrical: $ Mechanical: $ � � � a � Total: $ 0 D � MAR 2 6 ZOyp TOWN OF VAIL � � � NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES . . �n�ro�vn� . Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f.970.479.2452, inpsections 970.479.2149 NEW MULTI-FAM BUILD PERM Permit #: B08-0010 Project #: PRJ06-0474 Job Address: 612 W LIONSHEAD CR VAIL Status. . : ISSUED Location......: LANDMARK CONDOS Applied . . : 01/24/2008 Parcel No....: 210106307001 Issued. .. : -�2/4+'�4949- �,3 � �� Expires. ..: 11/25/2009 OWNER MARY SULLIVAN JOSEPHS TRUST 01/24/2008 MICHELE H. 1308 E CAMPBELL ST ARLINGTON HEIGHTS IL 60004 APPLICANT ALTER DESIGN BUILDERS LLC 01/24/2008 Phone:970-479-5330(LOCAL PHON 5500 W. HOWARD ST. SKOKIE I L 60077 License:352-A ; CONTRACTOR ALTER DESIGN BUILDERS LLC 01/24/2008 Phone:970-479-5330(LOCAL PHON 5500 W. HOWARD ST. SKOKIE IL 60077 License:352-A Description: LANDMARK-CONSTRUCT NEW FACADE ON EXISTING 7 STORY STRUCTURE.CONSTRUCT NEW ELEVATOR/CLOCK TOWER AND NEW/EXISTING TOWN HOME BUILDING; 17 NEW CONCOMINIUMS, NEW LOBBY STRUCTURE;NEW BELOW GROUND GROUND PARKING STRUCTURE; CONSTRUCT NEW WEST BALCONY ENCLOSURE AND SENENTH FLOOR MEZZANINE EXPANSION FOR THE LANDMARK CONDOS RENOVATION AND ADDITION Occupancy Type Factor Sq Feet Valuation Tota ls... 44,588$25,525,000.00' Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $25,525,000.00 Type Construction: Total Sq Ft Added: 44588 .,...,<..............................................,......,,...,.,..,,....,..... FEE SUMMARY ....,,....,,...,................__.,....,.,.....,..,..........,..,,__........,. Building Permit Fee---> $95,125.00 Will Call--------------------> $4.00 Total Calculated Fees------------> 711,848.25 Plan Check----------------> $61,837.25 Use Tax Fee----------> 510,300.00 Additional Fees----------------------> 07,947.81) Add'I Plan Check Hours-> $0.00 Restuarant Plan Review--> $0.00 TOTAL PERMIT FEES------------> 203,900.44 Investigation-------> $0.00 Recreation Fee----------> $44,588.00 Payments--------------------------> 203,900.44 Total Calculated Fees--> 711,848.25 BALANCE DUE----------------------> 50.00 ..,_...,,......................................,.._.......:.......,,..,.,,.........,.,«.«....:..,......,.........,,....,.......,,...........«_...,,,..�,.,,......,.......__,...,,..,,..., DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information as required is correct. 1 agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Tawn applicable thereto. REQUESTS F� INSP N SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00�0 M. 03_ O� Ll� Signature Owner or Contractor Date new_construction�erm it_041908 Print Name � new construction�ermit_041908 if14�4kfi�R/fx44�##RA4*�ff�*#�1R4��f���fRfff��lf����R�fflff4Rtf}��ffllrftlR*frR����N1f�#*R*►4kk��ff*�ili}�}#***41rR�t�***/###*fYt*f*#411fI4*t�RWf*#fYtRR}�ff�ttffk#�f*+4ii#i##YYwRfY�fY APPROVALS Permit#: B08-0010 as of 03-03-2010 Status: ISSUED •#kVrt**f'*f�*#Rtff'RRf'*iHrffftfff/fffHf�4R*fr4ff►Hit►lti�ltt}}*}HRtR4fR►l►4t1R1ftf�HlHwRtRt1'k/11Y►lf�fl�fe4f��f�N�f!►�ftfflfYftfi«//ff'f*1�3f'!f'��f'Rlf�f'RfrRlrf'Y'frflNrff`f/*JRit4tW/*RYr#'k4f YYYYYrf�RYYfYf1 Item: 05100 BUILDING DEPARTMENT 02/26/2008 jplano Action: CR CORRECTION LETTER SENT 04/11/2008 jplano Action: CR 2ND CORRECTION LETTER SENT 05/28/2008 jplano Action: CR 3RD CORRECTION LETTER SENT 06/02/2008 jplano Action: PA MICRO-PILE INSTALLATION ONLY, ISSUES STILL PENDING FOR THE FULL PERMIT 06/25/2008 NSC Action: AP approved full set of drawings IR#6566 09/22/2008 jplano Action: AP Rev1, Approved, loft finishes in the tower. Date stamped by SAFEbuilt 8/22/08, 3 hour plan review due=$180.00 10/01/2008 jplano Action: CR REV2/IR8775- CORRECTION LETTER SENT REGARDING ADDITIONAL SQUARE FOOTAGE SUBMITTAL, 3488 ADDITIONAL SQUARE FEET 11/10/2008 jplano Action: CR REV2/IR8775-2ND CORRECTION LETTER SENT REGARDING ADDITIONAL SQUARE FOOTAGE SUBMITTAL, 3488 ADDITIONAL SQUARE FEET, PROBLEM WITH EXITING FROM PARKING STRUCTURE 11/12/2008 jplano Action: AP REV2/IR8775- APPROVED, 3488 ADDITIONAL SQUARE FEET, PROBLEM WITH EXITING FROM PARKING STRUCTURE WAS REMOVED FROM THE PLANS, 30 HOURS DUE=$1800 02/13/2009 jplano Action: CR Rev3/IR9710- Correction letter sent on revisions to shoring 03/30/2009 jplano Action: AP Rev3/IR9710- Approved-Corrections addressed, Please have appropriate TOV departments approve accordingly prior to issuance. $1380.00 due 04/21/2009 jplano Action: AP Rev5/IR9858, Approved new set of drawings date stamped by SB 4/21/09, 15 hours of plan review due=$900.00 04/21/2009 jplano Action: COND Rev4 returned to TOV for inhouse review 08/11/2009 E Pendley Action: AP IR# 10276 Public Access Car Ramp Revisions Rev 6 Approved 1.5 hours @ $60 =$90.00 10/26/2009 C Davis Action: AP IR# 10526 Rev 7 Landmark Boiler Flue/Shaft Wall Clearance Modification 3 hours @$60.00 = $180.00 No added sq ftage no added valuation 11/06/2009 EPendley Action: AP IR#10548 REV 8 Additional Fire Stopping Review Approved Additional Fee $120.00 JEaton 11/16/2009 EPendley Action: AP IR# 10576 Rev 9 (Relates M08-0145) Duct Changes Approved Units 51, 52, 53, 54, 55, 56, 57 No Added Valuation 2 Hrs PR @ $60 per Hr. $120.00 11/18/2009 E Pendley Action: DN This submittal is denied due to plans not matching transmittal sheet. SAFEbuilt did not receive FP Plans. Did receive changes to mechanical system. (Revised fire sprinkler plans received, routed to Safe Built and Fire. No additional new_construction_permit_041908 valuation.) This note was entered under UH/N. JEaton 11.18.09 12/18/2009 E Pendley Action: DN Rev 10 IR# 10615 Corrected Submittal for Mechanical Room Revision Corrections Required Comment Letter Sent via Email to HOlsen on 12.18.09 J Eaton 01/11/2010 NSC Action: DN Rev11 IR#10616 Correction letter sent on 1/11/10 for Spray Applied Foam insulation in Ext wall 01/22/2010 Ependley Action: AP Revised mechanical plans received. Four copies routed to SafeBuilt. No additional valuation. Rev 12 IR 10699 Plan Review 2 hrs @$60 =$120 Jae 01/22/2010 EPendley Action: AP Rev 10 IR# 10615 Approved"Re-Issue to 3rd Revision to PermiY'dated 01.11.2010 Sheets A-001A, TOV-3 and A-003 PR 4hrs @$60= $240.00 Jae 02/11/2010 MDenney Action:AP Rev 14 IR# 10771 Modifications to Emergency Power Distribution and Elevator Control to Accommodate the Fire Marshal's Request Approved 2 hrs PR @$60 per hr= $120.00 Jae 02.11.10 02/16/2010 DGoodman Action: AP Rev 13 IR# 10767 Approved Sign Submittal No Added Valuation 2 hrs pr @$60 per hr= $120.00 JEaton 02.16.10 02/24/2010 E Pendley Action: DN Revised details regarding insulation location received. No additional valuation. One copy routed to Martin Haeberle, three copies routed to SafeBuilt. See Entry for Rev#11 Spray Applied Product Proposed Not Allowed Per ER Report 0146 and 2003 IBC Section 2603.5 Jae 02.24.2010 Item: 05400 PLANNING DEPARTMENT 05/28/2008 bgibson Action: AP 08/22/2008 bgibson Action: NA DEFERRED SUBMITTAL FOR INTERIOR FINISHES UNITS 701-705 09/25/2008 bgibson Action: AP 8/15/08 corrections 08/13/2009 bgibson Action: AP revisions to date 10/02/2009 bgibson Action: AP decorative copper chimney shrouds approved by planning 02/10/2010 bgibson Action: AP Sign package approved by Planning. plan routed to Safebuilt. Item: 05600 FIRE DEPARTMENT 02/12/2008 McGee Action: DN Vail Fire& Emergency Services 42 West Meadow Drive Vail, Colorado 81657 970-479-2250 Plan Review 608-0010 Landmark Town Homes January 18, 2008 We have reviewed the plans dated 01/18/08 under permit 608-0010. The comments are as follows: new_constructio n�erm it_041908 1. Fire protection and fire alarm plans were not attached to the set distributed to the Fire Dept. Plans need to be submitted before any additional review. 2. No Life Safety Report was submitted. 3. No specifications were submitted. 4. Fire staging in the Lionshead Mall is not acceptable. 5. No preliminary meetings were held in any significant level of detail with the FPE and Fire Dept prior to submittal. Therefore, no understanding exists as to the approach to fire protection, evacuation (plan required per IFC Chapter 4), emergency power, smoke management or other aspects. 6. Code sheet indicates the building is 84 ft, eight levels. From Lionshead Mall, this building is a high-rise. 7. Type construction is suspect as to Type III. See SafebuilYs analysis and review. 8. Fire flow has not been substantiated. 9. No fire dept access is available from the south entrance. Turning radius is too small. 10. Significant elements may impact the Landmark Tower, egress, elevator, fire alarm control panel location, etc. 11. Where is the fire control valve room? 12. Plans should indicate North Day Lot development and any"common elements" (sidewalks, egress, drainage, utilities) that are intended to be shared. 