Loading...
HomeMy WebLinkAboutB11-0030************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R110000194 Amount: $1,546.19 03/21/201101:09 PM Payment Method:Credit Crd Init: SAB Notation: VISA - PATRICK HOEFT ----------------------------------------------------------------------------- Permit No: Bll -0030 Type: COMBINATION BLDG PERMIT Parcel No: 2103 - 124 - 0300 -5 Site Address: 1290 WESTHAVEN CR VAIL Location: 1290 WESTHAVEN - CRAWLSPACE Total Fees: $11,113.30 This Payment: $1,546.19 Total ALL Pmts: $1,546.19 Balance: $9,567.11 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- PF 00100003112300 PLAN CHECK FEES 1,546.19 Department of Community Development } � ,�„- , 75 South Frontage Road y; ,` '; Vail, Colorado 81657" Tel: 970 - 479 -2128 _} Web: www.vailgov.com Development Review Coordinator lit BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project Street Address: 1290 Westhaven Circle (Number) (Street) Building /Complex Name: Contractor Information Business Name: Hoeft Builders West INC Business Address: PO Box 6332 City Avon Contact Name: (Suite #) State: CO Z ip: 81620 Patrick Hoeft/Hoeft Builders West INC Contact Phone: 970 904 1959 Contact E -Mail: Patrick @hoeftbuilderswest.com Contractor Registration Number: 1078 -B X ,..� Owner /Own is epresentative Signature (Required) Project Information Owner Name: 5ephaven LLU Parcel #: 2103- 124 - 0300 -5 (For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit www.eaglecounty.us /patie) Project #: �l J I - o 6 I L , f u DRB #: �� W Building Permit #: Lot #: Block # Subdivision: Work Class: New ( ) Addition ( ) Alteration ( / ) Type of Building: Single - Family ( ✓) Duplex ( ) Multi - Family ( ) Commercial( ) Other( ) Work Type: Interior (✓) Exterior ( ) Both ( Valuation of Work Included Plans Included Work Electrical (,/)Yes ( )No (V)Yes ( )No 15� Mechanical ( )Yes ( )No (4 yes ( )No 77 00 Plumbing (,/)Yes ( )No (✓)Yes ( )No Building (,/)Yes ( )No (✓fYes ( )No } QQ Qn Value of all work being performed: $ (. (value based on IBC Section 109.3 & IRC Section 108.3) Electrical Square Footage Detailed Scope and Location of Work: Completion of unfinished space (DRB Approved), frame, electrical, AV /Alarm, heat Concrete, insulate, drywall, carpet. Relocation of Guest room bathroom to other side of room (see plumbing drawings) new electrical circuits (see electrical Drawing). Removal and re install of all old plumbing fixtures for new, new shower pans, tile and cabinets throughout every bathroom.All fire sprinklers affected will accommodate all fire codes(See Plan) (use additional sheet if necessary) For Oftice se Only: Fee Paid: Received From: Cash Check # CC: Visa / C Last 4 CC # yc p exp date: Auth # a �� Date Received: MAR 21 2011 TO WN OF V AIL 01- Jan -I 1 Indoor Environmental Services, Inc Dba: Q Consulting, Inc. Project: 1290 Westhaven Cir, Vail, Colorado Asbestos Sampling Report — Page 1 of 2 March 15, 2011 Patrick Hoeft Hoeft Builders West Inc On March 14, 2011, Quentin Danziger conducted an asbestos inspection of the suspect materials that will be affected by the planned remodel. This includes all texture, sheetrock and joint compound in the affected areas. Asbestos was NOT found, as described below. Homogenous Description Number of % Asbestos Square Type/Friable? Area Samples Feet 01 Main House 3 Non Detect Texture 02 Main House 3 Non Detect Sheetrock/Joint Compound 03 Caretaker 3 Non Detect Texture 04 Caretaker 3 Non Detect Sheetrock/Joint Compound BACKGROUND: A remodel is planned. Indoor Environmental Services was requested to conduct an asbestos inspection of the suspect materials throughout the Unit. This inspection includes only suspect materials that are visible to the inspector. If other suspect materials become visible during demolition, they must be sampled before they are disturbed. Examples of suspect materials include but are not limited to: linoleum, floor tile, ceiling tile, mastic, sheetrock, joint compound, roofing materials, etc. There are over 3000 known asbestos containing materials. Indoor Environmental Services, Inc Dba: Q Consulting, Inc. Project: 1290 Westhaven Cir, Vail, Colorado Asbestos Sampling Report — Page 2 of 2 SAMPLING PLAN: Colorado State Requirements - For each homogenous area of less than 1000 square feet, a minimum of three samples must be collected in random areas. For each homogenous area of 1000 — 5000 square feet, a minimum of five samples must be collected in random areas. Areas of 5001 square feet or greater require a minimum of 7 samples. These laws are defined by the EPA (AHERA) and Colorado State Regulation 8. Determination of homogenous sampling areas — Homogenous Areas are determined by type of suspect material, texture, color and location. Determination of random sampling areas — The samples were collected in a random manner. Thank you for using Q Consulting, Inc. We are proud to be your local indoor air quality consultants. We look forward to working with you in the future. Quentin Danziger, BS, CIE, ABI — Colorado Asbestos Inspector Certification # 12781 Indoor Environmental Services, Inc. Dba Q Consulting, Inc. 970 - 390 -0087 QConsultingInc @yahoo.com EMSL Analytical, Inc. 7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112 Phone: (303) 740 -5 700 Fax: (303) 741 -1400 Em ail: denverlab@errsl com Attn: Quentin Danziger Customer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Received: 03/15/11 9:00 AM Vail, CO 81658 EMSL Order: 221100822 Fax Phone: (970) 390 -0087 EMSL Proj: Project: 1290 Westhaven Cir- Vail Analysis Date: 3/15/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600 /R- 93/116 Method using Polarized Light Microscopy Non - Asbestos Asbestos Sample Description Appearance % Fibrous % Non- Fibrous % Type 01 -01 main master bath White 100% Non- fibrous (other) None Detected 221100822 -0001 texture Non- Fibrous Heterogeneous 100% Non- fibrous (other) None Detected 01 -02 main master bath White 221100822 -0002 texture Non- Fibrous Heterogeneous 100% Non- fibrous (other) None Detected 01 -03 main master bath White texture Non- Fibrous 221100822 - 0003 Heterogeneous 100% Non- fibrous (other) None Detected 02 -01- Texture main master bath White sheetrock/JC Non- Fibrous 221100822 -0004 Heterogeneous 100 ° /d Non- fibrous (other) None Detected 02 -01 -Joint main master bath White Compound sheetrock!JC Non- Fibrous 221100822 -0004A Homogeneous 02- 01- Sheetrock main master bath Brown/W 10% Celiulose 85% Non- fibrous (other) None Detected sheetrock/JC Fibrous 5% Glass 221100822 -00048 Heterogeneous 100% Non- fibrous (other) None Detected 02-02-Texture main master bath White sheetrock/JC Non- Fibrous 221 100822-0005 Heterogeneous Initial report from 03/15/2011 14:11:03 Analyst(s) Molly Walker (24) Erin Orthun, Laboratory Manager or other approved signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written appro�el by EMSL. E no responsibility for sample collection activities or analytical method limitations- Interpretation and use of test results are the responsibility of the client- This report must not be use client to claim product certification, approwl, or endorsement by NVLAP. NIST or any agency of the federal govemment. Non - friable organically bound materials present a problem r therefore EMSL recommends gravmetric reduction prior to analysis. Samples recened in good condition unless otherwise noted. Samples analyzed by EMSL Analytical, Inc. Centennial, CO NVLAP Lab Code 200828-0 Test Report PLM- 7.23.0 Printed: 3/1512011 211:03 PM 0 EMSL Analytical, Inc. 7330 S. Alton Way Building 12 Suite A. Centennial, CO 80112 Phon (303) 740 -5700 Fax: (303) 741 -1400 Email:_ denveriabMemsi.com Attn: Quentin Danziger Customer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Recei%ed: 03115. 