HomeMy WebLinkAboutB11-0030************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R110000194 Amount: $1,546.19 03/21/201101:09 PM
Payment Method:Credit Crd Init: SAB
Notation: VISA - PATRICK
HOEFT
-----------------------------------------------------------------------------
Permit No: Bll -0030 Type: COMBINATION BLDG PERMIT
Parcel No: 2103 - 124 - 0300 -5
Site Address: 1290 WESTHAVEN CR VAIL
Location: 1290 WESTHAVEN - CRAWLSPACE
Total Fees: $11,113.30
This Payment: $1,546.19 Total ALL Pmts: $1,546.19
Balance: $9,567.11
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
PF 00100003112300 PLAN CHECK FEES 1,546.19
Department of Community Development
} � ,�„- , 75 South Frontage Road
y;
,` '; Vail, Colorado 81657"
Tel: 970 - 479 -2128
_} Web: www.vailgov.com
Development Review Coordinator
lit
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Project Street Address:
1290 Westhaven Circle
(Number) (Street)
Building /Complex Name:
Contractor Information
Business Name: Hoeft Builders West INC
Business Address: PO Box 6332
City Avon
Contact Name:
(Suite #)
State: CO Z ip: 81620
Patrick Hoeft/Hoeft Builders West INC
Contact Phone: 970 904 1959
Contact E -Mail: Patrick @hoeftbuilderswest.com
Contractor Registration Number: 1078 -B
X ,..�
Owner /Own is epresentative Signature (Required)
Project Information
Owner Name: 5ephaven LLU
Parcel #: 2103- 124 - 0300 -5
(For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit
www.eaglecounty.us /patie)
Project #: �l J I - o 6 I L , f u
DRB #: �� W
Building Permit #:
Lot #: Block # Subdivision:
Work Class: New ( ) Addition ( ) Alteration ( / )
Type of Building:
Single - Family ( ✓) Duplex ( ) Multi - Family ( )
Commercial( ) Other( )
Work Type: Interior (✓) Exterior ( ) Both (
Valuation of
Work Included Plans Included Work
Electrical (,/)Yes ( )No (V)Yes ( )No 15�
Mechanical ( )Yes ( )No (4 yes ( )No 77 00
Plumbing (,/)Yes ( )No (✓)Yes ( )No
Building (,/)Yes ( )No (✓fYes ( )No } QQ
Qn
Value of all work being performed: $ (.
(value based on IBC Section 109.3 & IRC Section 108.3)
Electrical Square Footage
Detailed Scope and Location of Work: Completion of unfinished space (DRB Approved), frame, electrical, AV /Alarm, heat
Concrete, insulate, drywall, carpet. Relocation of Guest room bathroom to other side of room (see plumbing drawings)
new electrical circuits (see electrical Drawing). Removal and re install of all old plumbing fixtures for new, new shower
pans, tile and cabinets throughout every bathroom.All fire sprinklers affected will accommodate all fire codes(See Plan)
(use additional sheet if necessary)
For Oftice se Only:
Fee Paid:
Received From:
Cash Check #
CC: Visa / C Last 4 CC # yc p exp date:
Auth # a ��
Date Received:
MAR 21 2011
TO WN OF V AIL
01- Jan -I 1
Indoor Environmental Services, Inc
Dba: Q Consulting, Inc.
Project: 1290 Westhaven Cir, Vail, Colorado
Asbestos Sampling Report — Page 1 of 2
March 15, 2011
Patrick Hoeft
Hoeft Builders West Inc
On March 14, 2011, Quentin Danziger conducted an asbestos inspection of the suspect
materials that will be affected by the planned remodel. This includes all texture,
sheetrock and joint compound in the affected areas. Asbestos was NOT found, as
described below.
Homogenous
Description
Number of
% Asbestos
Square
Type/Friable?
