Loading...
HomeMy WebLinkAbout5b. Ever Vail Trip Gen Comparison Letter ❑�❑ Kimley-Horn � antl Associates, Inc. ■ November 10, 2010 Suite 450 990 South Broadway Denver,Colorado 80209 Thomas Miller Vail Resorts Development Company 137 Benchmark Road Avon, CO 81620 Re: Ever Vail Trip Generation Calculation Comparison Letter Dear Mr. Miller: The purpose of this letter is to provide a trip generation comparison to identify the difference in traffic excpected to be generated with the currently proposed Ever Vail project to the original uses contained on site. This study represents an afternoon peak hour trip generation report for the Ever Vail project. This trip generation letter provides a current comparison of the previous site generated trips being redeveloped, which includes the Vail Resorts Maintenance and Parking facility, Cascade Crossing, Vail Professional Building, Vail BP gas station, and the Glen Lyon Office Building to the anticipated proposed Ever Vail site generated trips. This calculation procedure uses the current Town of Vail approved methodology and Institute of Transportation (ITE) "Trip Generation", 8�Edition rates. The previous site contained the following trip generating uses and areas/sizes: Existin�Site - • Office 29,836 square feet • Maintenance Office 9,600 square feet • Retail 10,522 square feet • Gas Station 8 fueling positions • Restaurant 1,479 square feet ■ TEL 303 228 2300 FAX 303 446 8678 �� Kimley-Horn Mr. Thomas Miller,November 10, 2010, Page 2 �� antl Associates, Inc. The proposed Ever Vail redevelopment currently proposes the following trip generating uses and areas/sizes: Ever Vail November 2010) West Side • Residential (Recreational Homes) 144 units • Employee Housing (Apartment) 22 units East Side • Residential (Recreational Homes) 237 units • Retail 15,564 square feet • Employee Housing (Apartment) 19 units • Hotel 102 rooms • Office 34,669 square feet • Market 13,293 square feet • Restaurant 15,695 square feet • Night Club 6,642 square feet The ITE "Trip Generation" 8�Edition was used to calculate the trips anticipated from each use. Then an external trip percentage was identified for each use. These external trip percentages were obtained based on knowledge of the area and the Vail Transportation Master Plan. Sased on the proposed areas and accepted traffic study methodology, the following table identifies the anticipated P.M. peak hour trip generation from the proposed Ever Vail site, compared to the trip generation of the previously proposed site, along with the resultant anticipated change in traffic (calculations attached). ❑�❑ Kimley-Horn Mr. Thomas Miller,November 10, 2010, Page 3 � and Associates, lnc. Existing Site vs. Ever Vail Project P.M. Peak Hour Tri Generation Com arison Existin and Previous Uses External Projected Trip Peak Hour Use Size Source Rate Percenta e Tri s Office* 39,436 sf ITE(710 1.49 tri s/1000 sf 100% 59 Retail 10,522 sf ITE 814 2.71 tri s/1000 sf 35% 10 Gas Station 8 fuel os. ITE 944 13.87 tri s/1000 sf 80% 89 Restaurant 1,479 sf ITE 931) 7.49 tri s/1000 sf 35% 4 Total Existin Site Previous P.M.Peak Hour Tri Generation 162 Ever Vail November 2010 External Projected Trip Peak Hour Use Size Source Rate Percenta e Tri s West Side Residential 144 units ITE(260 0.26 tri s/unit 80% 30 Em lo ee Housin 22 units ITE 220 0.62 ri-i s/unit 45% 6 East Side Residential 237 units ITE 260 0.26 tri s/unit 80% 49 Em lo ee Housin 19 units ITE 220 0.62 tri s/unit 45% 5 Hotel 102 rooms ITE 330 0.42 tri s/room 80% 34 Office 34,669 sf ITE 710) 1.49 tri s/1000 sf 100% 52 Retail 15,564 sf ITE 814 2.71 tri s/1000 sf 35% 15 Market 13,293 sf ITE 850) 10.5 tri