HomeMy WebLinkAboutB09-0087 -
B09-0087: Entries for Item:90 - BLDG-Final 16:27 09/19/2013
Action Comments By Date Unique_
Ke
CR TCO OKAY, ITEMS TO BE COMPELTE FOR CG 12/22/2009 A000130
FINAL CO: 77g
1)SHOWER GLASS TO BE INSTALLED
FOR FINAL
2)GUARD HEIGHT AT TOP LANDING TO
BE 42"MIN.
3 FINAL APPROVAL FROM FIRE DEPT.
AP JRM 01/19/2012 A000148
657
Total Rows:2
Page 1
NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
:
�nwxo�vn�•
Town of Vail, Community Development, 75 South Frontage Road,Vail,Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT MF BUILD PERMIT Permit #: B09-0087
Project #: PRJ09-0139
Job Address: 610 W LIONSHEAD CIR VAIL Status. . : ISSUED
Location......: UNIT 23, LANDMARK Applied. . : 05/05/2009
Parcel No....: 210106307023 Issued...: 07/22/2009
Expires. ..: 01/18/2010
OWNER BROWNING,MELVIN L. &PAT S.05/05/2009
108 VIA MIMOSA
SAN CLEMENTE
CA 92672
APPLICANT ALTER DESIGN BUILDERS LLC 05/05/2009 Phone:476-4033
5500 W. HOWARD ST.
SKOKIE
IL 60077
License:352-A
CONTRACTOR ALTER DESIGN BUILDERS LLC 05/05/2009 Phone:476-4033
5500 W. HOWARD ST.
SKOKIE
IL 60077
License:352-A
Description:
INTERIOR REMODEL&ADDITION(UNIT 23)
Occupancy: R-2 Valuation: $46,300.00
Type Construction:IllA Total Sq Ft Added: 152
...........................................»..................t.......,......,,,. FEE SUMMARY ......,,....,,,.......,....,.»...............,,....,,,.,,,,..,..,..,,,,....,.....
Building Permit Fee---> $613.45 Will Cal Fee------------------> $4.00 Total Calculated Fees-------> $1,894.19
Plan Check---------------> $398.74 Use Tax Fee---------------------> $726.00 Additional Fees---------------> $0.00
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES---------> 51,894.19
Investigation---------------> $0.00 Recreation Fee----------------> $152.00
Payments-------------------------> 51,894.19
Total Calculated Fees--------> $1,894.19 BALANCE DUE-------- -----> a0.00
f#�*f`f`1r1r1r!#!f'f'f`RR V friRfYtfr�y'Y4�tfYeft**fr�lrfrf'!##}tfff't41'fry'R+FRfikfiFY�FO'kftt*�F4ff`*//#Yr/t1'tfktf�tfff'fttLfYrtYMYiFYy'ftYftt*tlf4tff`!►lrktf'4f'�fY�iktrtFfy'w'ff4fflw'YA*f�fff#tf`*ttfitf#Rf'�f'frRftR►�fMt'Z�kff�Yf
DECLARATIONS
I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information
as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure
according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION S L B DE TY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 9T0.479.2149 OR AT OUR OFFICE FROM
8:00 M=4:00 P
`�� .��- U9
, ign re Ow er or Co�actor ' Date �^
f
Print Name
bld_a lt_construction�erm it_041908
w�:�:+rww�::♦t++r►rxrwwwwrrr�*x+w,eWtx:tt:�:►r,t+xx�ww:::�i:�irte+xx�x�►�t��+t��:r�xw�►wwe�wrttt:i*�fx►xwxww�t:t:h�e�xxe►xwt►r�:►rx:�:r�����rxri.�:r:►iit�►x::rr�rrwwxwx�r�twr��x�xw»i
APPROVALS
Permit#: B09-0087 as of 07-22-2009 Status: ISSUED
rrx+.+��x�t:rr��r+��r►:xrr:��r,riw».wwiiirwet,e�wx�+.t�►�x»errrry�rx�+�r:�wwwww::����+�rw,vvx���x�::::wHw��w�w����:�:�w::r��e��xwt+��.rts.:�rts.w�x�,e��►�t���+�r,ti.wrw�wxr��,e:et�e��xiri+„'�a
Item: 05100 BUILDING DEPARTMENT
05/14/2009 MH Action: CR
F:\CDev\CHRIS\PERMIT:COMMENTS\609-0094\B09-0075-0096.DOC
07/20/2009 martin Action: AP
Item: 05400 PLANNING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
05/11/2009 drhoades Action: AP Changes to any
unit that requires modification of the sprinkler system
shall require an individual permit. These changes may be
reflected on a master set of stamped drawings and shall
include hydraulic calcualtions as well as being stamped
by the Fire Protection Engineer of record.
The fees shall be such that only one review fee shall be
assessed for the master set of stamped plans, however,
individual unit permits will then be assessed permit fees
based on an hourly rate(3 hours minimum).
**One permit shall not be issued for all units, as this
would prohibit finaling the permit until all units had
been completed.'*
r��r���x�t+�+.���:���;r::�ixr:�:triw:::�e,r�r��x+s:vrv,vnrrr��t�+irwx�,rs�:���xw��:��:::wrx�wt:����r�w:�:ii:::��w,res:,errr►werr�x►rt��i�,r��r���x:�►�:xtw�::iiitt�::re::i��er�iix�ix:rxtxrr�e
See the Conditions section of this Document for any that may apply.
bld_alt_construction�ermit 041908
1f�ZfYwwwNft��fYfw�f*fftf��lffXYnt4t!#�f�ffiff�Y►Www*�ff�fff►��ttlwwft�►t►/fffflf���f�Y1ttRNtw4ww#lffttfYffRfflww��1R*ffkfRf!llfYftwtY►wf�##�4AfftH��YffftffwHwt►**kf�tt�#4R4�Hff
CONDITIONS OF APPROVAL
Permit#: B09-0087 as of 07-22-2009 Status: ISSUED
♦�x►r►:wrre»�r�n.�:��xirirr,e��.xwwsn.wx:e:wrww,rwrn.�w�w:ww:r:ieiwe�w,ewwwsn.:w:�:iiiii+�xwwwrewr.���ix�t+trrexx►wr�xtt►trtt���w�xe,ewer��xwt:�:rt�t:i++�xexrr�vraw��xitit::::::irrrr�xwwex�++�
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.):ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond:40
(BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. �
Cond: CON0010698 '
Changes to any unit that requires modification of the
sprinkler system shall require an individual permit. These
changes may be reflected on a master set of stamped
drawings and shall include hydraulic calcualtions as well
as being stamped by the Fire Protection Engineer of
record.