13. Snow removal on north side should be shown on plans or in narrative form. 14. Fire Dept strongly suggests a joint meeting with the architectural design team and the FPE before re-submittal. Review suspended pending additional information. Michael McGee Deputy Chief Vail Fire Department 02/19/2008 mcgee Action: CR Vail Fire Dept received a copy of the FA and FP plans on 2/19/08, dated 02/14/08. The plan review comments are as follows: The existing FDC's may not be accessible. Plans call for connecting to existing. Interconnecting the new standpipes will cause excessive delay in filling from a fire truck. Separate FDC's are required. The plans call for re-using the existing FACP. The capacity of the existing fire alarm control panel may not handle both buildings. Fire department hose connections are required in the new garage, both levels. new_construction�erm it_041908 The review of the design of the interstitial space is held in abeyance until details in building construction type are resolved with Safebuilt. 06/06/2008 McGee Action: AP Approved as noted: 1. Operational Plan is approved as submitted 06/05/08. 2. Deferred submittals are subject to review. 06/13/2008 McGee Action:AP Release of full building permit approved on condition as indicated in the attached email: Mike, Per our telephone conversation, Schirmer Engineering is under contract with the Owner to prepare the pressurization pertormance specification and the modeling analyses as you and he discussed earlier this morning. We will be resubmitting the drawings today, with the performance spec to follow early next week. The subsequent modeling will inform the design team of the mechanical changes necessary, which will follow as deferred submittals. From our conversation, I understand this process meets your approval and that you will lift the fire departmenYs hold on issuing the building permit. The permit number is 608-0010. Thank you again for all of your assistance throughout this process. Regards, Ed Curley LEED AP Architecture and Planning A. Epstein and Sons International, Inc. 600 W. Fulton Street Chicago, IL 60661-1259 Tele: 312.454.9100 Direct: 312.429.8210 Fax: 312.559.1217 06/26/2008 mcgee Action: AP Xcel Energy conducted assessment of existing gas meter set at 10:00 AM, 06/26/08, and determined existing meter locations are new_construction�erm it_041908 adequate for expressed intent. 04/17/2009 mcgee Action: AP 701 -705 Finish Furnish Proof of Asbestos Clearence. Provide seperat fire alarm and fire sprinkler permits to reflect changes.. Scope letter must be stamped by FPE of Record. 04/17/2009 mcgee Action: AP AESI P.N. 2721000 08/14/08 1. Fire Department records do not show agreement to delete pressurization from elevator/stair. Lowest level of fire department access is greater than 75 ft to highest occupied floor. Sheet M 100 shows supply fans for stairway pressurization. 2. Electrical rooms that open into elevator lobby pose a concern, especially if pressurization is eliminated. 3. Applicant is advised ship ladder specifications are posted on TOV website. All ships ladders provided fire department access shall meet VFES specifications. Sheet A 705 04/23/2009 mcgee Action: CR Rev#2 to Permit Set Received 03 25 09 Sheet Comments TOV-1 Plans show setback variance from face of Concert Hall Bldg. Exterior face of Concert Hall is combustible. TOV-5 Plans show the electrical room opens to the elevator lobby. In the event of electrical fault in the electrical room, the entire elevator may become unusable for evacuation of non-ambulatory persons on upper floors. See Sheet A 106: Original plans called for pressurization of elevator lobbies. No equivalency has been demonstrated. A 003 Landscaping shown would obstruct fire depa�tment connections. A 705 See TOV Fire Dept standards for ships ladders. M 100 Plans show SF 5 and 6 are to pressurize stairwell. Plan notes indicate CO detectors for garage. Plans do not indicate location or operational sequence of CO detectors for guest rooms. M 102 SF 3 requires smoke detector. M 201 Use of laundry and electrical rooms for employee break room, office or storage is prohibited. 08/11/2009 McGee Action: AP Revision approved per correspondence wit Architect. 08/21/2009 McGee Action: AP Car Ramp new_constructio n�ermit_041908 Revise fire sprinkler plans as needed. 11/09/2009 McGee Action:AP Fire stopping plan dated Oct 26, 2009. Special inspection by others. 11/23/2009 mvaughan Action: AP revision 3 asbuilts of fire protection drawings dated11/13/09 02/17/2010 mvaughan Action: AP signage package approved. 02/25/2010 McGee Action: CR Revision 13 Mech G111 /Storage G106. Submit revisions to fire alarm and fire sprinkler plans. Scope letter is acceptable. 02/25/2010 McGee Action: AP Revision 11 Electrical circuit to east elevator for em power. Item: 05500 PUBLIC WORKS 04/02/2008 csalli Action: CR correction letter sent with Safebuilt's letter in Feb 2008 04/10/2008 csalli Action: CR corrections letter sent to safebuilt to be coordinated with other dept comments 4/10/08 06/02/2008 csalli Action: COND Full building permit approved with the following conditions: 1. The Construction License Agreement will need to be executed prior to installation of any shoring in public right of way. 2. A revocable permit for private improvements in public right of way shall be executed prior to any T.C.O. or C.O. 3. A Heat Maintenance Agreement will need to be executed for the snowmelted sidewalk along W Lionshead Cir prior to any T.C.O. or C.O. 4. The existing street light in confilct with the proposed storm sewer identified as profile 1 shall be replaced with a new TOV Village Street Light and installed in a location to be approved by the Town of Vail. Item: 05101 BUILDING DEPT REVISION 10/02/2009 MARTIN Action: AP Approved submittal of chimmney caps from Arapahoe roofing dated 9/29/2009 }ff4if4fr4it��t}fR#Mi�l�IA*ifiR+tf#'F#�tit�tf*f��4+t4+t�4+t##4Rkkf�Iiffl�liA}�M##f�F#YfM144M�.Yf##Yfi4tfy'YeffY�YYlYYY�4�kYY'i4Yy't�4#�YY*'k'kitiktr4tr Wrt9'YiFYY44#YMiF4i1'Yf YfY#f'ikfrttYri4i4YYrfrtY4RiY'MiYiR�rtlt4fi�Rfwffix4t�f}#ifff• See the Conditions section of this Document for any that may apply. new_construction_perm it_041908 .���+��xx,�ww��::x::w�wrrr���►rxwrw���xw�:::��titi��rw�w��,N.���+in.�:�::x�::::x�r:ixr�ixyx�3�e�����extrw����R+����xxwr���txtttrxix�x��:��w�wx�w��tee�:rx++���t�et���e���t�re�e��rr�te�r CONDITIONS OF APPROVAL Permit#: B08-0010 as of 03-03-2010 Status: ISSUED ..........................«.......,,...,,.,...««............,.....,.,,..,..»,.....,...,.,,...,.....,.,.,,,...,,,.........,..,........,�...,,.,..,...,..,.....,.,...,,....,........... Cond: CON0010058 FIRE DEPARTMENT: Approved as noted: 1. Operational Plan is approved as submitted 06/05/08. 2. Deferred submittals are subject to review. PUBLIC WORKS: Full building permit approved with the following conditions: 1. The Construction License Agreement will need to be executed prior to installation of any shoring in public right of way. 2. A revocable permit for private improvements in public right of way shall be executed prior to any T.C.O. or C.O. 3. A Heat Maintenance Agreement will need to be executed for the snowmelted sidewalk along W Lionshead Cir prior to any T.C.O. or C.O. 4. The existing street light in confilct with the proposed storm sewer identified as profile 1 shall be replaced with a new TOV Village Street Light and installed in a location to be approved by the Town of Vail. � BUILDING DEPARTMENT: The release of this portion of the permit does not constitute the approval of the full building permit. The remaining issues on the third correction letter, dated 4/11/08, will have to be addressed completely for issuance of the full building permit. The owner and contractor are obli ated to return the site to the ori inal condition if a 9 9 I full buildin ermit is not issued. 9P Cond: CON0010123 SEE APPROVAL LETTER DATED JUNE 23, 2008 FROM SAFEBUILT FOR � APPROVAL CONDITIONS: 1. PROVIDE WET-STAMPED LETTER FROM STRUCTURAL ENGINEER TO VERIFY EXISTING CONCRETE IS ADEQUATE AND PROVIDE DETAILS FOR ANY REPAIRS DEEMED NECESSARY. 2. PROVIDE COMPLETE FIRE-STOPPING SUBMITTAL. ONE COMPREHENSIVE SUBMITTAL FROM THE ARCHITECT OF RECORD IS REQUIRED. 3. PROVIDE PRESSURIZATION OF STAIR AND ELEVATOR CORES TO SATISFACTION OF VAIL FIRE DEPARTMENT. 