s/1000 sf 35% 49 Restaurant 15,695 ITE 931) 7.49 tri s/1000 sf 35% 41 Ni t Club 6,642 ITE(925) 11.34 tri s/1000 sf 35% 26 Total Ever Vail November 2010 P.M.Peak Hour Tri Generation 307 PRO.TECTED PEA;K HOUR TRIP.I3IFEERENCE>" 145 ..: ; ITE=Institute of Transportation Engineers Trip Generation *Includes 9,600 sq.ft.included within the maiatenance facility �� Kimley-Horn Mr. Thomas Miller,November 10, 2010, Page 4 �� antl Associates, Inc, You will note that the existing employee parking spaces found on the site today are not included in the analysis. Likewise the proposed employee parking space replacement at 289 spaces, the 400 public spaces intended to replace those cars parking on the South Frontage Road, and the trips generated by the transit facilities or other public uses are not included in this trip generation analysis in order to provide a fair comparison of uses generated by the project. Additionally, the proposed gondola does not generate new trips especially within a multi-portal community like Vail where no new on-mountain capacity is being proposed (i.e., expansion of terrain). The gondola is simply a conveyance to the ski mountain. Its presence allows convenient access to the mountain by those staying and parking within Ever Vail. Without the gondola, people parking or staying within the project would impact the Towri s transit system to a greater degree and potentially cause congestion at other portals. The need for the gondola only comes from the public parking being provided as well as the residential and lodging uses found within the project. As summarized in the table, the Ever Vail redevelopment project is anticipated to generate 145 additional P.M. peak hour trips during the peak season day using the ITE trip generation methodology, identifying specific use areas and using realistic external trip percentages. This methodology provides a direct comparison between the previous site trip generation and the Ever Vail redevelopment project trip generation. If you have any questions or require anything further, please feel free to call me at (303) 228-2300. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. � �. .. .. . � � � �� o �� �. :�� ��c� : Curtis D. Rowe, P.E., PTOE :" 36355 �� ' t�.;=� Vice President ,o.� l� (10 �� Attachments 9�FFSSIONP�-�� Existing Site Trip Generetion being redeveloped by Ever Vail-PM Peak Hour of Adjacent Street Traffic Projected PM Peak External Trip Peak Hour Use Source Size Units PM Rate Hour Trips Percentage Trips Office ITE(710) 39,436 square feet 1.49 trips/1000 sf 59 100% 59 Retail ITE(814) 10,522 square feet 2.71 trips/1000 sf 29 35% 10 Gas Station ITE(944) 8 fueling positions 13.87 trips/1000 sf 111 80% 89 Restaurant ITE(931) 1,479 square feet 7.49 trips/1000 sf 11 35% 4 Total 209 Total 162 Ever Vail PM Peak Hour of Adjacent Street Traffic Trip Generation Projected PM Peak External Trip Peak Hour Use Source Size Units PM Rate Hour Trips Percentage Trips West Side Residential ITE(260) 144 units 0.26 trips/unit 37 80% 30 Employee Housing ITE(220) 22 units 0.62 trips/unit 14 45% 6 Subtotal 51 Subtotal 36 East Side Residential ITE(260) 237 units 0.26 trips/unit 62 80% 49 Employee Housing ITE(220) 19 units 0.62 trips/unit 12 45% 5 Hotel ITE(330) 102 rooms 0.42 trips/room 43 80% 34 Office ITE(710) 34,669 square feet 1.49 trips/1000 sf 52 100% 52 Retail ITE(814) 15,564 square feet 2.71 trips/1000 sf 42 35% 15 Market ITE(850) 13,293 square feet 10.5 trips/1000 sf 140 35% 49 Restaurant ITE(931) 15,695 square feet 7.49 trips/1000 sf 118 35% 41 Night Club ITE(925) 6,642 square feet 11.34 trips/3000 sf 75 35% 26 Subtotal 543 Subtotal 271 Total 594 Total 307