DN Install all terminations sgremmer 08/15/2012 A000153
084
AP sgremmer 08/16/2012 A000153
130
Total Rows: 2
Page 1
NOTE: THIS PERMIT MUST BE POSTED ON JOBS/TE AT ALL T/MES
.�
TUWNOFVAII, '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f. 970.479.2452 inspections. 970.4792149
MECHANICAL PERMIT
ASFR
Job Address: 115 FOREST RD VAIL
Location.....: 115 FOREST ROAD
Parcel No...: 210107113030
OWNER 115 COMPANY 03/31/2011
4960 S LAFAYETTE LN
ENGLEWOOD
CO 80113
APPLICANT CONCEPT MECHANICAL INC
TIMOTHY ROSEN
PO BOX 1825
AVON
CO 81620
License: C000003079
CONTRACTOR CONCEPT MECHANICAL INC
TIMOTHY ROSEN
PO BOX 1825
AVON
CO 81620
License: C000003079
03/31/2011 Phone:970-949-0200
03/31/2011 Phone:970-949-0200
Desciption: NEW SINGLE FAMILY RESIDENCE
Valuation: $90,000.00
Permit #: M11-0034
Project #: PRJ10-0195
Status . . . : ISSUED
Applied . . : 03/31/2011
Issued . . : 04/27/2011
Expires . .: 10/24/2011
..�....,...,.,�<......�.,,��.......��.*.,�***,............,�......�**�......,..>�x,�....FEE SUMMARY��........�*,.�..**.>.....»>..�.��......,+,+«��,t.,*�< .................................«�
Mechanical Permit Fee---> $1,800.00 Will Call------------> $5.00 Total Calculated Fees---> $2,255.00
Plan Check-------------------> $450.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $2,255.00
Total Calculated Fees--> $2,255.00 Payments----------------> $2,255.00
BALANCE DUE---------> $0.00
....,........*>,..»,........,.,�....»....«+<.....�..�#........«.......�**,.�**..�.+.......�.,......�......��......,��.<,�.....:..*........«......�.....,�����,�...#.....�.� ...............�......
APPROVALS
Item: 05100 BUILDING DEPARTMENT
04/25/2011 JRM Action: AP
......,.....,, .............>..,..,......�.,...�.,,,.....».�..�......,.,.....,+.,.�....�.�<...........<..,�,..�.�,......�.<........�.,..�..,..�.�.�.��.�«.,...,.,.,...�.......�........��.......,.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315
....��,.....,,..., .................,.........�,,.....»...................�«�..»...�.......................��..*�.�....�..,....�....«.,.�...�..�...,+«..,�..............,....,,...»»,..,.........,..
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
me c h ca n i ca I_pe rm it_041908
✓ANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:Oi
�'` - � �-a'//
Da e
******************************+*+****************************�*****************************+
TOWN OF VAIL, COLORADO Statement
*******+************************************************************************************
Statement Number: R110000359 Amount: $2,255.00 04/27/201101:56 PM
Payment Method:Credit Crd Init: SAB
Notation: VISA-TIMOTHY
ROSEN
-----------------------------------------------------------------------------
Permit No: M11-0034 Type: MECHANICAL PERMIT
Parcel No: 2101-071-1303-0
Site Address: 115 FOREST RD VAIL
Location: 115 FOREST ROAD
Total Fees: $2,255.00
This Payment: $2,255.00 Total ALL Pmts: $2,255.00
Balance: $0.00
********************+*******************************+***+***********+***+*******************
ACCOUNT ITEM LIST:
Account Code
--------------------
MP 00100003111100
PF 00100003112300
WC 00100003112800
Description Current Pmts
------------------------------ ------------
MECHANICAL PERMIT FEES 1,800.00
PLAN CHECK FEES 450.00
WILL CALL INSPECTION FEE 5.00
�:�� �
�` ��.�-�• �`'
.. . .:>
' .�
!�
�QW�T QF �f�I,' .
:� .
.1 � ]w
. �
,�,j��,Y��,��� Departmen�of Community Development;
,
.
�; ,� � �1��.,� . . � 7�5 South Frnntage Road
" . 1 .. �, .. I�.,N\ . � ' �' � ' !