4. MAIN ENTRY DOORS IN NEW LOBBY, #G100A ND G1006 ARE SHOWN AS MEANS OF EGRESS FROM OTHER AREAS IN THE BUILDING THAT WILL BE OCCUPIED WHEN LOBBY IS CLOSED. THESE DOORS ARE TO REMAIN UNLOCKED FROM THE EGRESS SIDE AT ALL TIMES. Cond: CON0010635 701 -705 Finish Furnish Proof of Asbestos Clearence. new_construction�erm it_041908 Provide seperat fire alarm and flre sprinkler permits to reflect changes.. Scope letter must be stamped by FPE of Record. Cond: CON0010636 AESI P.N. 2721000 08/14/08 1. Fire Department records do not show agreement to delete pressurization from elevator/stair. Lowest level of fire department access is greater than 75 ft to highest occupied floor. Sheet M 100 shows supply fans for stairway pressurization. 2. Electrical rooms that open into elevator lobby pose a concern, especially if pressurization is eliminated. 3. Applicant is advised ship ladder specifications are posted on TOV website. All ships ladders provided fire department access shall meet VFES specifications. Sheet A 705 new_constructio n_perm it_041908 ****�**�*************�***************�**********�***************************�*****�**+****** TOWN OF VAIL, COLORADO Statement *�*****�********��*******�******************************************�**�******************** Statement Number: R100000155 Amount: $120.00 03/03/201009:31 AM Payment Method: Check Init: LC Notation: #42400 / ALTER DESIGN BUILDERS ----------------------------------------------------------------------------- Permit No: B08-0010 Type: NEW MULTI-FAM BUILD PERM Parcel No: 2101-063-0700-1 Site Address: 612 W LIONSHEAD CR VAIL Location: LANDMARK CONDOS Total Fees: 203, 900.44 This Payment: $120.00 Total ALL Pmts: 203, 900.44 Balance: $0.00 **+**************************�*******************�********�******************s*s************ ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ 00100003112300, GFPO PLAN CK - project GFP012 120.00 ----------------------------------------------------------------------------- n �/` �t`�1�������inc. co�a��aa anitafng nepartment services February 11, 2010 - - - ---- �� Martin Haeberte �� Chief Building Official, Town of Vail � 75 South Frontage Road Vail, CO 81657 RE: Modifications to the emergency power distri vator control PROJECT: Landmark PERMIT NUMBER: 608-0010 REVISION#: 14 INTERNAL REF#: 10771 ADDRESS: 610 West Lionshead Circle Dear Mr. Haeberle, SAFEbuilt Colorado has reviewed the documents listed below for conformance to the Intemational Codes as adopted by the Town of Vail. SAFEbuilt Colorado finds the documents submitted to be complete for construction. Safebuilt has no objection to issue these documents for constn.�ction and will confirm conformance to the 2005 NEC through field inspection. We recommend these plans be reviewed by the Town's Fire Department, NWCOG Elevator Team and coordinate with the Landmark's Fire Protection Engineer of Record. Plans: Three sets of documents issued as"Modifications to the emergency power distribution and elevator control to accommodate the Fire Marshal's RequesY'. This submittal contains two sheets of electrical drawings labeled E100 and E203A with a delta "32"dated 1/27/10 No Added Valuation I Additional fees due =2 hours @$60.00 �_ Sincere , M enney SAFEbuilt CO Senior Electrical Inspector matt.denne�(cr�,S AFEbuilt.com Page 1 of 1 SAFEbuilt Colorado Eagle Office✓P.O.Box 1618✓ 1286 Chambers Avenue,Unit 101 ✓Eagle,Colorado 81631 Phone:(970)328-1790✓Toll Free:(877)428-6412✓Fax:(970)328-1791✓ V:�Plan Review\Vail\Landmark�B08- 0010 revl4_IR10771_FAL.doc Y �,�4 �����'a Ii �nt+�, ��' � ' �" � 2 F��-u h � a� -� ,� '." „�p � �= �~ � �r: ' !; � �.i :�.� �it ILlbieyFMab���tot�t�.C�Fnc���i�������mer��"� � _ :, ``> ` � �';� �'- �• , '� � :�3 S+outh F,� tag�. � • . ` , � ;,, � ` � .� . �;: ;� '�". , �r -' � ���- . , -' ., � #�4 f� T� q � �-��F ,.:�_' � .. � w ,.,�� �' �•� 'r . -_ ' i. < 1 - .} _� g . e 7 =l, v � �1�-�'.:s': a� e� r` � 1. t°} � . ,� .�' . ,��A _ e . �� TRAN TT RM Town o� Vail Revision Submittals: 1 OFFl�� COPY 1. "Field SeY'of approved plans MUST a mp ny revisions. 2. No further inspections will be perfo►med until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum),and are due upon issuance. F���nformation applies to: Attention: (�)Revisions B08-0010 Martin Haeberle � � attached copy of correction letter ( )Deferred Submittal ( )Other Project Street Address: 610 Lionshead Cirde Description/List of Changes: (Number) (Street) (Suite#� Modifications to the emergency power distribution Building/Complex Name: The Landmark and elevator control to accommodate the Fire Marshall's requests. Contact Information: Company: Alter Design Buitders 4 stamped copies of each- E100, ��_:;`,_'., E203A Company Address: 5500 W. Howard St. ��y. Skokie State: IL Z�p: 60077 Contad Name: Howard Olsen Contact Phone: 970 389-2881 E-Mai1 holsen�altergroup.com Revised ADDITIONAL Valuations(Labor&Materials) (DO NOT include original valuation) Building: $ (use additional sheet if necessary) Plumbing: $ Date Received: Electrical: $ Mechanical: $ Total: $ � � � � �/ � D FEB O 1 Z010 TOWN OF VAlL 0 Jan-10 a � �~ �' � ae�c Architectural Engineering Consultants Mechanical, Electrical & Lighting Design Services An Office with LEED�Accredited Professionals Letter of Transmittal To: Sharon Olsen From: Derek Felschow Re: Landmark Elevator Switching D�e: January 27, 2010 AEC#10000 WE ARE SENDING YOU THE FOLLOWING ITEMS: X ATTACHED ❑ UNDER SEPARATE COVER VIA DROPOFF. ❑ SHOP DRAWINGS ❑ SPECIFICAT�ONS ❑ PRINTS ❑ COPY OF LETTER X PLANS ❑ CHANGE ORDER ❑ SAMPLES QTY. DATE DESCRtPTtON 4 1/27/10 Stam ed Electrical drawin s THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL X FOR YOUR USE X AS REQUESTED ❑ REJECTED ❑ PRINTS RETURNED AFTER LOANED TO US REMARKS: SIGNED: �P.YP.ki�e%��r('.�1�(T147 CC: IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US 40801 U5 Hwy 6&24,Suite 214,Eagle-Vail,Colorado 81620, Post Office Box 8489,Avon,CO 81620 Phone: 970-748-8520 Facsimile: 970-748-8521 E-mail: Stan@aec-vail.com Web: www.aec-vail.com � I I � NOTE: THIS PERMIT MUST BE POSTED ON, JOBSITE AT ALL TIMES .� �nwxo�vn� � Town of Vail, Community Development, 75 South Frontage Road,Vail,Colorado 81657 p.970.479.2139, f.970.479.2452, inpsections 970.479.2149 NEW MULTI-FAM BUILD PERM Permit #: B08-0010 Project #: PRJ06-0474 Job Address: 612 W LIONSHEAD CR VAIL Status. . : REVISION Location......: LANDMARK CONDOS Applied. . : 01/24/2008 Parcel No....: 210106307001 Issued... : 02/17/2010 Expires. ..: 11/25/2009 OWNER MARY SULLIVAN JOSEPHS TRUST 01/24/2008 MICHELE H. 1308 E CAMPBELL ST ARLINGTON HEIGHTS IL 60004 APPLICANT ALTER DESIGN BUILDERS LLC 01/24/2008 Phone:970-479-5330(LOCAL PHON 5500 W. HOWARD ST. SKOKIE IL 60077 License:352-A CONTRACTOR ALTER DESIGN BUILDERS LLC 01/24/2008 Phone: 970-479-5330(LOCAL PHON ' 5500 W. HOWARD ST. SKOKIE IL 60077 License:352-A Description: LANDMARK-CONSTRUCT NEW FACADE ON EXISTING 7 STORY STRUCTURE.CONSTRUCT NEW ELEVATORlCLOCK TOWER AND NEW/EXISTING TOWN HOME BUILDING; 17 NEW CONCOMINIUMS,NEW LOBBY STRUCTURE; NEW BELOW GROUND GROUND PARKING STRUCTURE; CONSTRUCT NEW WEST BALCONY ENCLOSURE AND SENENTH FLOOR MEZZANINE EXPANSION FOR THE LANDMARK CONDOS RENOVATION AND ADDITION Occupancy Type Factor Sq Feet Valuation Tota Is... 44,588$25,525,000.00" Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $25,525,000.00 Type Construction: Total Sq Ft Added: 44588 .............................................................,....«..,,........... FEE SUMMARY ........,.,,...............,,,.....,.,..,..........,.....,.......,,...,......... Building Permit Fee----> $95,125.00 Will Call------------=------> $4.00 Totai Calculated Fees----------> 711,848.25 Plan Check------------> $61,831.25 Use Tax Fee----------------> 510,300.00 Additional Fees---------------> 08,067.81) Add'I Plan Check Hours-> $0.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES-----------> 203,780.44 Investigation----------> $0.00 Recreation Fee------------> $44,588.00 Payments------------------------> 203,780.44 _. Total Calculated Fees-----> 711,848.25 BALANCE DUE---------------------> 50.00 ..................................................«..........».,...,.,......,........................,......,.......,...:..,:.....:...,,.._,......_,.,....,.__._.....,.,_...,,...,,,,,,_ DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION ALL MA ENTY- R HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 M-4 00 P ��l f'/� Signatu r or Contractor Date new_construction_permit_041908 Print Name new_construction�erm it_041908 :r�e�trxt:�k��:�x::w�i�sr:er�t��:��x:wwww�ex���xw�a�►�:www�xwzw�ww�t�,�v���+���rr+„n�::::�xt�i���wrrrr���x�:►x�►�.wxrr�e�w�r��rrww+�►:x��xrxx�����+��tt�+���w��+www:�xii:�::::e:x�r�ti� APPROVALS Permit#: B08-0010 as of 02-17-2010 Status: REVISION .......................................................................................................................