The fees shall be such that only one review fee
shall be assessed for the master set of stamped plans,
however, individual unit permits will then be assessed
permit fees based on an hourly rate(3 hours minimum).
**One permit shall not be issued for all units, as this
would prohibit finaling the permit until all units had been
completed."
bld alt_construction�ermit 041908
*�#***#*##*******####*#****#***#**F***F**#*##*****####*#***#*#*#***###�***##**###**########*
TOWN OF VAIL, COLORADO Statement
*********s*****��:***************r�*********�*****�***************�***��****************�***
Statement Number: R090000890 Amount: $1, 894.19 07/22/200902:55 PM
Payment Method: Check Init: JLE
Notation: 41857 ALTER
DESIGN BUILDERS
-----------------------------------------------------------------------------
Permit No: B09-0087 Type: ADD/ALT MF BUILD PERMIT
Parcel No: 2101-063-0702-3
Site Address: 610 W LIONSHEAD CIR VAIL
Location: UNIT 23, LANDMARK
Total Fees: $1, 894.19
This Payment: $1,894.19 Total ALL Pmts: $1, 894.19
Balance: $0.00
*********�*****�*�******�****************�***********�***********r******�*******************
ACCOUNT 1TEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 613.45
PF 00100003112300 PLF1N CHECK FEES 398.74
RF 11100003112700 RECREATION FEES 152.00
UT 11000003106000 USE TAX 4$ 726.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
i"� !-�' ac„e �ce�#�t3 '°tS a ia e 2 -
l •��• � � x �'��, Rm �, � �: � ,}� s�+'= i�r' �a r z �,t.v.�„ s .
,,
�� �,� b �- �u} y e ,�'�� � ..,�15d j qfp , . x"w�,� 'S �. ��ag'� �`r`S -r �" � �. `� �t,;
k� � +�,���� x���; � ,k���,�f �'��a��}'�r § � �€�^� 6 :4�'�"��`���"f,��'���`���5��������� �`� ���� >;
a ���,� , � � ° ,� �"" r
t
��� �� � .��,� �^ „� �_ �'�' � � � � � � ,�11@�'.
�� �� '.���-� '�'�'�-.D�� � , : '�5 Se�uth F��uttag�"
t � ° # �"
' �.,, z �; " .. ��.a ��� �, ,�; *• �
; ,'��' ,
.ti. -�•�,...,. 5 . .:, � �. + � ;, .� 'c . -
4 ".;� i �, .��� y , ��i
'� �� � �"�g 4� a ��' � s t, :. °'=`
�i..„f 4 '•�� y,�'��",�' a ,� • r. .
, . ,_
�6 -� . '��y��� �a r.�, �.S p
� - . .��# , � �� �d
a ! ' Y'
BUILDING PERMIT APPLICATION
Separate permits are required for electrical, plumbing, mechanical,fireplace, etc.
Project Str+eet Address: Office Use: '�
610 West Lionshead Circle Unit 23 Project#: �
(Number) (Street) (Suibe#) 4�
DRB#:
Building/Complex Name: The Landmark Condominiums guilding Permit#: ��w v
_. . . _ _ _ Lot#:�Block#� Subdivision: �
Contractor Information:
Company: Alter Design Builders
Company Address: 5500 W. Howard St. Detailed Description of Work: Interior RenO��titNt of
�;ty: Skokie State: �� Zip: 60077 West Tower Unit 23 with added bath&flex space.
Contad Name: Howard Olsen
Contact Phone: 970 476-4033
E-Mail h01S@��81t2�9�0Up.COf11 (use additional sheet if necessary)
Town of ail ontractor Registration No.: 352-A
Work Class: _ _
/ New( ) Addition( ) Remodel(�) Repair( ) Other( )
- Worlc Type
Co ctor Signature(required) Interior(�) Exterior O Both O
Property Information Type of Building:
Parcel#: 210106307023 Sin le-Famil Du lex
g y( ) p ( ) Multi-Family(�)
(For parcel�,contact Eagle Courriy Assessors Office at 970-328-8640 or Commercial
visit www.eaglecouty.us/patie) ( ) Other( )
Tenant Name: Does a Fire Alarm Exist? Yes( �) No O
Owner Name: Melvin Browning Monitored Alarm? Yes(�) No O
Does a Sprinkler System Exist? Yes(� ) No O
IN F�.^•GESS
Valuations(Labor&Material)) #8 Type of Existing Fireplaces: Gas Appliances 1
Building: $ $30,000.00 Gas Log Wood/Pellet Wood Buming
Plumbing: $ $6,000.00 #&Type of Proposed Fireplaces:Gas Appliances 1
Gas Log Wood/Pellet Wood Buming
Electrical: $ $10,300.00
Mechanical: $ $0.00
Date Recelved:
Total: g $46,300.00 � � � � \!'/ �
D
APR 3 0 2009
TOWN OF VAIL
� -.� �
�'�w� of Vail
VAR Flijp
� ��� OPY
• Vail Fire Department
�
Asbestos Testing �Abatement Requirements
Asbestos testing and abatement protects workers,homeowners,neighbors and emergency services responders from
exposure to haRnful asbestos.The Town of Vail asbestos abatement program is in addition to the State of Colorado's
regulations.It is your responsibility to be in compliance with the State.Please contact the State directly for their
requirements at the contact info listed below.
When is asbestos testinq required?
ANY building projects disturbing more than these threshold levels of building materials require
asbestos testing:
One-and Two-Family Dwellings: 30 square feet
All Others: 160 square feet
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified
and Vail-registered abatement contractor.An asbestos abatement permit must be approved,
and the clearance►etter must be submitted to the Town of Vail before the building permit will be
issued.
Project Checklist
My project falls into the category checked below:
❑ WII not disturb more than the threshold limits identified above
B( Tested negative, or at 1%or below(2 copies of test results included)
❑ Tested positive at more than 1%, requires abatement(2 copies of test results
included
Tips 8 Facts:
• Even recent construction projects may indude asbestos-containing materials,so buildings of�age
require testing.
• The"1989 Ban"on asbestos-containing materials is commonly misunderstood."In fact,in 1991 the U.S.
Fifth Circuit Court of Appeals vacated much of the so-called"Asbestos Ban and PhaseouP'rule and
remanded it to the EPA.Thus,much of the original 1989 EPA ban on the U.S.manufacturing,importation,
processing,or distribution in commerce of many asbestos-containing produd categories was set aside and
did not take effect."-CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail,
Community Development, 75 S Frontage Rd,Vail, CO, 81657.