9:00 AM Vail, CO 81658 EMSL Order: 221100822 Fax Phone: (970) 390 -0087 EMSL Proj: Project: 1290 Westhaven Cir- Vail Analysis Date: 3/15/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R- 93/116 Method using Polarized Light Microscopy Non - Asbestos Asbestos Sample Description Appearance % Fibrous % Non- Fibrous a/ Type 02 -02 -Joint main master bath White 100% Non- fibrous (other) ( None Detected Compound sheetrock/JC Nan - Fibrous 221100822 -0005A Homogeneous 02- 02- Sheetrock main master bath Brown/White 10% Cellulose 85% Non- fibrous (other) None Detected sheetrock/JC Fibrous 5% Glass 221100822 -0005B Heterogeneous 02- 03- Texture main master bath White 100% Non- fibrous (other) None Detected sheetrock/JC Non- Fibrous 221100822 -0006 Heterogeneous 02 -03 -Joint main master bath White 100% Non- fibrous (other) None Detected Compound sheetrock/JC Non- Fibrous 221100822 -0006A Homogeneous 02- 03- Sheetrock main master bath BrowniWhlte 10% Cellulose 85% Non- fibrous (other) None Detected sheetrock/JC Fibrous 5% Glass 221100822 -00068 Heterogeneous _ 03-01 caretaker unit- Tan/White 100% Non- fibrous (other) None Detected 221100822-0007 texture Non- Fibrous Heterogeneous Sample labeled 04 -01 Initial repo from 03(15/2011 14:11:03 Analyst(s) Molly Walker (24) Erin Orthun, Laboratory Manager or other approved signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. E no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be use client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non - friable organically bound materials present a problem i therefore EMSL recommends gravlmetnc reduction prior to analysis. Samples received in good condition unless otherwise noted. Samples analvzed by EMSL Analytical, Inc. Centennial, CO NVLAP Lab Code 200828-0 2 Test Report PLM- 7.23.0 Printed: 3/1512011 2:11:03 PM EMSL Analytical, Inc. 7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112 Phone: (303) 740 -5700 Fax: (303) 741 -1400 Email: denveriab@emsl.com Attn: Quentin Danziger Customer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Received: 03/15/11 9:00 AM Vail, CO 81658 EMSL Order: 221100822 Fax Phone: (970) 390 -0087 EMSL Proj: Project: 1290 Westhaven Cir- Vail Analysis Date: 3/15/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R- 93/116 Method using Polarized Light Microscopy Non - Asbestos Asbestos Sample Description Appearance % Fibrous % Non - Fibrous % Type 03-02 caretaker unit- Tan/White 100% Non- fibrous (other) None Detected 221100822 -0008 texture Non- Fibrous Heterogeneous Sample labeled 04 -02 03-03 caretaker unit- TanfWhite 100% Non- fibrous (other) None Detected 221100822 -0009 texture Non- Fibrous Heterogeneous Sample labeled 04 -03 0401 - Texture caretaker unit- Tan/White 100% Non- fibrous (other) None Detected sheetrock/JC Non - Fibrous 221100e22-0010 Heterogeneous Sample labeled 05-01 04-01 -Joint caretaker unit- White 100% Non- fibrous (other) None Detected Compound sheetrock/JC Non- Fibrous 221100822 -0010A Homogeneous 04- 01- Sheetrock caretaker unit- Brown/White 10% Cellulose 85% Non- fibrous (other) None Detected sheetrock/JC Fibrous 5% Glass 221100822 -ooloe Heterogeneous 0402 - Texture caretaker unit- Tart/White 100% Non- fibrous (other) None Detected 221100822 -0011 sheetrock/JC Non- Fibrous Heterogeneous S amp l e lab 05-02 Initial report from 03/15/2011 14:11:03 Analyst(s) Molly Walker (24) Erin Orthun, Laboratory Manager or other approved signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. t no responsibility for sample collection activities or analytical method limitations- Interpretation and use of test results are the responsibility of the client. This report must not be use client to claim product certification, approval, or endorsement by NVLAP. NISI or any agency of the federal govemment. Non - friable organically bound materials present a problem i therefore EMSL recommends gravmetnc reduction prior to