>........,,..,...................,..,.,,,,........,.......,,,.,, Item: 05100 BUILDING DEPARTMENT 02/26/2008 jplano Action: CR CORRECTION LETTER SENT 04/11/2008 jplano Action: CR 2ND CORRECTION LETTER SENT 05/28/2008 jplano Action: CR 3RD CORRECTION LETTER SENT 06/02/2008 jplano Action: PA MICRO-PILE INSTALLATION ONLY, ISSUES STILL PENDING FOR THE FULL PERMIT 06/25/2008 NSC Action: AP approved full set of drawings IR#6566 09/22/2008 jplano Action: AP Rev1, Approved, loft finishes in the tower. Date stamped by SAFEbuilt 8/22/08, 3 hour plan review due=$180.00 10/01/2008 jplano Action: CR REV2/IR8775- CORRECTION LETTER SENT REGARDING ADDITIONAL SQUARE FOOTAGE SUBMITTAL, 3488 ADDITIONAL SQUARE FEET 11/10/2008 jplano Action: CR REV2/IR8775-2ND CORRECTION LETTER SENT REGARDING ADDITIONAL SQUARE FO.OTAGE SUBMITTAL, 3488 ADDITIONAL SQUARE FEET, PROBLEM WITH EXITING FROM PARKING STRUCTURE . 11/12/2008 jplano Action: AP REV2/IR8775- APPROVED, 3488 ADDITIONAL SQUARE FEET, PROBLEM WITH EXITING FROM PARKING STRUCTURE WAS REMOVED FROM THE PLANS, 30 HOURS DUE=$1800 02/13/2009 jplano Action: CR Rev3/IR9710- Correction letter sent on revisions to shoring 03/30/2009 jplano Action: AP Rev3/IR9710- Approved-Corrections addressed, Please have appropriate TOV departments approve accordingly prior to issuance. $1380.00 due 04/21/2009jplano Action: AP Rev5/IR9858, Approved new set of drawings date stamped by SB 4/21/09, 15 hours of plan review due=$900.00 04/21/2009 jplano Action: COND Rev4 returned to TOV for inhouse review 08/11/2009 E Pendley Action: AP IR# 10276 Public Access Car Ramp Revisions Rev 6 Approved 1.5 hours @ $60 =$90.00 10/26/2009 C Davis Action: AP IR# 10526 Rev 7 Landmark Boiler Flue/Shaft Wall Clearance Modification 3 hours @$60.00= $180.00 No added sq ftage no added valuation 11%06/2009 EPendley Action: AP IR#10548 REV 8 Additional Fire Stopping Review Approved Additional Fee $9�0.00 JEaton 11%16/2009 EPendley Action: AP IR# 10576 Rev 9 (Relates M08-0145) Duct Changes Approved Units 51, 52, 53, 54, 55, 56, 57 No Added Valuation 2 Hrs PR @ $60 per Hr. $120.00 11/18/2009 E Pendley Action: DN This submittal is denied due to plans not matching transmittal sheet. SAFEbuilt did not receive FP Plans. Did receive changes to mechanical system. (Revised fire sprinkler plans received, routed to Safe Built and Fire. No additional new_construction�erm it_041908 valuation.)This note was entered under L/H/N. JEaton 11.18.09 12/18/2009 E Pendley Action: DN Rev 10 IR# 10615 Co�rected Submittal for Mechanical Room Revision Corrections Required Comment Letter Sent via Email to HOlsen on 12.18.09 J Eaton 01/11/2010 NSC Action: DN Rev11 IR#10616 Correction letter sent on 1/11/10 for Spray Applied Foam insulation in Ext wall 01/22/2010 Ependley Action: AP Revised mechanical plans received. Four copies routed to SafeBuilt. No additional valuation. Rev 12 IR 10699 Plan Review 2 hrs @$60=$120 Jae 01/22/2010 EPendley Action: AP Rev 10 IR# 10615 Approved"Re-Issue to 3rd Revision to PermiY'dated 01.11.2010 Sheets A-001A, TOV-3 and A-003 PR 4hrs @$60= $240.00 Jae 02/11/2010 MDenney Action: AP Rev 14 IR# 10771 Modifications to Emergency Power Distribution and Elevator Control to Accommodate the Fire Marshal's Request Approved 2 hrs PR @$60 per hr= $120.00 Jae 02.11.10 02/16/2010 DGoodman Action: AP Rev 13 IR# 10767 Approved Sign Submittal No Added Valuation 2 hrs pr @$60 per hr= $120.00 JEaton 02.16.10 Item: 05400 PLANNING DEPARTMENT 05%28/2008 bgibson Action: AP 08/22/2008 bgibson Action: NA DEFERRED SUBMITTAL FOR INTERIOR FINISHES UNITS 701-705 09/25/2008 bgibson Action: AP 8/15/08 corrections 08/13/2009 bgibson Action: AP revisions to date 10/02/2009 bgibson Action: AP decorative copper chimney shrouds approved by planning 02/10/2010 bgibson Action: AP Sign package approved by Planning. plan routed to Safebuilt. Item:'05600 FIRE DEPARTMENT 02/12/2008 McGee Action: DN Vail Fire& Emergency Services 42 West Meadow Drive Vail, Colorado 81657 970-479-2250 Plan Review 608-0010 Landmark Town Homes January 18, 2008 We have reviewed the plans dated 01/18/08 under permit B08-0010. The comments are as follows: 1.; Fire protection and fire alarm plans were not attached to the set distributed to the Fire Dept. Plans need to be submitted before any additional review. 2. No Life Safety Report was submitted. 3. No specifications were submitted. new_construction�erm it_041908 4. Fire staging in the Lionshead Mall is not acceptable. 5. No preliminary meetings were held in any significant level of detail with the FPE and Fire Dept prior to submittal. Therefore, no understanding exists as to the approach to fire protection, evacuation (plan required per IFC Chapter 4), emergency power, smoke management or other aspects. 6. Code sheet indicates the building is 84 ft, eight levels. From Lionshead Mall, this building is a high-rise. 7. Type construction is suspect as to Type III. See SafebuilYs analysis and review. 8. Fire flow has not been substantiated. 9. No fire dept access is available from the south entrance. Turning radius is too small. 10. Significant elements may impact the Landmark Tower, egress, elevator, fire alarm control panel location, etc. 11. Where is the fire control valve room? 12. Plans should indicate North Day Lot development and any"common elements" (sidewalks, egress, drainage, utilities)that are intended to be shared. 13. Snow removal on north side should be shown on plans or in narrative form. 14. Fire Dept strongly suggests a joint meeting with the architectural design team and the FPE before re-submittal. Review suspended pending additional information. Michael McGee Deputy Chief Vail Fire Department 02/19/2008 mcgee Action: CR Vail Fire Dept received a copy of the FA and FP plans on 2/19/08, dated 02/14/08. The plan review comments are as follows: The existing FDC's may not be accessible. Plans call for corinecting to existing. Interconnecting the new standpipes will cause excessive delay in filling from a fire truck. Separate FDC's are required. The plans call for re-using the existing FACP. The capacity of the existing fire alarm control panel may not handle both buildings. � Fire department hose connections are required in the new garage, both levels. The review of the design of the interstitial space is held in abeyance until details in building construction type are resolved with Safebuilt. new_construction_perm it_041908 06/06/2008 McGee Action:AP Approved as noted: 1. Operational Plan is approved as submitted 06/05/08. 2. Deferred submittals are subject to review. 06/13/2008 McGee Action: AP Release of full building permit approved on condition as indicated in the attached email: Mike, Per our telephone conversation, Schirmer Engineering is under contract with the Owner to prepare the pressurization pertormance specification and the modeling analyses as you and he discussed earlier this morning. We will be resubmitting the drawings today, with the performance spec to follow early next week. The subsequent modeling will inform the design team of the mechanical changes necessary, which will follow as deferred submittals. From our conversation, I understand this process meets your approval and that you will lift the fire departmenYs hold on issuing the building permit. The permit number is 608-0010. Thank you again for all of your assistance throughout this process. Regards, Ed Curley LEED AP Architecture and Planning A. Epstein and Sons International, Inc. 600 W. Fulton Street Chicago, IL 60661-1259 Tele: 312.454.9100 Direct: 312.429.8210 Fax: 312.559.1217 06/26/2008 mcgee Action: AP Xcel Energy conducted assessment of existing gas meter set at 10:00 AM, 06/26/08, and determined existing meter locations are adequate for expressed intent. 04/17/2009 mcgee Action: AP 701 -705 Finish Furnish Proof of Asbestos Clearence. Provide seperat fire alarm and fire sprinkler permits to reflect changes.. Scope letter must be stamped by FPE of new_construction�erm it_041908 Record. 04/17/2009 mcgee Action: AP AESI P.N. 2721000 08/14/08 1. Fire Department records do not show agreement to delete pressurization from elevator/stair. Lowest level of fire department access is greater than 75 ft to highest occupied floor. Sheet M 100 shows supply fans for stairway pressurization. 2. Electrical rooms that open into elevator lobby pose a concern, especially if pressurization is eliminated. 