Town of Vail Contact: State of Colorado Contact:
David Rhoades, Fire Inspector Colorado Department of Public Health
Vail Fire Department and Environment
75 S Frontage Rd Asbestos Compliance Assistance Group
drhoades@vailgov.com 303-692-3158
970-477-3454 asbestos@state.co.us
www.vailgov.com www.cd he.state. . � � � n �n �
Duv
APR 3 0 2009
��j(�_��r � TOWN OF VAIL
��.
�
�� � � .
� �'
��'+��n of Vaii
- �������
� a: �� ��Pl(
A & D Asbestos Testing and Consulting
John R. Peterman
:��x���::��*�:��x
P.O. Box 1230 Clifton,CO. 81520-1230
. � Cell 970-270-3689 Home Phone 970-4�fi4�-5265
INSPECTION REFORT PREPARED FQR:
Destination Resorts
610 W. LionsHead Circle � �
Vail, CO. 81657 �
LOCATION:
The LandMark
610 W. LionsHead Circle
Va'il,CO. 81657 '
REPORT PREPARED BY: .
John R.Peterman
Inspector Manager .
Certificate No. 6601 .
� (� � � � � � '
D
- APR 3 0 2009
TOWN OF VAIL
�
,
2
i
� � i
�Q°I--OQg� ;
I
`
.' �� .
�
A & D Asbestos Testi.ng and Consulting
John R. Peterman
Asbestos Testing,Froject Design, and Consulting
INTRODUC'I'ION:
On August 22nd, 2006,an inspection/survey was conducted and 20
bulk samples were collected from the:
The LandMark , .
610�W.LionsHead Circle
Vail,CO. 81657
The purpose of the inspection/survey was to locate and sample
suspected asbestos containing materials that might be present in the
Residence ttiat is planned for demolition.
The inspection was made, and the samples were collected by 3ohn R.
Petennzan, an A.H,E.R.A. and State of Colorado Certified Asbestos
Inspector. Great care was taken during the inspection and sampling to be as
accurate as possible. It should be noted that minimal damage v�,as done to
the existing building structures during the inspectioa so there is no
documentation for unseen conditions or stored items.
All samples were analyzed by DCM Science Lab in Wheatridge, CO.
This laboratory is deemed "ProficienY'in the E.P.A.Quality Assurance (QA)
program for the determination of asbestos in bulk materials, and is
: accredited by the American Hygiene Association (AHA).
SAMPLING PROTOC4L:
A random sampling scheme was used to sample the suspect materials that
were discovered. If during any future demolition or renovation work,
susPect material is d.iscovered that hasn't been sampled and would be
ciisturbed, work should be halted until t1�e materiai has beea tested.
3 .
. -
y f .
G .
A & D Asbestos Testing and Consulting
John R. Peterman
AsbestosTestircg, Project Design, and Consulting
The LandMark
610 W. LionsHead Circle
Vail, CO. 81657
BUII,DING DESCRIPTION: �
The LandMark consists of two multi-story bnildings with a connecting �
underground parking garage. The Tower Building is the east buiiding with
seven stories, and a gara.ge level. The Town House building has single level
units on the first floor, and 1oft units on the tip levels. This survey covers �
the inside of the buildings. The interior walls are covered in sheetrock with
a light texture, and wood paneling. Note: In some arears a texture has been
trowel,ed over the origi»al finisli. The ceilings are sheetrock with a heavy
spray-on texture, and twin tee concrete with the same spray-on texture. 'The
basement area has suspended ceiling tiles throughout,and most have been
replaced not long ago. The older tiles were tested in the Billy's Grill area.
The floors are covered with carpet, ceramic tiles, and sheet vinyl flooring.
The sheet vinyl was not tested in this survey. The heating is provided by
baseboard heating, and fu�eplaces. No suspect thermal system insulation was
observed during this inspection, The garage ceiling had a spray-on fire
proofing that was mostly removed prior to this inspection.
CONCLUSIONS AND RECOMMENDATIONS:
Presumed Asbestos containing materials,present in the buildings, are as
follows:
1. Spray-on ceiling textu�e .
2. Sheet vinyl flooring
3_ Exterior siding board
4
`
�'
.
A & D Asbestos Testing and Con�ulting .
John R. Peterman
AsbestosTesting, Project Design, and Consulting -
Laboratory Anatysis of the bnik samples collected during tlus inspection
indicate that Asbestos was detected in all of the composite sheetrock
samples. However, the Asbestos content is less than the Regulatory Limit
(Greater than 1%Asbestos). The.Asbestos content of the samples was
verified by the Required Point Count Analysis. The samples collected were
taken from the originai areas of the buildings. If conditions are encountered
that are not the original construction, additional testing or documentation
may be required. If the renovation work will impact on the three presumed
Asbestos coataining materials listed, the P.A.C.M. must be handled as per
Colo. Reg.#8 prior to disturbance of the materials.
