PROJECT REVIEW COMMENTS
DATE: 3/17/2011
TO: Highland Builders Corp.
mark@highlandbuilders.com
PERMIT APPLICATION #: B10-0004
PROJECT ADDRESS: 2810 Aspen Court
OCCUPANCY GROUP: R-3
TYPE OF CONSTRUCTION: VB
NUMBER OF STORIES: 2
BUILDING AREA: addition
● Submit four complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified.
● Please respond in writing to each comment with a response letter addressing each comment.
Building Department Comments
Architectural Comments:
1. Revise cover sheet to indicate 2009 IRC as adopted by Town of Vail.
2. Revise Rescheck to use 2009 IECC as adopted by Town of Vail.
Structural Comments:
Reviewed and accepted
Plumbing Comments:
1. Provide gas pipe sizing calculations for proposed new appliances per section 402.3 IFGC..
Mechanical Comments:
Reviewed and accepted
Electrical Comments:
Reviewed and accepted
Planning Department Comments
1. Revise Sheets A003 to calculate the front entry and storage area as GRFA on both the lower level and main level plans.
The storage area below the entry can not be deducted as a crawlspace since it is constructed directly above another deducted crawlspace. The maximum 5 ft. height of a deducted crawlspace
is measured from the earth to the structural members above. Additionally, the floor-to-ceiling height in the entry is greater than 16 feet and is therefore defined as additional GRFA.
Fire Department Comments
Reviewed and accepted
Public Works Comments
Reviewed and accepted