Area
Samples
Feet
01
Main House
3
Non Detect
Texture
02
Main House
3
Non Detect
Sheetrock/Joint
Compound
03
Caretaker
3
Non Detect
Texture
04
Caretaker
3
Non Detect
Sheetrock/Joint
Compound
BACKGROUND:
A remodel is planned. Indoor Environmental Services was requested to conduct an
asbestos inspection of the suspect materials throughout the Unit.
This inspection includes only suspect materials that are visible to the inspector. If other
suspect materials become visible during demolition, they must be sampled before they
are disturbed. Examples of suspect materials include but are not limited to: linoleum,
floor tile, ceiling tile, mastic, sheetrock, joint compound, roofing materials, etc. There are
over 3000 known asbestos containing materials.
Indoor Environmental Services, Inc
Dba: Q Consulting, Inc.
Project: 1290 Westhaven Cir, Vail, Colorado
Asbestos Sampling Report — Page 2 of 2
SAMPLING PLAN:
Colorado State Requirements - For each homogenous area of less than 1000 square
feet, a minimum of three samples must be collected in random areas. For each
homogenous area of 1000 — 5000 square feet, a minimum of five samples must be
collected in random areas. Areas of 5001 square feet or greater require a minimum of 7
samples. These laws are defined by the EPA (AHERA) and Colorado State Regulation 8.
Determination of homogenous sampling areas — Homogenous Areas are determined by
type of suspect material, texture, color and location.
Determination of random sampling areas — The samples were collected in a random
manner.
Thank you for using Q Consulting, Inc. We are proud to be your local indoor air quality
consultants. We look forward to working with you in the future.
Quentin Danziger, BS, CIE, ABI — Colorado Asbestos Inspector Certification # 12781
Indoor Environmental Services, Inc.
Dba Q Consulting, Inc.
970 - 390 -0087
QConsultingInc @yahoo.com
EMSL Analytical, Inc.
7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112
Phone: (303) 740 -5 700 Fax: (303) 741 -1400 Em ail: denverlab@errsl com
Attn: Quentin Danziger
Customer ID:
INES78
Q Consulting, Inc.
Customer PO:
PO Box 997
Received:
03/15/11 9:00 AM
Vail, CO 81658
EMSL Order:
221100822
Fax Phone: (970) 390 -0087
EMSL Proj:
Project: 1290 Westhaven Cir- Vail
Analysis Date:
3/15/2011
Test Report: Asbestos Analysis of Bulk Materials via EPA 600 /R- 93/116 Method using
Polarized Light Microscopy
Non - Asbestos
Asbestos
Sample Description
Appearance
% Fibrous
% Non- Fibrous
% Type
01 -01 main master bath
White
100% Non- fibrous (other)
None Detected
221100822 -0001 texture
Non- Fibrous
Heterogeneous
100% Non- fibrous (other)
None Detected
01 -02 main master bath
White
221100822 -0002 texture
Non- Fibrous
Heterogeneous
100% Non- fibrous (other)
None Detected
01 -03 main master bath
White
texture
Non- Fibrous
221100822 - 0003
Heterogeneous
100% Non- fibrous (other)
None Detected
02 -01- Texture main master bath
White
sheetrock/JC
Non- Fibrous
221100822 -0004
Heterogeneous
100 ° /d Non- fibrous (other)
None Detected
02 -01 -Joint main master bath
White
Compound sheetrock!JC
Non- Fibrous
221100822 -0004A
Homogeneous
02- 01- Sheetrock main master bath
Brown/W
10% Celiulose
85% Non- fibrous (other)
None Detected
sheetrock/JC
Fibrous
5% Glass
221100822 -00048
Heterogeneous
100% Non- fibrous (other)
None Detected
02-02-Texture main master bath
White
sheetrock/JC
Non- Fibrous
221 100822-0005
Heterogeneous
Initial report from 03/15/2011 14:11:03
Analyst(s)
Molly Walker (24)
Erin Orthun, Laboratory Manager
or other approved signatory
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written appro�el by EMSL. E
no responsibility for sample collection activities or analytical method limitations- Interpretation and use of test results are the responsibility of the client- This report must not be use
client to claim product certification, approwl, or endorsement by NVLAP. NIST or any agency of the federal govemment. Non - friable organically bound materials present a problem r
therefore EMSL recommends gravmetric reduction prior to analysis. Samples recened in good condition unless otherwise noted.