s
Dete: August ??, 2006
Location: The LandMark, 61Q W. LlonaHead Ctrcle, Vetl, CO. 81657
SAMPLE LOCATIONS
1
Z
3
4
5
6
7
8
9
10
11
12
13
14
�s
16
17
18
19
20
SAMPLE NUMBER AREA SAMPLE REMOVED FROM
LM-B
LM.-8
LM•B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-8
LM-B
LM•B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
001
002
003
004
005
006
007
008
009
010
011
012
013
014
015
Oi6
017
018
019
020
Qarage Csiling 8y Lobby Entrance
Qanps Cellin�By S.Exit Door
Qarege Cetling By Entry Gate
Lobby Aros Bllly's Qrill
Lobby Area Billy's Cir(U
Lobby Area Bllly's Grlll
Tower�i705 W.Bedroom Closet
Tower 1k601 E.Bedroom Closet
Tower#504 Upstsirs W.Bedroom Closet
Tower�402 E.Bedroom Cloaet
Tower#i305 W.Bsdroom Closet
Towsr�203 E.Bedroom Closet
Towsr�101 W.B�droom Closet
Towar�i13 W.Bsdroom Closet
Towsr#27 Upstairs N.Bsdroom Closet
Towsr�t11 Ht�liway Storags Closet
Tower�f25 Upatsirs S.Bsdroom Cioset
Tower#18 Maln Floor Bsdroom Ciosst
Tower�2 E.Bodroom Closet
Towsr�15 Hallway Cioset by Kitchen
DE8CRIPTION
Spray-on Finproffing
Sprayon Firoprotiing
Spray-on Flreprotfing
Csiling Tile
Ceiltng Ttle
Celling Tlle
Compostts Sheetrocic w/l.t.Texture
Composit�Shsstrock w/Lt.Texturs
Composhe Sheetrock w/L�Tsxturo
Compoaite Shestrock w/Lt.Tsxture
Composits ShNtrock w/LL Texture
Compatite Sheetrock w/Lt Texture
Corr�posite Sheetrock w/Lt.Texture
Composite Shsstrock w/LL Texture
Composits ShesVock w/Lt Taxture
Composite Sheetrock w/Lt.Texture
Composite Shestrock w/Lt.Texturo
Composite Sheetrock w/Lt.Texture
Composits Shsstrock w/l.t.Texturo
Composite Shset�ock w/L�Texture
FRIABLE
YES
YES
YES
YES
YES
YE3
NO
NO
NO
NO
NO
NO
NO
NO
NO•
NO
NO
NO
NO
NO
Date: August??,2006
Location: The LandMark, 610 W. LionsHead Circle, Vatl, CO. 81657
SAMPLE RESULTS:
1
2
3
4
b
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
KEY:
$AMPLE NUMBER DESCRIPTION
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM•B
LM-8
LM-B
LM-B
LM-8
LM-B
LM-B
LM-B
LM-B
LM-B
LM- B
LM-8
LM-B
LM-B
001
002
003
004
005
006
007
008
009
010
011
012
093
014
o�s
016
017
018
019
OZO
3prsy-on FtroproHing
3pray-on Firoprofitng
Spray-on Fireprofting
CeUing Ttle
CetOn9 Tile
Cetlin�Ttie
Composite Shsetrock w/Lt.Texture
Composita Sheetrock w/Lt Texture
Composlt�Shsetrock w/Lt Texturo
Composite Shsstroak w/Lt.Texture
Composits Shsetrock w/Lt Texturo
Composite Sheetrock w/L�Textun
Composite Sheetrock w/L��Texturo
Compoaite Shestrock w/Lk Texture-
Composite Shestrock w/1..�Texturo
Composite Shvetrock w/Lt.Texture
ComposRe Shaetrock w/Lt.Texturo
Compos(te Sheetrock w/Lt Texture
Composite Sheetrock w/L�T�xture
Composlts Shestrock w/�t.Texture
CHRY-Chrysotlle
NAD-No Asbestos hetected
PC-Point Count Anelyais
ASBESTOS TYPE
NAD
NAD
NAD
NAD
NAD
NAD
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRYJPC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRYIPC
�
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.02
0.01
0.01
O.QZ
0.01
0.02
0.01
0.02
0.02
0.02
0.01
0.02
0.04
_. _ �I
nat.: au9ust ��, zoos
Location: The LendMark� 610 W. LlonsHead Circle, Vail, CO. Si 657
POTENTIAL FOR DISTURBANCE
1
2
3
4
6
6
7
8
9
10
i1
12
13
14
16
16
17
18
19
20
Sample Number Aaceasibllity
yes/r�o
LM-B
LM-B
I.M-B
LM•B
LM-B
LM-B
LM-8
LM-8
UN-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-8
LM-B
LM-B
KEY:
001
002
003
004
OOS
006
007
008
009
010
011
012
013
014
Of8
016
017
018
019
020
YES
YES
YES
YBS
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
1�E8
YES
MOD-Moderate
Pote�tial
contact
LOW
LOW
�ow
MOD
MOD
MOD
HIGiH
FiIGFI
HIQH
HIGH
HIGH
HlQH
HIQH
HIQH
HIGH
HICiH
HIGH
HIGH
tiIGH
HIGH
Inilusnce
vlbration
LOW
LOW
LOW
LOW
LOW
I.OW
LOW
LOW
�OW
�ow
�.ow
LOW
lOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
Potentisl
air erosion
LOW
LOW
LOW
�ow
LOW
LOW
LOW
�.dw
LOW
�ow
LOW
�ow
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
Located In Plenum
yss/no
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
Dats: August ??, 2006
Locatton: The LandMark, 610 W. LlonsHead Ctrcle, Vail, CO. 81657
SUSPECT MATE�tIA,L CONDITIONS
SAMPLE NUMBER TYPE OF SUSPECT OVERALL CONDITION DAMAGED 96 TYPE OF DAMA�3E
MATERIAL
1 LM-8 001 SUR POOR
2 LM-B 002 SUR POOR
3 LM-8 003 SUR POOR
4 LM-B 004 MISC QOOD
5 LM-B 005 MISC QOOD
6 LM-B 006 MISC QOOD
7 LM-B 007 8UR GOOD
8 LM-B 008 SUA GOOD
9 LM-B 009 8UR QOOD
10 LM-B 010 � SUR GOOD
11 LM-B 011 SUR QOOD
12 LM-B 012 SUR � POOR
13 LM-B 013 SUR POOR
14 LM-B 014 SUR POOR
15 LM-8 01S SUR GOOD
18 LM-8 016 SUR QOOD
17 LM-B 017 SUR GOOD
18 LM-8 018 SUR . QOOD
19 LM-8 019 8UR �OOD
20 LM-B 020 SUR GOOD
KEY:
SUR•Surfecing
MISC-Mtscellaneous
PHYS-Physicai
YES
YES
YES
NO
NO
NO
NO
NO
NQ
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
100.00 PHY8
100.00 PHYS
100.00 PHYS
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00. WA
0.00 WA
0.00, WA
0.00 WA
0.00 WA
...__ ____— . � I
CLiENT:
A&D ASB83TOS TESTAVQ&CONSULTINO
633 361/4 ROAD '
PALISADB,CO 81526
DcM saaxc$c.�sox,�TORY,nvc.
t2411 W.49TH AVfiNUB,[JNIT�k6
WHBAT RID(38,CO 80033 (303)463-8270
Bi1LK ASB&4TOS TES'Y'RBPORT
PACiE 1 OP 5
ANALYSIS DATB: 8-25-06
REPORTIN(}DATE: 8-28-06
RBCBIPT DATE: 8•13-06
, CLIBNT JOB NO.; THB LANDMARK
PROJECT TTfL&; 610 W.LIONSHEAD CR.-VAIL,CO 81657
DCM3L PRAJEGT: ADAT289
PERCENTAGE COMPOSTfION BY VISUAL ESTANATB
DCMSL CI.IENT , TOTAL
SAMPLE SAMPLB 3AMpLE �T�' PBRCBNTAOE
p�C�T ''���T�S ASB&STOS OTHER FIBROUS NON•FIBROUS IDENTiFIED
NUHIDLR NUI�IDER ' DATE DESCR�TION • OF SAMPLE TYPB RANCiE % IN SAMPLB CON3TITUENTS CONSTTfUENTS MA'T'ER1AJ,s
-1 LM-B-OQI 8-22-06 A»(3REYF�ROiT3/MULTTCOI,pRED 100.0��0 ND 90A
DEHRIS(n � ]0.0 100.0
-2 LM•B-002 8-Z2-06 A. GREY FIDROUS/MiJLTICOLORFD 100.0� � �.0
DEBRIS(n � 6.0 100.0
-3 I,M-B-003 8-22-06 A. l3REY FIBROU3/4REY RESIN(n 100.09L ND 78,0 22.0 i00.0
' . ND '
-4 LM-B-00,4 8-22-06 A. WHTf�PAINT ' 3.pg�
8. TAN PERL'TfIC CEILIN(3 TILS ' 97.0'�G
� 0.0 100,0 100.0
� ' � ?S,0 25.0 100.0
ND
.5 .LM•H-003 . . ........8-22-06 ...A. AVEi17�PAtNT .... . . . . . ...........................4.0°ib ........ND..............,..,...........,.,..,,.,..,.........................0.0 .................