3. Applicant is advised ship ladder specifications are posted on TOV website. All ships ladders provided fire department access shall meet VFES specifications. Sheet A 705 04/23/2009 mcgee Action: CR Rev#2 to Permit Set Received 03 25 09 Sheet Comments TOV-1 Plans show setback variance from face of Concert Hall Bldg. Exterior face of Concert Hall is combustible. TOV-5 Plans show the electrical room opens to the elevator lobby. In the event of electrical fault in the electrical room, the entire elevator may become unusable for evacuation of non-ambulatory persons on upper floors. See Sheet A 106. Original plans called for pressurization of elevator lobbies. No equivalency has been demonstrated. A 003 Landscaping shown would obstruct fire department connections. A 705 See TOV Fire Dept standards for ships ladders. M 100 Plans show SF 5 and 6 are to pressurize stairwell. Plan notes indicate CO detectors for garage. Plans do not indicate location or operational sequence of CO detectors for guest rooms. M:102 SF 3 requires smoke detector. M 201 Use of laundry and electrical rooms for employee break room, office or storage is prohibited. 08/11/2009 McGee Action: AP Revision approved per correspondence wit Architect. 08/21/2009 McGee Action: AP Car Ramp Revise fire sprinkler plans as needed. 11/09/2009 McGee Action: AP Fire stopping plan dated Oct 26, 2009. Special inspection by others. 11/23/2009 mvaughan Action: AP revision 3 new_construction_perm it_041908 asbuilts of fire protection drawings dated11/13/09 02/17/2010 mvaughan Action:AP signage package approved. Item: 05500 PUBLIC WORKS 04/02/2008 csalli Action: CR correction letter sent with SafebuilYs letter in Feb 2008 04/10/2008 csalli Action: CR corrections letter sent to safebuilt to be coordinated with other dept comments 4/10/08 06/02/2008 csalli Action: COND Full building permit approved with the following conditions: 1. The Construction License Agreement will need to be executed prior to installation of any shoring in public right of way. 2: A revocable permit for private improvements in public right of way shall be executed prior to any T.C.O. or C:O. 3. A Heat Maintenance Agreement will need to be executed for the snowmelted sidewalk along W Lionshead Cir prior to any T.C.O. or C.O. 4. The existing street light in confilct with the proposed storm sewer identified as profile 1 shall be replaced with a new TOV Village Street Light and installed in a location to be approved by the Town of Vail. Item: 05101 BUILDING DEPT REVISION 10/02/2009 MARTIN Action: AP Approved submittal of chimmney caps from Arapahoe roofing dated 9/29/2009 •t#YffYY�kfY4tf�f��Rf'f'ff1Hf'�Z1V V f'Yf�Yf ffiF#y'44wA�tilf'f1'f'1rR1f}t V f'fffYtfYYfYfMf-I�/�kwYife#4f�aAJ#RfRRf4lrRf'Y4iRYy'YliR#Y��kiF�/i`4feff�l4f'Rf#fRfVftiRY4 V 41R##fiF####fr/+ld�lfrR#�1d1f'f'f'H�kff'rtfiRfYtiRY�kY'fiiYRY'tRilf See tHe Conditions section of this Document for any that may apply. new_construction�erm it_041908 •�4tRt!*/Nif4�ff��1kriYtR�*1rf/f�tHfYftlf f��*►ff�*��fff tfHYf f wtwkAA�f��►*�frRfflttfYff�wwwt�w*/*�f►frffl�f fwYww*tR��***#i�ff�t!#YYw�****►*�**f RflfltwwwwwwR****!*xl�44�tfftlHfYkYtkY� CONDITIONS OF APPROVAL Permit#: B08-0010 as of 02-17-2010 Status: REVISION »...............................................................,....,,.........,..,..,....,.........,,...............................,.....,.........,..,,.,,,.,.,..,...,.....,....,. Cond: CON0010058 FIRE DEPARTMENT: Approved as noted: 1. Operational Plan is approved as submitted 06/05/08. 2. Deferred submittals are subject to review. PUBLIC WORKS: Full building permit approved with the following conditions: 1. The Construction License Agreement will need to be executed prior to installation of any shoring in public right of way. 2. A revocable permit for private improvements in public right of way shall be executed prior to any T.C.O. or C.O. 3. A Heat Maintenance Agreement will need to be executed for the snowmelted sidewalk along W Lionshead Cir prior to any T.C.O. or C.O. 4. The existing street light in confilct with the proposed storm sewer identified as profile 1 shall be replaced with a new TOV Village Street Light and installed in a location to be approved by the Town of Vail. BUILDING DEPARTMENT: The release of this portion of the permit does not constitute the approval of the full building permit. The remaining issues on the third correction letter, dated 4/11/08, will have to be addressed completefy for issuance of the full building permit. The owner and contractor are obligated to retum the site to the original condition if a full building permit is not issued. Cond: CON0010123 SEE APPROVAL LETTER DATED JUNE 23, 2008 FROM SAFEBUILT FOR APPROVAL CONDITIONS: 1. PROVIDE WET-STAMPED LETTER FROM STRUCTURAL ENGINEER TO VERIFY EXISTING CONCRETE IS ADEQUATE AND PROVIDE DETAILS FOR ANY REPAIRS DEEMED NECESSARY. 2. PROVIDE COMPLETE FIRE-STOPPING SUBMITTAL. ONE COMPREHENSIVE SUBMITTAL FROM THE ARCHITECT OF RECORD IS REQUIRED. � 3. PROVIDE PRESSURIZATION OF STAIR AND ELEVATOR CORES TO � SATISFACTION OF VAIL FIRE DEPARTMENT. 4. MAIN ENTRY DOORS IN NEW LOBBY, #G100A ND G100B ARE SHOWN AS MEANS OF EGRESS FROM OTHER AREAS IN THE BUILDING THAT WILL BE OCCUPIED WHEN LOBBY IS CLOSED. THESE DOORS ARE TO REMAIN UNLOCKED FROM THE EGRESS SIDE AT ALL TIMES. Cond: CON0010635 701 -705 Finish Furnish Proof of Asbestos Clearence. new_construction_perm it_041908 Provide seperat fire alarm and fire sprinkler permits to reflect changes.. Scope letter must be stamped by FPE of Record. Cond: CON0010636 AESI P.N. 2721000 08/14/08 1. Fire Department records do not show agreement to delete pressurization from elevator/stair. Lowest level of fire department access is greater than 75 ft to highest occupied floor. Sheet M 100 shows supply fans for stairway pressurization. 2. Electrical rooms that open into elevator lobby pose a concern, especially if pressurization is eliminated. 3. Applicant is advised ship ladder specifications are posted on TOV website. All ships ladders provided fire department access shall meet VFES specifications. Sheet A 705 new construction�ermit_041908 ************************************��*�************���************************************* TOWN OF VAIL, COLORADO Statement ********************�***r***��***�***********����*********�********************************* Statement Number: R100000120 Amount: $120.00 02/17/201010:34 AM Payment Method: Check Init: SAB Notation: 42401 ALTER DESIGN -------------------------------------------------------------------------=--- Permit No: B08-0010 Type: NEW MULTI-FAM BUILD PERM Parcel No: 2101-063-0700-1 Site Address: 612 W LIONSHEAD CR VAIL Location: LANDMARK CONDOS Total Fees: 203,780.44 This Payment: $120.00 Total ALL Pmts: 203,780.44 Balance: $0.00 ******************************�**************************�****�***************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ 00100003112300, GFPO PLAN CK - project GFP012 120.00 ----------------------------------------------------------------------------- Y �A��b�ltl�inc. COLt3RADCJ Building Department Servi�ea February 11, 2010 Martin Haeberle Chief Building Official, Town of Vail 75 South Frontage Road Vail, CO 81657 RE: Sign Package for the Landmark Project � �^n (J ' v• 1 � PROJECT: Landmark � PERMIT NUMBER: B08-0010 `�,� REVISION#: 13 Y INTERNAL REF#: 10767 ADDRESS: 610 West Lionshead Circle � Dear Mr. Haeberle, SAFEbuilt Colorado has reviewed the documents listed below for conformance to the Intemational Codes as adopted by the Town of Vail. SAFEbuilt Colorado finds the documents submitted to be complete for construction and installation. I Plans: Three sets of documents issued as "Signage Package". This submittal contains ten sheets of 8.5"x 11" sized plans, labeled Sign Type C, Sign Type L, Sign Type P, Sign Type PP New, New Sign Type QQ, Sign Type R-1, Sign Type R-2, Sign Type S, Sign Type U, & Sign Type W. Also included in the submittal are 11"x 17" plan sheets with label "Final Set Dated December 21, 2009." No Added Valuation Additional fees due =2 hours @$60.00 Sincerely, David Goodman SAFEbuilt Inc. � ICC Certified Plans Examiner david.goodman(a�SAFEbuilt.com Page 1 of 1 SAFEbuilt Colorado Eagle Office✓P.O.Box 1618✓ 1286 Chambers Avenue,Unit 101 ✓Eagle,Colorado 81631 Phone:(970)328-1790✓Toll Free:(877)428-6412✓Fax:(970)328-1791✓ V:�Plan Review\Vail�Landmark\B08- 0010 rev13 IR10767 FAL.doc y�� 4 = � _ '�+�."z3 S-� ; ,�,������ ;p �1�:�tt�f � �' ;._ ��+��spme .�. ' �} �'. y,�* �"� � ` �'� .�'3 S+DUth F� tage� �,i�'� � •s� ,_ ,'� ,,,�'' . � � �'6 `�, x t"S�i � �Y - . ys: . � :` ..dl� , ;�'74^ ,�� 't � .,.'!.i.r\„ }' ��•�' � � s`� 4 '� ,'�y��� �Py 2 . � •; . .. � ����,���. ` . „A tj�� � � '* � ,� �� _ ��.y _� �•`�",:u�,x . ��: `, f'4. M ��, a ' � . _; . ._ � _ e. • �.