Samples analyzed by EMSL Analytical, Inc. Centennial, CO NVLAP Lab Code 200828-0
Test Report PLM- 7.23.0 Printed: 3/1512011 211:03 PM
0
EMSL Analytical, Inc.
7330 S. Alton Way Building 12 Suite A. Centennial, CO 80112
Phon (303) 740 -5700 Fax: (303) 741 -1400 Email:_ denveriabMemsi.com
Attn: Quentin Danziger
Customer ID:
INES78
Q Consulting, Inc.
Customer PO:
PO Box 997
Recei%ed:
03115. 9:00 AM
Vail, CO 81658
EMSL Order:
221100822
Fax Phone:
(970) 390 -0087
EMSL Proj:
Project: 1290 Westhaven Cir- Vail
Analysis Date:
3/15/2011
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R- 93/116 Method using
Polarized
Light Microscopy
Non - Asbestos
Asbestos
Sample Description
Appearance
% Fibrous
% Non- Fibrous
a/ Type
02 -02 -Joint main master bath
White
100% Non- fibrous (other)
(
None Detected
Compound sheetrock/JC
Nan - Fibrous
221100822 -0005A
Homogeneous
02- 02- Sheetrock main master bath
Brown/White
10% Cellulose
85% Non- fibrous (other)
None Detected
sheetrock/JC
Fibrous
5% Glass
221100822 -0005B
Heterogeneous
02- 03- Texture main master bath
White
100% Non- fibrous (other)
None Detected
sheetrock/JC
Non- Fibrous
221100822 -0006
Heterogeneous
02 -03 -Joint main master bath
White
100% Non- fibrous (other)
None Detected
Compound sheetrock/JC
Non- Fibrous
221100822 -0006A
Homogeneous
02- 03- Sheetrock main master bath
BrowniWhlte
10% Cellulose
85% Non- fibrous (other)
None Detected
sheetrock/JC
Fibrous
5% Glass
221100822 -00068
Heterogeneous
_
03-01 caretaker unit-
Tan/White
100% Non- fibrous (other)
None Detected
221100822-0007 texture
Non- Fibrous
Heterogeneous
Sample labeled 04 -01
Initial repo from 03(15/2011 14:11:03
Analyst(s)
Molly Walker (24)
Erin Orthun, Laboratory Manager
or other approved signatory
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. E
no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be use
client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non - friable organically bound materials present a problem i
therefore EMSL recommends gravlmetnc reduction prior to analysis. Samples received in good condition unless otherwise noted.
Samples analvzed by EMSL Analytical, Inc. Centennial, CO NVLAP Lab Code 200828-0
2
Test Report PLM- 7.23.0 Printed: 3/1512011 2:11:03 PM
EMSL Analytical, Inc.
7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112
Phone: (303) 740 -5700 Fax: (303) 741 -1400 Email: denveriab@emsl.com
Attn: Quentin Danziger
Customer ID:
INES78
Q Consulting, Inc.