........................................ ND
B. BROWN CSILINd TILB 96.0°.6 .. ...100.0 ....... .............100.0 •
. . 100.0 0.0 300.0
ND
-6 I.M-B-006 8-22•06 A. WHIT'E PAIIVT 2.p,�, �
B. TAN PERLII'IC CEILINQ TII.S 98.094 0.0 ]00.0 100.0
� 73.0 27.0
100.0
ND
`7 LM-B-007 8-22-06 A. WHITE PAINT � 2.09� � ND � 0.0
B. WHITEDRYWALLMUD 2.O�G Q�IItYSOTILE ��•� 100.0
C. TANFIBROU3 � C�-1] 0.5, 0.0 99.3 IOOA
4.036
, D. WHITEDRYWALL � 92.0% ; � • 100.0 99.0 100.0
<0.t � 100.0
-8 LM-B-008 8•22-06 A. aREY DRYWALL MUD
B. WHfi'E PAINT
C. WH1TS DRYWALL MUD
D. TAN FIgROUS
. E. WHTTB DRYWALL
1.0°/.
1�0%
3.0'�f► CHRYSOTILE [TR-1]
12.0'/i
83.07�i '
T`� 0.0
� 0.0
0.5 ; 0.0
� 100.0
� � TR
<0.1
100.0 100.0
100.0 100.0
99.5 100.0
0.0 100.0
100.0 l00.0
:�i �
CI.IENT:
A&D ASBSS?OS TESTINp gc CONSULTIIJ(9
653 36 1/4 ROAD
PALISAD$CO 81 S26
DCM SC18T1CB LASORATORY.INC.
� 1242t W.49'CFI AVt;NU$,1,TIQiT p6
N►�IEAT ND(iE,CO 80033 (303)463-8270
BULK ASBESTOS TBST RBPORT
PA(3B 1 OF S
ANALYSI9 DATB: 8-25-06
REPORTYrTG DATE: &28�06
RECEIPT DATB: 8.23-06
CLIENT JOH NO.: 'THg�NpMAg,K
PROJBCT TITLB; 610 W.LIONSHEAD CR,.VAIL,CO 81637
DCMSL PRO]ECT: ADAT289
PBRCBNTAQE COMPOSITlON BY VISUAL ES'IZMATg �
�
DCMSL CLIENT �T�
SAMPLE SA,MPLB g�(pyy TOTAL PERCENTAOB
�MB� N�� AATB DFSCRIpTI01V P�c� '��TO3 ASBESTOS OTHER PIBRpUS NON-FIBROUS IDENTIFIg�
OF SAMpI,g TYpE RANGE % IN SAMPLB CONSTITUPN!'g CONS'T1TU8N'fS MAT$gIAI,g
-9 LM-8-009 8-22-06 A. WHt7B DRYWALL MUD 1 A•r6 CFIIiYS017I.S [TTt 1] 1.0
B. WFIITB PAi1V1' 0.0 99.0 100.0
� z.ati rm o.o ioo.o ioo.o
C. TAN PIBROUS 1 S.ON. ND 100.0
D. WH11'EDRYWA.LL 82.0% ND 1.0 0•0 100.0 .
99.0 100.0
<0.1
-10 LM-B•O10 &22-06 A. WHTfE pAIN7'
. B. WHITB AR'YWALL MUD
C. TAN Fi$ROUS
D. WHff,E DRYWALL
-11 LM-B-0I1 8•22-06 A. TANPAINT
8. WHlTE DRYWALL Mt7D
C. TAN FIBROU3
D. WHITEDRYWALL
-12 LM-B-p12 &22-06 A. WH1TE PAJNT
. H. WHftE DRYWALi MiJD
, C. TAN FIBROUS
D. WHiTB DRYWALL
•13 LM-B-013 8-22-06 A. WHT1'g PAINp
B. WHTi'E DRXWALL MUD
C. TAN FIBROUS
D. WHITg DRYWALL
���
1.0'Y�
2.0°rio CFIRYSOTlLE 'jI'R•1J
25.OYo
n.o�,L
2.OY4
3.OS6 CHItYSOT'fI.H ITR-Il
3.0°�
90.046
1.0%
2.09�5 CHRYSO?II.E ITR•1)
6.Oh .
91.0'�O '
z.ati
4.0'�O CHRYSOTILE �['fR-1J
12.09L
82.0°�
�
� 0.0
0.5 ' 0.0
� 100.0
� i.o
<0.1 �
� 0.0
1.0 0.0
� 100.0
� -._�. TR
<0.!