�: � + �, TRANSMITTAL FORM � , � �� Revision Submittals: �� "� 1. "Field Set°of approved plans MUST accompany revisions. � 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. I � 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum), and are due upon issuance. Permit#(s)information applies to: Attention: ( )Revisions �� � �� B08-0010 Martin Haeberle � � attacbed co Correction Letter py of correction tetter ( )Deferred Submittal (�)Other Project Street Address: 610 West Lionshead Circle Description/List of Changes: - (Number) (Street) (Suite#) Signage Package-4 copies Building/Complex Name: The Landmark Contact Information: Company: �ter Design Builders Company Address: 5500 W. Howard St ��y. Skokie State: IL Z�p: 60077 Contad Name: Howard Olsen Contad Phone: 970 389-2881 E-Mail holsen cLDaltergroup.com Town of Vail �" Reviaed ADDfTIONAL Valuations(Labor 8�Materials) ;�,�,�-,. ' (DO NOT include original valuation) Building: $ (use addit�onal sheet rf necessary) Plumbing: $ Date Received: Electrical: $ Mechanical: $ � ,�.,..,_,,.,,�,�� f-�'�-- Tota�: $ 0 D �5 v FEB O 1 2010 TOWN OF VAIL OI-Jan-10 . . i� � � Q V � EPSTEIN D ��g o 1 zoto January 4, 2010 T W��AI� Martin A. Haeberle, C.B.O. Chief Building Official ��wn of Vail ,; Town of Vail � 75 South Frontage Road v���� � ��� _ .:�_t_� ,_ Vail, Colorado 81657 RE: Landmark Condominiums Improvement Project Building Permit# B08-0010 AESI P.N. 2721000 Dear Martin, Architecture Interiors Epstein has reviewed the attached signage package prepared by R Design LLC, and, to the Engineeri�g best of our knowled e, understand it to com I with ANSI 117.1-98 Construction g p y Regards, ����� Edward Curley Architecture and Planning Epstein 600 West Fulton Street cn�ca9o,ur�o�s cc. Craig Rouse (R Design LLC) soss�-�z5s Michael Gardner(Alter) T(3121454-9100 Geoff Wright (Destination Resorts) F(372)559-1217 www.epsteinglobal.com qppftOVED Subject to inspection and C,ompliance to all relevant Adopted 8���►d����l �nd MunicTp�ae�Codes. Changes in Plans MUST t�" aF F Date��� gy� c��e: Q3 .Z'_B�___._.__----- snr E t;���i� ���,��,��,1�> 1 M _ OLD layout,11/2009 scale: 1/4"= 1" � .=�.5 °�'G f�"i � W W �:► 1-a � � O N O O � o � 1' � Modifications made: No modifications made, original height of font is 3.75" Sign Type C Overhead Message, Garage Entrance n � � � F- ADD 'L PARKING OLD layout,11/2009 scale: 1/8"= 1" :,:. � -� -rs �-p� o � � � n � O N O O df � O � ,.� � � a�-o� Modifications made: No modifications made, original height of font is 2.5" Sign Type L Overhead Directional, Garage Interior � m � OLD layout,11/2009 1"= 1" NEW layout, 12/2009 1"= 1" � � � � c � � � • a�.� � TAI R � .E25"Taetlb Meuape :-i'7��.t.�.��� Modifications made: • Replaced font with san serif, Helvetica Medium • Tactile letters and Grade II Braille • Message is all CAPS • Includes floor level Sign Type P Stair ID � � i -4o6 NEW layout, 12/2009 1"= 1" D "k t s-�r+ � � c �, �rs ~ 0 � 0 0 c� o � ;, �. °� .825'Tuiqe Messepe Gr1�7T: New Sign Type PP: • Includes san serif font, Helvetica Medium • Tactile letters and Grade II Braille • Message is all CAPS Sign Type PP,NEW Interstitial Spaces �o � � � r°' w o� c � � � �' O N O O G � � � r7" C rT°1 � m � � � e• IN CASE flF FIRE, USE STA.IRS, NOTELEVATOR NEW layout,12/2009 1"= 1" .4"Meaaape, VNtyl SxarM Surfece NEW Sign Type QQ: • Mounts directly below Elevator Call Sign outside the elevator door • Message is all CAPS • Map identifies nearest egress/exit NEW Sign Type QQ Elevator Evac Map r � ���� � � � ��� �.. _ I _ '. P'; Y_"" T, +�i �pt �J �j 1�! O N v - o °� ° � � � �-_I �. 1 u t� o0 .::.. . . . .... ITE 10 OLD layout,11/2009 1"= 1" NEW layout,12/2009 1"= 1" .Q25•Ta�tlls IIAea�e BRA�.LE Modifications made: • Replaced font with san serif, Heivetica Medium • Message is all CAPS Sign Type R-1 Office ID u a � s`� 0 0 d � �--� � � N '�- 0 � 0 .� 6' � xe cut�ve • ���V � E�E TIVE FFI E OLD layout,11/2009 1"= 1" Modifications made: • Replaced font with san serif, Helvetica Medium • Message is all CAPS NEW layout,12/2009 1"= 1" .825'T�etlb Messaqe � Sign Type R-2 Back of House - Room ID � 0 � 4' OLD layout, 11/2009 1"= 1" ,:. � � c � � � . o N � O � � � 4' NEW layout,12/2009 1"= 1" Tactile Lo�n � 1 1'T�ctlb Numbera ctl —1�— t3RAILLE Modifications made: • Replaced font with san serif, Helvetica Medium Sign Type S Unit ID f C b r-o� ta�.r 3 No Roof Access Access Lobby(L), Le�els 1-7 OLD layout,11/2009 1/2"= 1„ � � m W � � �_ � ca '� O N O O Ol '� 4 O O ■ N O ROOF ACCESS ACCESS LOBBY(L), LEVELS 1 -7 NEW layout,12/2009 1/2„_ �„ , �,. ��. ��. Modifications made: • Replaced font with san serif, Helvetica Medium •Tactile letters/Braille is NOT required for this sign type • Message is all CAPS • Color contrast has been revised Sign Type U Interior Stairwell ID � �Cn a � � oa c � c� O O � '1x �. � � '� Restroom ,� ;; .;.�.:�:�.::: OLD layout, 11/2009 1/2„= �„ -n m � � �,. .�',�:� N � O O � � 0 B� RESTROOM .. .. .. .. .. . NEW layout, 12/2009 1/2„= �„ ��� Modifications made: ��•r"'�°M"°�° . Replaced font with san serif, _ � Helvetica Medium • Message is all CAPS • International symbol is a height of 6" Sign Type W Restroom I � � . i ����;,. ��F �. � ����_ . �� � � x �. ��*¢'' � ... �� ��X� ��� } � � � � , ., ��� �, ,� i ��5r ,�� ��^ .# . �• �, "°-� �. �"�, �� .- k . "'°'"�,;� ' .'�,., ,�� �` � � .� °�v � � _ � + ° _ -� _� �, ��, �` � � ��:� *:�� ��° .�� `� � , - � � ����� ,�� ��"� � � a.,� �,u�� �` � ���� ��� �.�'� � �.� �� $��� � � � : � � � � - �--�.. � . g . ..��;;� �_ ; , . i �. ,�' � ':� M� y, ., _�r. � °� I ,,� -��,,,, � �� � � � � � ��� � ����� �,� � �� . �# � �A�P 1 � ��� � �3 # x#3°g � ;��,.3ip � t � ��� �. � $ .. � �� � �.� xy� ,� '4 �' `YP � . � ���j , �,��g � <� � ��� � -7 r-�_ ��. , m _E .�.. - , „� = a - -_ *- t ���� " ��w�� s; � _ � ����m �� ��� ��"� � � .�n � ' ��}�-»- � j!�p � +y � ` ��-�^�� � • ♦m 4 a� y �p= h" p � t . m '� p'._... �� � � r� r rn - 'y^�>'^°� R �, � ��������1 ���� , µ „ u �..��� .� . _ � .. - :,"'"'�—,:._. —- . � ., ,_,��-�r���~�„ , .� . , �� � ��,� �... _` m,� . _� »�,,,,,�..,� : r a i' �cn� ;t,�,�.. � , _ '� , _ ,_ �:� $' a&.�' F � � af ��� .: APPROVED Subject to inspection and Compliarlce to all refevant Adopted Building and Municipal Codes. Changes in Plans MUST be approved. �ate Z 1� /O gy 01�1� code:�3� - � Ti6C� cnrr�...,�. r-_�---�- �° x y �. � � � ffib '� ' �i - u y �.. � £ a�se �. . i , , , ,,< . .. ��,�, A�� � �� � a y; . , � . � J i� w " ' �h Il , �ti� '` � �� �s., �' � ^;� Project Signage Sign Types with Final text/Graphics a � . p � � � o � � JAN 08 ?��� TOWN OF VAIL - D � � � o � � FEB 01 Z01� TOWN taF VAIL I prepared by R Design LLC � . � , �: a� '�if�� I�:�i � � ,! � � 'llrt F .�a����`a+ ,. II a i � i ► + Signage Package Table Of Contents Message Schedule Parking Level P2 ..................................................... M.P2 Parking Level P1 ..................................................... M.P1 Level1 .................................................................... M.1 Level2 .................................................................... M.2 Levels3 &4 ............................................................ M.3 LevelS ................................................................... M.4 Level6 ................................................................... M.5 Levels7 &8 ........................................................... M.6 Location Plans Mall Level (P2) ........................................................ LP.P2 Lobby Level (P1) ..................................................... LP.P1 LevelOne .............................................................. LP.1 LevelTwo .............................................................. LP.2 LevelThree ............................................................ LP.3 LevelFour ............................................................. LP.4 LevelFive .............................................................. LP.5 LevelSix ................................................................ LP.6 LevelSeven ........................................................... LP.7 LevelEight ............................................................. LP.8 Signage Types* Building Identity .............................................. A Freestanding Entrance Sign ............................ B Garage Enter/Exit Clearance Height Bar ......... C Exterior Entrance Sign .................................... D Parking Garage Directional ............................... L Caution Ramp Access ...................................... LL Pedestrian Ramp Access ................................. LLL PrivateParking ................................................ M Reserved Handicap Parking ............................ MM Regulatory Stair ............................................... P Interstitial Spaces ............................................ PP Elevator Lobby Call ......................................... Q Elevator Lobby Evac Map ............................... QQ Suite Room Sign ............................................ R.1 Back of House/ Utility ID .................................. R.2 Back of House/ Large Sign .............................. R.3 Residential Unit ID .......................................... S Private Entry Sign, Freestanding ...................... T Private Entry Sign, Column Mounted ................ TT Interior Stairwell Door ...................................... U Interior Hallway Directionai ...................... ....... V Interior Directional, Large ...................... ....... W Restrooms ...................................................... W PoolRules ....................................................... X Fire Pit Rules .................................................. XX Hot Tub No Smoking ....................................... X)OC Tenant Signage Joint Directory Sign ...................................... Projecting/Hanging/Wall Sign ....................... WindowSign ............................................... AwningSign ................................................ Business Operations Sign ............................ SalesSign ................................................... Entrance Directory, Mall Level ....................... Column Cap Identity ................................... *There are no sign types I, N or O � � Prepared by � R Design LLC AlI dmwings und wnarn ma�enol oppwnng Iurein eorutlmu ariginal and unpu6luhed ao'* of the de.agnerand m¢yrot be duplieaud.uaed ord'urbsed wi�hout wntten co�ert of desigrier. .. E ,.. F .. G .. H ,. J .. K .. Y .. Z ��°VIEWED BY ��� 11 2010 ��l��Builx Colorad� F � �F � � �: � h% ��;� � . ,� �ao; . � , �� �� � . � . : . �_ '-� � ��' � � � � . . i _ �. �. ... , . _„ �._ . i i I �' �� �� � w 1 A Sign Type A: Detai�- Project Identity A.0 Scale: 1/4"=1" � I T �. - � ,� �, i: ; �� � 12'—0" � = - � � N�` %+� . „�1 �w�� ,�.. -- .�,�": General Notes: O Aluminum reverse-pan-channel letters with 4" return. Paint finishetl to match Color#1 Copper with patina finish TBD. With eased edges. QPin-mount to wall. 16'-0"from gratle to center. Typeface is Celestia Antiqua Regular. Artwork will be provided by R Design LLC. \ _ ' . ' R Design LLC 445 S. Saulsbury St., Unit A Lakewood,CO 80226 720-933-3816 craig@rdesignllc.com �zooq R Design LLC Add drautings and wntten nnnteriaE appearing herein wnatitute original and unpublished work of the designer and may n.ot 6e duplicated.used or disdosed withou�t urtitten consent of des4gner. Client Fritzlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 1 Signage Drawn By CR Checked By CM Sheet Issue Date 08.28.07 Revisions 09.25.09 11.20.09 File Name Landmark-SIGN TYPES A-D.ai Scale 1/2"-1'-0„ ry ign Type A =����V Building Identity 1 2�� Quantity: i F� �olo a� � . � • 0 I rn . � 6'—0" � # r .�,' : � �� a �� �' �,„M� � �� �� �°� � �� � �e, '��; � �a` � "�r ��� �� z��" #�t�"' 3,. fi���;��' � �� �� � � � � � � � �,���E�� `�� ` �,a � � . _ `� � � � � l� '�i � ��; ��� � „ � ��'�$ � � �� §� ,M �� ' �� � ,, � .� �;:� � � � � tl� �� � � � �=awu � �.� " �� �_ •° , � ��� �-: �� � �, ' ���� � � � ° � � � � � � < , � � � �� �'`��y.;- p �..°e� , �nsr«�+.� S e� ��, "�'14" � F �• � 4 . � . � ,� . �� ��� . � .. -• ,�� � - � P_� � � �� � � s F< �°� � �a� � �'x � �� , �a� ' ��. >�" , k.,��* �{ k� � � � ��, �s $ � "�� ;�� � � � � ,�p� � '� �`�� '�' � � � ;�; �^�� �� � . r�� � ,+ , . .`. �� �� �;= t� t wr +l, � � � �.! �A.� � ���Y-. „' ; i� .��y �. ,y � n� �p " . $4 �, "ka."�$,� r,�r,� ty E� � *�` y� 'M" ,`�, , i' � i' 1� I,• A 5 .! ���yt • � , + ..y . " z � y��e ',� ♦ 4 < ��' f � ��r,�.x� '` � �.; s .� t:`x X� ,� j t � �... e�'..� � .+ +P �� _ , y . : �r' _ General Notes: Q 9'stone will serve as base for entry signage. Stone by others. Landscaping by others. Q Logo & Logo type to be waterjet cut from 1" copper stock. Letters antl rail to be one singular piece. Fasteners to stone to be concealed from front face. Ground lighting by others. Typeface is Celestia Antiqua Regular. Artwork will be provided by R Design LLC. �.��viEwE� �'� F'�B 11201,� SAFE�uilt. Colo����: , � ' � / R Design LLC 445 S. Saulsbury St., Unit A Lakewood, CO 80226 720-933-3816 craig@rdesignl Ic.com m zooq R Design I.LC All dramtings and written maf�eria6 appearing herein constuute oreginal and unpubdislued work of the designer mnd may not be d.uplicaeed,used ordiscloaed withowt wrtitten con.sent of designer. Client Fritzlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 1 Signage Drawn By CR Checked By CM Sheet Issue Date 08.28.07 Revisions File Name Landmark-SIGN TYPES A-D.ai Sca le 3/4"-1'-0" Sign Type B Freestanding Entrance Sign Quantity: 1 i B.0 4 ^ � � � .'•7 � I ifl , ��..; & , •%`.... + ..< . � .� IWa�r � ., , {�� .... �� Y �: � � 1 nl _L`II L V � �"�1k�����m��A�3���d �'�����,��{i��'�������Il�eqi' � . 1' � �� II�,���`�� ��a �` s""c` h�,s� �, � � , , � �: -<, , ; �. .,,, �,.:_ � �w`: �:,�,`,�R� ,yTM","�:��' P:.�'7i���4 C � _ , �� '� � -^ _. , ��.�t�`�"" t� ,�� � 5 General Notes: OSign appears at entrance outside of the garage. Overheatl sign panel copy is reflective white vinyl. Overhead sign panel is atached to concrete with appropriate adhesive and/or mechanical fastener(not shown). Typeface is Celestia Antiqua. Artwork will be provitled by R Design LLC. ::�.��:r�/I EV�r ��B 1 ����� \ _ ' . / R Design LLC 445 S. Saulsbury St., Unit A Lakewood, CO 80226 720-933-3816 craig@rdesignl Ic,com �2ooq R Design LLC Atl drawings and wntten matenal appeanng berein conatumte original and unpublished work of the d esigner o,nd may not be duplicaeed,used or discloaed without written consemt of designer. Client Fritzlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 1 Signage Drawn By CR Checked By CM Sheet Issue Date 08.28.07 Revisions 08.14.08 03.23.09 File Name Landmark-SIGN TYPES A-D.ai Sca le v2°- i�-o„ Sign Type C Garage Entance Sign and Clearance Height Sign Quantity: 1 C.0 0 � ■ �d �� � -,.__ r � ,:: ;>�;-�: : r•;: „ � a,,; ::d,. ; �— ���– �,��— sioE wnv General Notes: O Logotype is cut from 1"thick acrylic substrate with eased edges. Paintetl with Matthews Acrylic Polyurethane (MAP) BLACK. Letters mounted to 3" raceway concealing White LED lights. Concealed lighting is to wash beam. Raceway mounts tlirectly to beam. Raceway trimmed in wood veneer to match beam. Typeface is Celestia Antiqua Regular. Artwork will be provided by R Design LLC. i p ?x� ,g� �t��i,i�ise�: . <a��� �(i , � ' � / R Design LLC 445 S. Saulsbury St., Unit A Lakewood,CO 80226 720-933-3816 craig@rdesignllc.com �2ooq R Design LLC Adb dra.uings and written materia!appearing herein conatuute originad and unpnbliahed work of the designer and maynot be dupdica�ted,used ordisclosed v;ithout written consemt of designer. Client Fritzlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 1 Signage Drawn By CR Checked By CM Sheet Issue Date 08.28.07 Revisions File Name Landmark-SIGN TYPES A-D.ai Scale 1/2"-1'-0" Sign Type D Exterior Entrance Sign Quantity: 1 D.0 i_�,_� � i , �! _.___.____; ;, __._ ., ----��= I:_ 1'_..._....__ _. ___....... ., -�' i:�, �_I i.._ _. . ._...._. __ . __.._. __��. __ .. �`. f; _ _ _..__ .. _.; �I _� _ �'� � � � � i :� ; , ll ;l ,, ;. i� :i ` � �` � { _ __ �?AFt� � r -�-- _ -� =I �I ; EI7Af� .... _� :' q _ � _ __.. _ _ .- _.. . . , ... '.EDAR :: ( , ____._ _ �_ ttA�vT 5T^'k»:: -.:,,_;r _ __ _. - _...� ��:�t�� �"r�'�� � _.._ ..� .__ _. _ � _ ----�` _ _ �l--F --------.,._ �___. ._._._�I,,,,,,,,,i !!�.. i �::::::�.�,. i......_.... _..____. ___, __.... I � f ,, � j i :� _ � i� � _ __.. -=;f �,_ _ -� _ , _,� ,r � _�_�, , �. __'� j � � � l �� � 2EJ ' li_ ��. ' _. .^._::.:�r .....�' ��. ... _ ') : .�i - . .,� ..._�...:.,I .. . . '' . ' ....._.___.�� .. ........._ . . ....._........... _ < < _ !� _ __..__.____ ; _ _ ___. __ , i ;'I _,��",. .