analysis. Samples received in good condition unless otherwise noted. Samples analyzed by EMSL Analytical, Inc. Centennial, CO NVLAP Lab Code 200828-0 Test Report PLM- 7.23.0 Printed: 3115 211:03 PM 3 ' EMSL Analytical, Inc. 7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112 Phone: (303) 740 -5700 Fax: (303)741-WO Email: denveriab@emsl.com Attn: Quentin Danziger Customer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Received: 03115/11 9:00 AM Vail, CO 81658 EMSL Order: 221100822 Fax Phone: (970) 390 -0087 EMSL Proj: Project: 1290 Westhaven Cir- Vail Analysis Date: 3/15/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R- 93/116 Method using Polarized Light Microscopy Non - Asbestos Asbestos Sample Description Appearance % Fibrous % Non - Fibrous % Type 0402 -Joint caretaker unit- White 100% Non- fibrous (other) None Detected Compound sheetrock/JC Non- Fibrous 221100822 -0011A Homogeneous 0402- Sheetrock caretaker unit- BrownlWhite 10% Cellulose 85% Non- fibrous (other) None Detected sheetrock/JC Fibrous 5% Glass 221100822 -0011e Heterogeneous 0403 - Texture caretaker unit- Tan/White 100% Non- fibrous (other) None Detected sheetrock/JC Non - Fibrous 221100822 -0012 Heterogeneous Sample labeled 05 -03 0403 -Joint caretaker unit- White 100% Non- fibrous (other) None Detected Compound sheetrock/JC Non- Fibrous 221100822 -0012A Homogeneous 0403- Sheetrock caretaker unit - Brown/White 10% Cellulose 85% Non- fibrous (other) None Detected sheetrock/JC Fibrous 5% Glass 221100822 -00128 Heterogeneous Initial report from 03115/2011 14:11:03 Analyst(s) Molly Walker (24) Erin Orthun, Laboratory Manager or other approved signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. E no responsibility for sample collection actiWties or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be USE client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal goeemment. Non - friable organically bound materials present a problem r therefore EMSL recommends grammetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Test Report PLM- 7.23.0 Printed. 311512011 211:03 PM THIS IS THE LAST PAGE OF THE REPORT- 4 , 07 -11 -2011 Inspection Request Re orting Page 4 4:31 pm Vail, CO - City O Requested Inspect Date: Tuesdayy, July 12 2011 Site Address: 1290 WESTHAV�N CR VAIL 1290 WESTHAVEN - CRAWLSPACE A/P /D Information Activity: 611 -0030 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: R -3 Insp Area: Owner: SEP -HAVEN LLC Contractor: HOEFT BUILDERS WEST INC Phone: 970 - 904 -1959 Description: INSULATE( COMPLETION OF ( CARPET RELOCATION OF GUEST RQOM / BATHOORM TO OTHER SIbE OF ROOM, NEW ELECTRICAL CIRCUITS. REMOVAL AND REINSTALL ALL OLD PLUMBING FIXTURES FOR Reauested Insoectionls Item: 190 ELEC -Final Requested Time: 11:30 AM Requestor: Phone: Comments: 904 -195 Assigned To: AGON Entered By: MHAEBERLE K Action: Time Exp: Inspection History Item: 30 BLDG - Framing ** Approved ** 04/22/11 Inspector: sgremmer Action: PA PARTIAL APPROVAL Comment: 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 50 BLDG - Insulation ** Approved ** 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 60 BLDG - Sheetrock Nail ** Approved ** 05/04/11 Inspector: sgremmer Action: AP APPROVED Comment: Item: 120 ELEC -Rou h ** Approved ** 04/21/11 Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH -Rough 04/15/11 Inspector: sgremmer Action: Comment: 3rd rec rm in floor heat at 100psi PI PARTIAL INSPECTION Item: 220 PLMB - Rough /D.W.V. ** Approved ** 04/22/1 T Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 4th floor only 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 230 PLMB- Rough/Water ** Approved ** 04/22/1 T Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 4th floor only 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 190 ELEC -Final Item: 290 PLMB -Final Item: 390 MECH -Final Item: 532 PW -TEMP. C/O Item: 539 PW -FINAL C/O Item: 