ND
1.0
ND ,
ND
---------
ivn
0.3 '
ND
ND
<0.1
0.0
0.0
100.0
1.0
0.0
0.0
100.0
1.0
100.0 300.0
99.5 300.0
0.0 100.0
99.0 l00.0
100.0 I00.0
99.0 l00.0
0.0 100.0
100.0 100.0
100.0 100.0
99.0 100.0
0.0 �pp,p
99•0 100.0
100.0 300.0
99.5 100.0
0.0 100.0
99,0 100.0
. ' I
CLIENT:
A 8c D ASBSSTOS TESTINd&CONSULTINp
653 361l4 ROAD
PALISADB,CO 81526
DCM SCISN'CB LABORATORY,IIYG
12421 W,49TH AVBNCiS,UNIT�1�6
WHEAT RIDCiE,CO 80033 (303)463-8270
BULK ASBESTOS TEST TtEPORT
PAGB 3 OF S
ANALYSIS DATE: 8-25-06
REPORTiN(}DATE: 8,28-06
RBCEIPT DKfB: 8•23-06
CLIEN7'JOB NO.: THB LA,NDIyAg1C
PROJEGT TITLS: 610 W.WONSHBAD CR.VAIL,CO 81657
DCMSL PROJECT: ADAT289
PERCENTAGS COMPOSTflON BY VISUAL ESTIMATH
DCMSL CLIENT TOTAL
TOTAL PBRCENTAGB
��� �� S'�MZ'� PERCENT ASBESTOS ASBSSTOS OTHER FIHROUS NON.FIBROiTS IDENTIFIEp
NUMBHR NUMBER DATE DESCRIPTION OF SAMPLS TYPB RANQE % M SAMPLE CONSTITUBNTS CONSTlTUEN1'S MATERL�Lg
-14 LM-8-014 8-22-06 A. WHTI'E PAINT 3.036 ND 0.0 100.0 100.0
B. VVI�IITB DRYWALL MUD 4.0% CiIRYSOTlLE [TR-1] 0.5 0.0 99.5 104.0
C. TAN FIBROUB 12,0'/. ND 100.0 0.0 ]00.0
D. WH17'E DRYwAL.L 81.0% ND 2.0 98.0 100.0
<0.1
-15 IM-B-013 8-22-06 A. WHTi'E PAINT
. B. WHITE DRYWALL MUD
C. TAN Y�TBROUS
. D. WFIITEpRYWALL
-16 LM-B-016 8-22-06 A. WHffEPAINT
. H. WHTi'8 DRYWALL MUD
C. TAN FIHROUS
D. WH1TH DRYWALL •_..
-!7 LM-H-017 8-22-06 A. WHITEPAIIVT
B. WHTf$DRYWALL MUD
, C. TAN FIBROUB
D. 1VHITB DRYWALL
-18 LM-B-018 6-22-06 A. WH]TE DRYWAL.L MUD
� B. WHTfE PAII�T
C. ?AN FIBROUS
D. WHITBDRYWALL
B
2.0°K
3.0°/. CHItYS01'II,E [TR-1]
6.0'K .
89.0'K
1.09�6
Z.094 CHRY30TILE (TR•1]
4.OYo '
93.0'/0 •
Z.a�
3.0'N, CHRYSOTiLE (TR-1J
6.0'�G .
89.0°/a �
1.0% QiRYSOTILE ['TR-1]
2.09� '
4.0°�G ,
93.0%
�
� 0.0
0.5 ' 0.0
� 100.0
� 2.0
r0.1
� 0.0
1,0 0.0
� 100.0
� 2.0
<0.1
� o.o
0.5 0.0
� 100.0
� 2.0
<0.1
0.3 • 0.0
� 0.0
� 100.0
ND 2.0
<0.1
100.0 300.0
99.5 1U0.0
0.0 100.0
98.0 100.0
100,0 100.0
99A 100.0
OA 100.0
98.0 100.0
100.0 100.0
99.3 300.0
0.0 100.0
98.0 � 100.0
99.5 100.0
300.0 � 300.0
0.0 100.0
98.0 100.0
�
�
� A 6c D A38&ST09 TH3TtNd&CONSULTINO
653 361/4 ROAD
PALISADB,CO 81526
ACM SC�fCB LAHORATORY,INC.
12421 W,49TH AVENUS,LJNIT p6
WHEAT RIDpE,CO 80033 (303)463-82�0
BTJLK ASSBSTOS T&ST RSPORT
PAO$4 OF S
ANALYSIS DATB: 8•�3-06
RBPORTINa DATE; 8•28-06
RECEIPT DATB: 8.23-06
GZIBIVT JOB NO.: THg LANDHf,�RI{
PROJECT TTfLE: 610 W.LIONSHBAD CR,•VAII,,Cp 81657
DCMSL PR0IEGT: ADAT289
PBRCENTAGE COMPOSITlON BY VLSUAL ESTIMATE
DCM3L CLIENT. ' TOTAL
SAMPI.$ SAMPLB SAMPLE TOTAL PERCENTAC3E
P�C�T �B�TOS ASBESTOS OTHF.R FIBROUS NON-FIBROUS IDENIIFIED
NUMBER N[JIvlBER DATE DESCRTPT[ON OF SAI�LB TYPE RANGE 9L 1N 3AMPLE CON5TI7'U�'NTS CONSTl7VENT5 MATEWALS
-19 I,M-B-p19 8-22-06 A. WHITE DRYWAI.L IvIIID 1.OX CHRYSOTILE [1-S] 1.0 • 0.0
B. TAN AND WH1TE PAINT 2.0'/e 99.0 100.0
C. TANFIDItOUS S.0'h ND 100.0 100.0 1d0.0
D. WHITBDRYWALL 92.M�G, ND 2.0 98.0 100,0
c0.1 '
-20 LM-B-020 8-22-06 A. WH!'I'g PAINT
. ; 8. TAN FIHROUS
C. WH1TE DRYWALL MUD
D. WI�TE DRYWALL
FOR CAT,CLTLA'lTON PIJRPOSES,TRACE(TR)IS ASSUM�TO B&U.556.
(n-INSEPARAHLB LAYERS ND-NONB DETECI'!3D
9
6
9
�
1.OSL
S.0°� '
7.0°i6 CHRYSOTII:B [TR-1l
87.0°i6
B
�
� 0.0
� 100.0
O.S 0.0
� ..�_. . 2.0
' <0.1
100.0 100.0
0.0 . 100.0
99.5 100.0
98.0 100.0
�
� .�..��:.��.�.�„�N.z�,�.H.,z,.. ..
> - •
� DCM SCIENCE LABORATORY,INC.
� 12421 W.49'I'H AVENETE,UNIT 116 - �
WHEAT RIDGE,CO 80033 (303)463-8270 -
BULK ASBESTOS ANALYSIS-POWT CO[7Nf METHOD
PAGE 1 OF 4
CLIENT: ANALYSIS DATE: 8-31-06
AdtD ASBE.SPOS TESTIlVG REPORTING DATE: 8-3!-06
653 36 t/4 ROAD RECEIPI'DATE: 8-28-06
PALISADE,CO 81526 CLIENf IOB NO_: TF3E LANDMARK
PROJECT TITLE: 610 W.LIONSHEAD CR.-VAIL
DCMSL PROJEGT: ADAT290
' CROSS REFERENCE: ADAT289
PERCENTAGE COMPOSTfION BY ARFANOLUII�
DG'M LAB NO.: -1 -2 � -3 � -4 -S
SAMPLE DATE: 5-22-06 8-22-06 8-22-06 8-22-06 &22-06
'/�OF TOTAI.SAMPLE: 20'/6 3.0% 1.0'/s 2.0°h 3.OYa -
C7..IENf NO.: LM-B-0�7 LM-B-008 LM-B-OCR LM-B-010 LM-B-01 f
PART B PART C PART A PART B PART B •
ASBESI7FORM MII�IERAL FIBERS:
CFIRYSOTILE 025% 0.50% 0.75% 0.25Y. 0.75%
AMOSTTE ND ND ND ND ND
CROCIDOLTfE ND ND ND ND ND
TREMOLIT�ACfINOLITE ND ND ND ND ND
AN7HOPIIYLLiTE ND ND ND ND ND � .