__::_ _., _:_..: .. �: � . .. _ _......._ __,,__,__ :[ - , ... � __ General Notes: O Logotype is cut from 1"thick acrylic substrate with eased edges. Painted with Matthews Acrylic Polyurethane (MAP) BLACK. Letters pin-mountetl to panel above doorway. Typeface is Celestia Antiqua Regular. Artwork will be provitled by R Design LLC. . � ' � � R Design LLC 445 S. Saulsbury St., Unit A Lakewood, CO 80226 720-933-3816 craig@rdesignl Ic.com m 2ooq R Design LLC Ald drawings and writcen materia!appearing hereirt conettit�ue original arvd un.pu.bdished work of the designer and nnaynot be dupdicated,used or discdosed without written consent of dasigner. Client Fritzlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 1 Signage Drawn By CR Checked By CM Sheet Issue Date 08.28.07 Revisions File Name Landmark-SIGN TYPES A-D.ai Sca le 3/4"- 1'—0" Sign Type D E�cterior Mall Entrance Sign . "� Location:Pi-73-D D.2 � � r ■ ..� r �E�,d��WED BY �6B 11 2010 w���.�g�i�� �olorad� To meet clearance height requirements This space MUST NOT exceed 3" � 3" ' � � � N� CC N I � 8'-0" , 3 T PARK 4 I'I�II��,il��;��; � fi k A,s �°` "�. �� i �s�� t wia' Front and Back View �<, � 6 5J � Side View � General Notes: O .25"substrate two-sided panel painted with MAP satin finish paint. Q Color#1 Copper TBD Q Color#2 Taupe TBD O Message antl graphics are applied 3M vinyl: •"Exit"and arrow are white •"Park"and arrow are black Q 1"diameter aluminum tube with .125"wide x 1" deep notch at bottom to fit over sign panel and to conceal wire loop and attachment at sign. Q Wire rope attached to ceiling with appropriate mechanical fastener(not shown). Typeface is Celestia Antiqua. Artwork supplied by R Design LLC. FiEVIEW�D �� RP`r., 1 R Design LLC 445 S. Saulsbury St., Unit A Lakewood,CO 80226 720-933-3816 craig@rdesignllc.com �aooq R Desigo LLC Ald drawings and written nroateria!appearing herein.canstitiue original¢nd un.published u�ork of the designer and may not be duplica�ted,used or disclosed without written consene of�d�esignzr. Client Fritrlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 1 Signage Drawn By CR CheCked By CM Sheet Issue Date 07.13.07 Revisions 08.14.08 File Name Sign Types L LL LLL M MM N O.ai Stale t"-1'-0" Sign rype L Parking Directional Sign n�a�t�y:2 L.0 0 N �o.� SINGLE LANE RAMP PROCEED ON GREEN LIGHT O N LY � � 3/32" i General Notes: 1/32"thick aluminum with first surface graphics and copy Q Paint to match Safety Yellow, Reflective Q First surface Messages and graphics are applied 3M vinyl Black Install flush with wall. Artwork supplied by R Design LLC. .l�l�� ',:, ; C ` R Design LLC 445 S. Saulsbury St., Unit A Lakewood, CO 80226 720-933-3816 craig@rdesignllc.com �zooq R Design LLC AII drawings and written material appearin.g herein constitute original and unpublislued w�ork of the designer and may not be diipdicated,iesed or disedosed without written cunsent of designer. Client Fritzlen Pierce Architects 1650 E.Vail Valley Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 2 Signage Drawn By CR Checked By CM Sheet Issue Date 10.10.09 Revisions File Name Sign Types L LL LLL M MM N O.ai Scale 1/4"=1„ Sign Type LL Caution Automobile Ramp Access Sign Quantity:2 LL 0 N 13.5" • PEDESTRIAN ACCESS • PEDESTRIAN ACCESS 3/32" General Notes: 1/32"thick aluminum with first surface graphics and copy Q Paint to match Safery White, Reflective Q First surface Messages and graphics are applied 3M vinyl Black Install flush with wall. Artwork supplied by R Design LLC. : ,���f„3 ` � � __�\ R Design LLC 445 S. Saulsbury St., Unit A Lakewood, CO 80226 720-933-3816 craig@rdesignllc,com �aooq R Design LLC All drautin.qs and written material appearing herein constitute original and unyublished work of the dzsdgner and m.ay not be duylimted,used or disodosed without written consent of designer. Client Fritzlen Pierce Architects 1650 E.Vail Valiey Drive,#C-1 Vail,Colorado 81657 970-476-6342 970-476-4901 fx Project The Landmark Phase 2 Signage Drawn By CR Checked By CM Sheet Issue Date 10.10.09 Revisions File Name Sign Types L LL LLL M MM N O.ai Scale 1/4"=1" Sign Type LL Pedestrian Ramp Access Sign Quantity:2 LL 10 -28 -2010 Inspection Request Reporting Page 1 5:14 Dm Vail, GO - City Of Requested Inspect Date: Assigned To: Inspection Type: Inspection Area: Site Address: Frida ,Oc PLAN Otober 29, 2010 N SFB 612 W LIONSHEAD CR VAIL LANDMARK CONDOS A/P /D Information Activity: B08 -0010 Type: MF BUILD Const Type: Occancy: Owner: MARY SULLIVAN JOSEPH TRUST - SULLIVAN Contractor: ALTER DEIGN BUILDERS LLC Description: Sub Type: MFAM Use: Status: ISSUED Insp Area: SFB Requested Inspectionts Item: 537 PLAN -FINAL C/O Requested Time: 08:15 AM Requestor: I Phone: Comments: 389 -2881 4;; ° Assigned To: BGIBSON Entered By: MHAEBERLE K Action: Time Exp: Comment: As-built calculations require prior o inal C/O inspection approval. See other correction under TCO inspection. OJ Inspection History Item: 500 PW- Backfill Inspection Item: 501 PW- Access /Staging /Erosion Item: 502 PW -Rough Driveway Grade Item: 503 PW -Finai Driveway Grade Item: 10 BLDG - FOOTING Item: 20 BLDG - Foundation /Steel Item: 520 PLAWILC Site Plan ** Approved ** 11/25/09 Inspector: bgibson Action: AP APPROVED Comment: Item: 30 BLDG - Framing Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail Item: 70 BLDG -Misc. Item: 90 BLDG -Final ** Approved ** 10/28/10 Inspector: mdenney Action: AP APPROVED Comment: building complete. Item: 530 BLDG -Temp. C/O ** Approved ** 11/20/09 Inspector: NSC Action: DN DENIED Comment: T.C.O. walkthrough. 1.Need to call in Building finals for what will be occupied. 2.Need to provide information regaurding correction Matt denney issued on 11/11/09. 3. Elevator Cretification will be performed on 12/2/09. 4.fire department sighn off 5.Need sighn package submitted for review. 6.Firecau penetrations and door jam in Generator Room. 7.Firecaulking penetrations in Mech room. 8.Add door stop to mech room door remove const. equipment. 9.Replace monocoat where missing in mech room. REPT131 Run Id: 12101 Phone: 970 - 479 -5330 (LOCAL PHON Continued: Comment: 10. Need to tog Door at Mech room. 11.one half and hour door frame with a 3hr door needs to be a 3hr assembly per IBC. 12.check on 3hr requirment of door frame in garage. 13.get letter from mike mcgee for stair pressureization. 14.seal penetrations into exsiting grage. 15.firecaulk penetrations in trash room. 16.apply handrail in stair #1 on 5th floor. 17.a ach handrail in stair 1 at 6th floor. 18.cover late on open J -box in elevator vestibule. 19.slow down doors into vestibule and stairs. 20. Need Door tog at elevator vestibule doors. 21.firecaulk in penetrations elev. room 22.LVL 2 vestibule door is to slow and does not latch. 23.seal penetrations at vestibule. 24. provide exit sighnage off of pool deck into lobby. 25.Check on trash room door rating 11/30/09 Comment: Inspector: mdenney Action: PA PARTIAL APPROVAL TCO for Core /Shell of existing building - Excludes 5th 6th and 7th floors. 04/15/10 Comment: Inspector: mdenneyy Action: PA PARTIAL APPROVAL 51, 52, 53, 54, 56 04/27/10 Comment: units 55, Inspector: mdenney Action: PA PARTIAL APPROVAL Units 100/200, 300, 400 and 57A/57B. Item: 531 FIRE -TEMP. C/O 11/20/09 Inspector: mcgee Action: DN DENIED Comment: TCO Denied Original list in pdf at fdshared/ prevention/ plancheck /landmark/tcoinsp112009. Label Electrical Room door on Garage side. Open AC in Boiler room ceiling. Excessive trash in boiler room. Label all doors from Garage into building. Open AC in commercial laundry. Damaged AC conduit in Garage Upper level at Col 4 and 3. Remove drops from AC electrical temp at Mall Level south door. Install ceiling in Mall level s13rinkler valve room. No EM I No EM I No EMI Clear trr from exterior perimeter. have open AC and sprinklers are obstructed. rage to front desk (Billy's, guest laundry, etc.). Item: 532 PW -TEMP. C/O ** Approved ** 11/18/09 Inspector: Is Action: AP APPROVED Comment: Item: 533 PLAN -TEMP. C/O ** Approved ** 11/25/09 Inspector: bgibson Action: AP APPROVED Comment: Prior to CO: EHU's must be ready for occupancy, condo plat must be updated, north side landscaping must be inspected (currently under snow), northeast corner mechanical vent must be screened, south side utility transformers must be painted tan to match the building north elevation window shutter installation must be completed, north side ground level deck rail installation must be completed. Item: 537 PLAN -FINAL C/O 03/10/10 Inspector: bgibson Action: DN DENIED Comment: As Built" GRFA calculations required prior to final C/O inspection approval. See other correction Item: 538 FIRE -FINAL C/O ' ** Approved ** 10/08/10 Inspector: McGee Action: PA PARTIAL APPROVAL Comment: Final Approval waiting on NWCOGinspection of emergency power transfer switch and function test for elevators. 10/14/10 Inspector: McGee Action: AP APPROVED Comment: Item: 539 PW -FINAL C/O ** Approved ** 10/28/10 Inspector: tk Action: AP APPROVED Comment: Item: 540 BLDG -Final C/O REPT131 Run Id: 12101