Customer PO:
PO Box 997
Received:
03/15/11 9:00 AM
Vail, CO 81658
EMSL Order:
221100822
Fax
Phone: (970) 390 -0087 EMSL Proj:
Project: 1290 Westhaven Cir- Vail
Analysis Date:
3/15/2011
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R- 93/116 Method using
Polarized Light Microscopy
Non - Asbestos
Asbestos
Sample Description
Appearance
% Fibrous
% Non - Fibrous
% Type
03-02 caretaker unit-
Tan/White
100% Non- fibrous (other)
None Detected
221100822 -0008 texture
Non- Fibrous
Heterogeneous
Sample labeled 04 -02
03-03 caretaker unit-
TanfWhite
100% Non- fibrous (other)
None Detected
221100822 -0009 texture
Non- Fibrous
Heterogeneous
Sample labeled 04 -03
0401 - Texture caretaker unit-
Tan/White
100% Non- fibrous (other)
None Detected
sheetrock/JC
Non - Fibrous
221100e22-0010
Heterogeneous
Sample labeled 05-01
04-01 -Joint caretaker unit-
White
100% Non- fibrous (other)
None Detected
Compound sheetrock/JC
Non- Fibrous
221100822 -0010A
Homogeneous
04- 01- Sheetrock caretaker unit-
Brown/White
10% Cellulose
85% Non- fibrous (other)
None Detected
sheetrock/JC
Fibrous
5% Glass
221100822 -ooloe
Heterogeneous
0402 - Texture caretaker unit-
Tart/White
100% Non- fibrous (other)
None Detected
221100822 -0011 sheetrock/JC
Non- Fibrous
Heterogeneous
S amp l e lab 05-02
Initial report from 03/15/2011 14:11:03
Analyst(s)
Molly Walker (24)
Erin Orthun, Laboratory Manager
or other approved signatory
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. t
no responsibility for sample collection activities or analytical method limitations- Interpretation and use of test results are the responsibility of the client. This report must not be use
client to claim product certification, approval, or endorsement by NVLAP. NISI or any agency of the federal govemment. Non - friable organically bound materials present a problem i
therefore EMSL recommends gravmetnc reduction prior to analysis. Samples received in good condition unless otherwise noted.
Samples analyzed by EMSL Analytical, Inc. Centennial, CO NVLAP Lab Code 200828-0
Test Report PLM- 7.23.0 Printed: 3115 211:03 PM
3
' EMSL Analytical, Inc.
7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112
Phone: (303) 740 -5700 Fax: (303)741-WO Email: denveriab@emsl.com
Attn: Quentin Danziger
Customer ID:
INES78
Q Consulting, Inc.
Customer PO:
PO Box 997
Received:
03115/11 9:00 AM
Vail, CO 81658
EMSL Order:
221100822
Fax
Phone: (970) 390 -0087
EMSL Proj:
Project: 1290 Westhaven Cir- Vail
Analysis Date:
3/15/2011
Test Report: Asbestos
Analysis of Bulk
Materials via EPA 600/R- 93/116 Method using
Polarized Light Microscopy
Non - Asbestos
Asbestos
Sample Description
Appearance
% Fibrous
% Non - Fibrous
% Type
0402 -Joint caretaker unit-
White
100% Non- fibrous (other)
None Detected
Compound sheetrock/JC
Non- Fibrous
221100822 -0011A
Homogeneous
0402- Sheetrock caretaker unit-
BrownlWhite
10% Cellulose
85% Non- fibrous (other)
None Detected
sheetrock/JC
Fibrous
5% Glass
221100822 -0011e
Heterogeneous
0403 - Texture caretaker unit-
Tan/White
100% Non- fibrous (other)
None Detected
sheetrock/JC
Non - Fibrous
221100822 -0012
Heterogeneous
Sample labeled 05 -03
0403 -Joint caretaker unit-
White
100% Non- fibrous (other)
None Detected
Compound sheetrock/JC
Non- Fibrous
221100822 -0012A
Homogeneous
0403- Sheetrock caretaker unit -
Brown/White
10% Cellulose
85% Non- fibrous (other)
None Detected
sheetrock/JC
Fibrous
5% Glass
221100822 -00128
Heterogeneous
Initial report from 03115/2011 14:11:03
Analyst(s)
Molly Walker (24)
Erin Orthun, Laboratory Manager
or other approved signatory
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. E
no responsibility for sample collection actiWties or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be USE
client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal goeemment. Non - friable organically bound materials present a problem r
therefore EMSL recommends grammetric reduction prior to analysis. Samples received in good condition unless otherwise noted.