TOTAL ASBESTOS CO[JNTED 0.25% 0.50'�G 0.75% 0.25%. 0.75% �
T�TAL ASBFSTOS IlJ LAYER O.ZSX 0.50'/0 0.75X 0.25Yo O.75Y.
TOTAL ASBES'[�OS IN SAMPLE 0.01% 0.02% 0.01% 0.01% 0.02°/.
NOTBS: SAMPLES NO.1-5 ARE WE;PIE DRYWAL.L M[JD.
ND-NONE DE7ECfED
DEFIIIITIONS
TOTAL ASBEST06 OOUNTED = THE AMOUNT OF ASBESTOS PRESFNT Ild THE SAMPLE EXPRESSED
AS A PER(.'ENT. •
TOTAL ASBF,STOS IN LAYER = 1'IiE PERCENT OF SAMPLB RgMAII�(ING TIIvIF.S ASBE.STOS COUNTED
EXPRESSED AS A PERCENT.
T�T'��B�T���� = THB PERCENT OF TOTAL SAMPLE{FROM PLM/SM qNpI,YSIS)
TA�iES THE TOTAL ASBESTOS W LAYER(IF NO ASSESTOS IN
� . 01HER I..AYERS).
�
� DCM SCIENCE LABORATORY,INC.
12421 W.49TH AVENUE,UN1T#(
WHBAT RiDGE,CO 80033 (303)463-8270
BULK ASBESfOS ANALYSIS-POINf COUNf METHOD
PAGH 3 OF 4 .
C�r: ANAI.YSI3 DATE: 8-31-06
A&D ASBESTOS TESTIlVG REPORTAVG DATE: 8-31-06 ~
653 36 1!4 ROAD RECEIp1'DATE: 8_2g�
PA.L[SADE,CO 8!526 CLIENT JOB NO.: Tf�LpNDMpRK
PROJEGT TITI,E: 610 W.LIONSHEAD CR._ypll,
� DCMSL PROJEGT: ADAT290
CROSS REFERENCE: ADAT289 �
PERCENTAGE COMPOSITTON BY AREA/VOLUI�
DCM LAB NO.: -1 1 -l2 ' -13 -14
SAMPLE DATB: 8-22-06 &22-06 5-22-06 8-22-06
%OF TO'fAL SAMPLE: 3.0'/0 1.0'/0 1.0'/. 7.0% �
_ CLIENT NO.: LM-B-Ot 7 LM-B-018 LM-B-019 LM B-pZp
PART B PART A PART A PART C .
ASBFS7TFORM M[NERAL FIBERS:
CHRYS0ITLE 0.75% 1.00'/. 1.75% OSO%
AINIOSITE � � � �
CROCIDOLITE ND ND ND ND
� TREMOLrI'E.ACFIIdOLITE ND Np ND �
A1VIHOPHYLLTTE ND ND � Np
TOTAI,ASBFSI'O.S COUN!'ED OJS% 1.00'/� 1.95% 0.50%
TO'fAI.ASBESTOS IN LAYER 0.75% 1.00'/� I.75% 0.50'h
TOTAL ASBFSTOS 1N SAMPLE 0.02% O.OIY. 0.02°/. 0.04%
NOTES: SAMPL,ES NO. t 1-14 ARE VVHTrE DRYWALL MUD.
ND-NONE DE'TECIEp
DEFIIdITIONS
—.__
1'OTAL ASBFS'P�S COUNTEp = 7HB AMOUNT OF ASBESTOS PRESEM'IN THE SAMPLE EXPRESSED
AS A PERCENf.
TOTAL ASBESPOS IN LAYER = THB PERCENT OF SAI�LE REMAi1�TIIdG 1TMES ASBF.STOS COUNTED .
EXPRESSED AS A PIItCEM:
TOTAL ASBES1nS IN SAMPLE = THE PERCENT OF TOTAL SAMPLE(FROM PLM/SM ANALYSIS) �
'I'II�IES THE TOTAL ASBFS'POS W LAYER(IF NO ASBESfOS IN
OT'fiER I.AYERS�
� 1)CM SCIENCE LABORATORY,INC.
t2421 w.49T�i AVEI�T[TE,11N7T#6
- WHEAT RIDGE,CO 80033 (303)463-8270 .
BULK ASBESI'OS ANALYSIS-POINT COUM'MSfHOD
PAGE 2 OF 4
�: ANALYSIS DATE: 8-3I-06 .
ABcD ASBESTOS TESTING . REPORTIIVG DA1E: &31-06
653 36 1/4 ROAD RECEIPT DA1B: &28-06 .
PALLSADE,00 81526 CI.IENT JOB NO.: THE I.pNpMpRK
_ PROJEGT TITLE: 6i 0 W.LIONSHEAD CR.-VAII,
DCMSL PROJEGT: ADAT290
CROSS REFERENCE: ADAT289
PERCENTAGE COMPOSTITON BY ARF.ANOLUME
DCM LAB NO.: -6 -7 -8 -9 -t0
SAMPLE DATE: &22-06 8-22-06 8-22-06 &22-06 8-22-06
°/.OF TOTAL SA11�LE: 2.QYo 4.OYe . 4.0'/0 3.0'/� 20'/. �
CLIENf NO.: LM-B-OI2 LM-B-013 IM•E,OI4 ZM-B-015 LM-&016
PART B PART B PART B PART B PART B
ASBESI'[FORM A�IDVERAL FBERS:
�Y�L� 0.50'/� 0.50% 0.25% 0.75% 0.75%
AMOSl1'E ND ND ND ND ND
CRO�IDOLITE ND ND ND ND ND
TREMOLIT&AGTINOLTfE ND ND ND ND ND
AN'IHOPHYLLTPE ND ND ND ND ND
T�'�►i-���n osa� o.so�io o.as•ie oas�� o.�sx
T07'AL ASBESTOS IN LAYER osa,� osa�o o.u•ie o.�s�i. o.�s��
TO'fAi.ASBBSTOS IN SA14�LE 0.01°i6 0.02% 0.01% Q.02`/0 0.02°/s
NOrfES: SAMpLES NO.6-10 ARE WHiTE DRYWALL MUD.