90 BLDG -Final REPT131 Run Id: 13311 0742 -2011 Inspection Request Reporting Page 5 4:26 Dm Vail, Co _ City Of Requested Inspect Date: Wednesdayy JulyY 13 2011 Site Address: 1290 WEST�iAVEN G VAIL 1290 WESTHAVEN - CRAWLSPACE A/P /D Information Activity: B11 -0030 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: R -3 Insp Area: Owner: SEP -HAVEN LLC Contractor: HOEFT BUILDERS WEST INC Phone: 970 - 904 -1959 Description: COMPLETION OF UNFINSHED SPACE, FRAME, ELECTRICAL AWALARM, HEAT CONCRETE INSULATE DRYWALL CARPET. RELOCATION OF GUEST RdOM BATHOORM TO OTHER SIbE OF ROOM, NEW ELECTRICAL CIRCUITS. REMOVAL AND REINSTALL ALL OLD PLUMBING FIXTURES FOR NEW. Requested Inspection(s) Item: 390 MECH -Final Requestor: Comments: 904 -19 Assigned To: GON Action Time Exp: Requested Time: 08:30 AM Phone: Entered By: MHAEBERLE K fe2 Insaection Histo Item: 30 BLDG - Framing ** Approved ** 04/22/11 Inspector: sgremmer Action: Comment: 04/29/11 Inspector: JRM Action: Comment: Item: 50 BLDG - Insulation ** Approved ** 04/29/11 Inspector: JRM Action: Comment: Item: 60 BLDG - Sheetrock Nail ** Approved ** 05/04/11 Inspector: sgremmer Action: Comment: Item: 120 ELEC -Rough ** Approved ** 04/21/17 Inspector: sgremmer Action: Comment: Item: 200 MECH -Rough 04/15/11 Inspector: sgremmer Action: Comment: 3rd floor rec rm in floor heat at 100psi Item: 220 PLMB - Rough /D.W.V. ** Approved ** 04/22/1 T Inspector: sgremmer Action: Comment: 4th floor only 04/29/11 Inspector: JRM Action: Comment: Item: 230 PLMB- Rough/Water ** Approved ** 04/22/1 T Inspector: sgremmer Action: Comment: 4th floor only 04/29/11 Inspector: JRM Action: Comment: Item: 190 ELEC -Final Item: 290 PLMB -Final Item: 390 MECH -Final Item: 532 PW -TEMP. C/O Item: 539 PW -FINAL C/O Item: 90 BLDG -Final PA PARTIAL APPROVAL AP APPROVED AP APPROVED AP APPROVED AP APPROVED PI PARTIAL INSPECTION PI PARTIAL INSPECTION AP APPROVED PI PARTIAL INSPECTION AP APPROVED REPT131 Run Id: 13314 07 -13 -2011 Inspection Request Reporting Page 5 4:46 pm_ Va CO - City Of Requested Inspect Date: Thursda�yy Julyy 14, 2011 Site Address: 1290 WES�THAVEN CR VAIL 1290 WESTHAVEN - CRAWLSPACE A/P /D Information Activity: B11 -0030 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: R -3 Insp Area: Owner: SEP -HAVEN LLC Contractor: HOEFT BUILDERS WEST INC Phone: 970 - 904 -1959 Description: COMPLETION OF UNFINSHED SPACE, FRAME, ELECTRICAL AWALARM, HEAT CONCRETE INSULATE DRYWALL CARPET. RELOCATION OF GUEST RdOM BATHOORM TO OTHER SIbE OF ROOM, NE'W ELECTRICAL CIRCUITS. REMOVAL AND REINSTALL ALL OLD PLUMBING FIXTURES FOR NEW. Requested Inspection(s) Item: 290 PLMB -Final Requested Time: 02:30 PM Requestor: Phone: Comments: 904 -1959 Assigned To: J GON Entered By: MHAEBERLE K Action: Time Exp: Inspection History Item: 30 BLDG - Framing ** Approved ** 04/22/11 Inspector: sgremmer Action: PA PARTIAL APPROVAL Comment: 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 50 BLDG - Insulation ** A proved ** 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 60 BLDG - Sheetrock Nail ** Approved ** 05/04/11 Inspector: sgremmer Action: AP APPROVED Comment: Item: 120 ELEC -Rou h ** Approved ** 04/21/1 i Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH -Rough 04/15/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 3rd floor rec rm in floor heat at 100psi Item: 220 PLMB - Rough /D.W.V. ** Approved ** 04/22/1 T Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 4th floor only 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 230 PLMB- Rough/Water ** Approved ** 04/22/1 T Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 4th floor only 04/29/11 Inspector: JRM Action: AP APPROVED Comment: Item: 190 ELEC -Final ** Approved ** 07/12/11 Inspector: sgremmer Action: AP APPROVED Comment: Item: 290 PLMB -Final Item: 390 MECH -Final Item: 532 PW -TEMP. C/O Item: 539 PW -FINAL C/O Item: 90 BLDG -Final REPT131 Run Id: 13316