Test Report PLM- 7.23.0 Printed. 311512011 211:03 PM
THIS IS THE LAST PAGE OF THE REPORT- 4
, 07 -11 -2011 Inspection Request Re orting Page 4
4:31 pm Vail, CO - City O
Requested Inspect Date: Tuesdayy, July 12 2011
Site Address: 1290 WESTHAV�N CR VAIL
1290 WESTHAVEN - CRAWLSPACE
A/P /D Information
Activity: 611 -0030 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type: Occupancy: Use: R -3 Insp Area:
Owner: SEP -HAVEN LLC
Contractor: HOEFT BUILDERS WEST INC Phone: 970 - 904 -1959
Description: INSULATE( COMPLETION OF ( CARPET RELOCATION OF GUEST RQOM / BATHOORM TO OTHER SIbE OF
ROOM, NEW ELECTRICAL CIRCUITS. REMOVAL AND REINSTALL ALL OLD PLUMBING FIXTURES FOR
Reauested Insoectionls
Item: 190 ELEC -Final Requested Time: 11:30 AM
Requestor: Phone:
Comments: 904 -195
Assigned To: AGON Entered By: MHAEBERLE K
Action: Time Exp:
Inspection History
Item:
30 BLDG - Framing
** Approved **
04/22/11 Inspector:
sgremmer
Action:
PA PARTIAL APPROVAL
Comment:
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
50 BLDG - Insulation
** Approved **
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
60 BLDG - Sheetrock Nail
** Approved **
05/04/11 Inspector:
sgremmer
Action:
AP APPROVED
Comment:
Item:
120 ELEC -Rou h
** Approved **
04/21/11 Inspector:
sgremmer
Action:
AP APPROVED
Comment:
Item:
200 MECH -Rough
04/15/11 Inspector: sgremmer Action:
Comment: 3rd rec rm in floor heat at 100psi
PI PARTIAL INSPECTION
Item:
220 PLMB - Rough /D.W.V.
** Approved **
04/22/1 T Inspector:
sgremmer
Action:
PI PARTIAL INSPECTION
Comment: 4th floor only
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
230 PLMB- Rough/Water
** Approved **
04/22/1 T Inspector:
sgremmer
Action:
PI PARTIAL INSPECTION
Comment: 4th floor only
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
190 ELEC -Final
Item:
290 PLMB -Final
Item:
390 MECH -Final
Item:
532 PW -TEMP. C/O
Item:
539 PW -FINAL C/O
Item:
90 BLDG -Final
REPT131 Run Id: 13311
0742 -2011 Inspection Request Reporting Page 5
4:26 Dm Vail, Co _ City Of
Requested Inspect Date: Wednesdayy JulyY 13 2011
Site Address: 1290 WEST�iAVEN G VAIL
1290 WESTHAVEN - CRAWLSPACE
A/P /D Information
Activity: B11 -0030 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type: Occupancy: Use: R -3 Insp Area:
Owner: SEP -HAVEN LLC
Contractor: HOEFT BUILDERS WEST INC Phone: 970 - 904 -1959
Description: COMPLETION OF UNFINSHED SPACE, FRAME, ELECTRICAL AWALARM, HEAT CONCRETE
INSULATE DRYWALL CARPET. RELOCATION OF GUEST RdOM BATHOORM TO OTHER SIbE OF
ROOM, NEW ELECTRICAL CIRCUITS. REMOVAL AND REINSTALL ALL OLD PLUMBING FIXTURES FOR
NEW.
Requested Inspection(s)
Item: 390 MECH -Final
Requestor:
Comments: 904 -19
Assigned To: GON
Action Time Exp:
Requested Time: 08:30 AM
Phone:
Entered By: MHAEBERLE K
fe2
Insaection Histo
Item:
30 BLDG - Framing
** Approved **
04/22/11 Inspector:
sgremmer
Action:
Comment:
04/29/11 Inspector:
JRM
Action:
Comment:
Item:
50 BLDG - Insulation
** Approved **
04/29/11 Inspector:
JRM
Action:
Comment:
Item:
60 BLDG - Sheetrock Nail
** Approved **
05/04/11 Inspector:
sgremmer
Action:
Comment:
Item:
120 ELEC -Rough
** Approved **
04/21/17 Inspector:
sgremmer
Action:
Comment:
Item:
200 MECH -Rough
04/15/11 Inspector: sgremmer Action:
Comment: 3rd floor rec rm in floor heat at 100psi
Item:
220 PLMB - Rough /D.W.V.
** Approved **
04/22/1 T Inspector:
sgremmer
Action:
Comment: 4th floor only
04/29/11 Inspector:
JRM
Action:
Comment:
Item:
230 PLMB- Rough/Water
** Approved **
04/22/1 T Inspector:
sgremmer
Action:
Comment: 4th floor only
04/29/11 Inspector:
JRM
Action:
Comment:
Item:
190 ELEC -Final
Item:
290 PLMB -Final
Item:
390 MECH -Final
Item:
532 PW -TEMP. C/O
Item:
539 PW -FINAL C/O
Item:
90 BLDG -Final
PA PARTIAL APPROVAL
AP APPROVED
AP APPROVED
AP APPROVED
AP APPROVED
PI PARTIAL INSPECTION
PI PARTIAL INSPECTION
AP APPROVED
PI PARTIAL INSPECTION
AP APPROVED
REPT131 Run Id: 13314
07 -13 -2011 Inspection Request Reporting Page 5
4:46 pm_ Va CO - City Of
Requested Inspect Date: Thursda�yy Julyy 14, 2011
Site Address: 1290 WES�THAVEN CR VAIL
1290 WESTHAVEN - CRAWLSPACE
A/P /D Information
Activity: B11 -0030 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type: Occupancy: Use: R -3 Insp Area:
Owner: SEP -HAVEN LLC
Contractor: HOEFT BUILDERS WEST INC Phone: 970 - 904 -1959
Description: COMPLETION OF UNFINSHED SPACE, FRAME, ELECTRICAL AWALARM, HEAT CONCRETE
INSULATE DRYWALL CARPET. RELOCATION OF GUEST RdOM BATHOORM TO OTHER SIbE OF
ROOM, NE'W ELECTRICAL CIRCUITS. REMOVAL AND REINSTALL ALL OLD PLUMBING FIXTURES FOR
NEW.
Requested Inspection(s)
Item: 290 PLMB -Final Requested Time: 02:30 PM
Requestor: Phone:
Comments: 904 -1959
Assigned To: J GON Entered By: MHAEBERLE K
Action: Time Exp:
Inspection History
Item:
30 BLDG - Framing
** Approved **
04/22/11 Inspector:
sgremmer
Action:
PA PARTIAL APPROVAL
Comment:
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
50 BLDG - Insulation
** A proved **
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
60 BLDG - Sheetrock Nail
** Approved **
05/04/11 Inspector:
sgremmer
Action:
AP APPROVED
Comment:
Item:
120 ELEC -Rou h
** Approved **
04/21/1 i Inspector:
sgremmer
Action:
AP APPROVED
Comment:
Item:
200 MECH -Rough
04/15/11 Inspector:
sgremmer
Action:
PI PARTIAL INSPECTION
Comment: 3rd floor rec rm in floor heat at 100psi
Item:
220 PLMB - Rough /D.W.V.
** Approved **
04/22/1 T Inspector:
sgremmer
Action:
PI PARTIAL INSPECTION
Comment: 4th floor only
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
230 PLMB- Rough/Water
** Approved **
04/22/1 T Inspector:
sgremmer
Action:
PI PARTIAL INSPECTION
Comment: 4th floor only
04/29/11 Inspector:
JRM
Action:
AP APPROVED
Comment:
Item:
190 ELEC -Final
** Approved **
07/12/11 Inspector:
sgremmer
Action:
AP APPROVED
Comment:
Item:
290 PLMB -Final
Item:
390 MECH -Final
Item:
532 PW -TEMP. C/O
Item:
539 PW -FINAL C/O
Item:
90 BLDG -Final
REPT131 Run Id: 13316