ND-NONE DF.TECTED
DEFIIVITIONS
1i0TAL ASBESTOS.COUM'ED = THE AMOUNT OF ASBBSTOS PRESBNf IN THE SAMPLE EXPRESSED
AS A PIItCENf.
TOTAL ASBESTOS IN LAYER = 'I�iE PERCENf OF SAMPLE REMAIlVING TIIMES ASBESTOS COUNTED
EJ�RE.SSBD AS A PERCENT.
TOTAL ASBESfOS IN SAMPLE = THE PERG'ENT OF TOTAL SAMPLE(FROM PLM/SM ANpI,YSIS�
TII�IES THE TOTAL ASBESTOS 1N LAYDt(IF NO ASBBSTOS IN
O'fHER L.AYERS).
� r DCM Science Laboratory, tnc.
� . 12421 VY:49th Avenue,Unit#6
_ Wfieat Ridge, CO 80033
DCM Project No» ADsAT 290
l�snt.fob No» THE UWDMARK
Quantitat3ve Butk Sample Anatysis(Point Count)
QUANTITATNE BULK 3AMPLE ANqLYSIS PROCEDURES: Page�ot�
DCM Science Laboratory, ina analyzes bulk sampl�s in aa�rdance with the National Emission Standard for
Hazardous Air Pollutants(NESHAP)for asbestos(Federal Register,Vol.55.No.224,pp.4g4pg�.qg433,
�120�d)• The ar►a�yt►ca�Procedures fo�bwed are descr�bed in"hrterim Method for the Determination of
Asbestos in Buik Insutati�on Samples",(USEPA 600/NI4-83-020, 1982),with minor modifications recommended
by ihe Atrnospheric Research and Exposure Assessment I.aborabo�y,USEPA,Research Triangle Park,N.C.
Samples analyzed by the point couM method are mi{ted to homogenize the sample�prepared on microscope
slides and point counted using polarized I"ight microscopy(pLM)i�c�jurx�n with a point courrting stage and
counter. One hundred counts are performed on four separate prepar�tions of each sampte,for a totat of 4Q0
points.. If asbestos is identfied twt not c�unted during Uie point countlng proc�dure,btal asbestos is reported
as zero and presence is noted on the neport. Ofher preparafion prooedures�cluding ashing and acid washing
may be pe�fortned with client pertnission to improve a�curacy in detiermining asbesfios�or►centration. All
samples are archived for six months unless other arrangements ar�e made by the cfient
ACCREDRATION:
DCMSL is accredited by the AlHA(since 1986). Our laboratory number is 101526.- DCMSL is accredited by
NVI-p►P(since Apn'I 1, 1989). DCMSL complies with NVtAP ar�AINA requirements unless othervvise noted.
ENDORSEMENT:
The results of this analysis must not be used by the client to daim endorsement by NVLAP or any agency of the
U.S.Govemment
This test report relates only to the items bested. This report may not be reproduced except in ful[,without the
written approval of the laboratory. The anaEysis was pertortned by;
�
John Silvverman,Anahrst Eton Schott�qnalyst
Ron Schott �31-�0
�� � .
�da ' . .
. �
��,�,�
.
' __ � DCM Science Laboratory, tnc. -
� � � � � .12421 W.49th Avenue,Unit#6
� Wheat Ridge,CO 80033. `
DCY Projed No.: ADAT 289 '
Ctlerrt Job Na: THE LANDMARK •
Bulk Sample Analysis �
BULK SAMPLE ANALYSIS PROCEDURES: P����
DCM Sctience laboratory,Inc.analyzes bulk asbestos sarnples followirx,�procedures developed by the
McCrone Research lnstitute and in compliance with guideGnes es�b�sf�by t�Envirortmental Protection
Agency(EPA-600/R-93/116,July, 1993).
Bulk samples are prepared for anafysis using a 10X-80X stereo microscope in a hepa fifter hood which provides
a contamination-free environment 1'he sample is then analyzed►�y pofarized light microscopy(PLM)at t00X.
When the sample consists of more than one tayer,ead�tayer is prepared and anayzed separately. Fpber and
matrix maberials are ideMified by the characteriza�on of opticai ProPerties induding color and pleochrorism, ,
form.d�vage,rel'ief;:birefringer�ce,extinction.orrienta6on,lwin�ing�int�ence figure and�er distinguishing
featur�s. Dispersion stiining is also used to f�rther aid in mineral identif�cation. A�pe�enlages of asbestos,
other fibers�d non-fibrous constitue�s are cakxilabed Trom tfte values obl�ined from the stereo and PCM �
m�Pes analysis. In-hause and I�IST standartis as wea as a chart pr+epared by R.D.Terty and G.V.
Chifrnger for"The Joumai of Sedimentary Petrofog�',(Volume 24,PP.229-234, 1955)provide a guide for
estin►atin9 Per+centages. A!I samples ar+e archived fer soc months unless othec arrangemerrts are made by the
aient
ACCREDffAT10N:
DCMSL is accredited by NVt,qp(since ApN 1, 1989). Our NVLAP Lab Code is 101258-0. DCMSL complies
with NVLAP requiremerrts unle.ss othervvise noted. .
ENDORSEMENT:
The results of this analysis must not be used by the dfent to ctaim endotsement by NVLAP or any agency of the
U.S.Gov�emment
This best r�eport relates only to the items tested, This�eport may not be reproduced except in full,without the
written approval of the laboratory. The analysis was perFormed by:
,
!
John Savertnan,Anaiyat Ron Sd�ott,Arralyst
Ron Schott � �-p
Labaatory Di�ec�or D�
��d� ' �
�
����,�,�
' ..
.
�
4 �
'
f
A & D Asbestos�Testing and Consulting -
Joh3p R. Peterman
�
�
�
�*�***�********�*
►
E
P.O.Box 12�0 Clifton, CO. 81520-1230
Cell 970-270-36$9 �Home Phone 97(}-464-5265
i �
August 26;2006
To: Destination Resorts �
The LandMark
- 610 W.Lionshead Circle
Vail, CO. 81657
�
�
Attn: Geoff Wright �
RE: Asbestos inspection and testing at The LandMazk,b 10 W. LionsHead �
Circle,Vail, CO. 81657 �
f
�- i Description Cost
20—Bu1k Samples (3 to 5 da�tum aronnd) @ $45 each $900.00 �
�
14—Point Count Analysis (3�o� days) @ $45 each 630.00
E
1 -Davs Labor @ �400 00 per day - q.pp pp
I
TOTAL AMOUNT DUT THIS IlWOICE 1930.00 �
r
►
Due and Payable upon �eceipt—Thank you for your business
� �
� .
i (
, -
� =
;