, � , . ; .�sx '' •• .. �� , . Vail; �olorado..81�657:
•. ;. = ���rlt�•, �ny',�'>.�C.-�;�''^� .;,. �Tel: 9?0-479-2128:
. � - , . ,,,� ,,�'i , 's'�,�'� � ; .� - � � - `FaX: 970-479-24�5Z
:' � � ''eSr J' � •
� =%`.�•j. �'°�� � .. - . `- Web: www.vailgov:;com�
�,; _ . " y_... ; ��� . . ,
�• - �;�,: - , Q�yelopment Review Coordinator
'��i:"+�.`'�. . . '� •;!j ,' .
MECHANICAL PERMIT
Boiler / Furnace & Fire�lace Ao�lications MUST include:
Complete Mechanical Room Floor Plan with Dimensions
Combustion Air Duct Size and Location
Flue detail or Vent size, location & termination
Gas Piping layout including development length calculations
�' Heat Loss Calculations �-�� ��P�
Project Street Address:
� �/ �S f' %C�' Ci r (
(Number) (Street) (Suite #)
Building/Complex Name: / �.' 1�"� T� ��E��l �]`��x�
Contractor Information:
Company: �,.CJ �l C -� �' %�"�i' t"Li�C�1 /C d l ��.
Company Address: � �• (,�''�',��/ �j�
City: v� �� State: � Zip: �Z("J
Contact Name: / �� � /�G� �, �" 6��
Contact Phone: ���C `yC� y�"n �
E-Mail ���d ��L'�i�'L'l� L`i. ��?/�' �(�v -
(;°t� fYt�' .�f' i? � ' � n
Town of Vail C r ctor Regi ion o.: �� y�--/��
%� ��'�'��� ` � � C _
Contractor Signatur required)
Property Infor ation
Parcel #: ��D � C", �l l ,3 C� ,�C�
(For parcel #, contact Eagle County Assessors Office at 970-328-8640 or
visit www.eaglecounty.us/patie)
Tenant Name:
(Commercial Properties)
Owner Name: �t V� � L� `�„!�� !2, �
Complete Valuation for Mechanical Permit: (including fireplaces)
Mechanical $ �� � �
��a55
C:\cdev�forms\permits\building�nechanical�ertnit_010110
,� Baler size & efficiency ���� �, T
❑ Equipment Cut Sheets for Fir�places/Log Sets�Z�
�Manuraaurers �rtto s�iannng maice, rnoaei t�
Office Use:
Project#: ��S/f�"��Q�J
Building Permit #: __� � �— � 3 � 3
Mechanical Permit #: m� ��' [� � 3�
Block # Sv4�division:
Define Scope and Location of Workf CC! ��� / f
C��� ����� �J �-�/S 'i� � 1C. � a /:1 C.� i ���
��f '�'f" i�lL��r%`• u�t �'
rnf L�r�� o,�� C'�t �' `�- .�i2� l�
(us� �onal sheet if necessary) ���`, j�
/ �" '% !1'�. �f t,�'�". � �'Z,t� �?h�15 .
� Gas Piping Include ���, l�a J/����� ��
r�' Gas Piping by Others �
❑ Wood to Gas Fireplace Conversion
Boiler La�6on:
Intenor Ex�tenor ( ) Other ( )
Number o Existing Fireplaces:
Gas Appliances Gas Logs d/P,ellet
�it!/ � c^si5�
Number of Praposed Fireplaces:
Gas Appliances Gas Logs � Wood/Pellet
Type o� Build+
Single-Famity,(JQ Duplex ( ) Multi-Family ( ) Commercial ( )
�� �
Restauramt ( ) O�er ( )
Date Received:
1���oe�
MAR 3 0 2011
TOWN OF VAIL
ISION 15 MECHA1vICAL
Copyright 2010 - Rader Engineering, Inc.
SECTION 15000--SYSTEM OVERVIEW
1. It is the intent of these specifications to outline the anticipated mechanical
systems. The successful contractor shall be responsible to size all equipment,
provide equipment specifications and coordination drawings showing the intent
of the system. These specifications are a supplement to K.H. Webb Architects'
specifications. If there aze any conflicts between the h,vo specifications address
any questions to the Architect. Equipment manufacturers listed shall be included
as the base 6id. Contractors may propose alternate equipmendsystems to the
base bid as an alternate price to the base bid.
2• A peer review will be performed by Rader Engineering, Inc, and K.H. Webb
Architects. The mechanical contractor shall provide the following information
for review:
❑ Boiler piping schematics.
o Equipment specifications.
❑ Equipment locations with access requirements.
❑ Coordinated duct routings and register sizing.
❑ Calculations.
o Sequence of Operation.
o Mechanical room layout.
❑ Combustion air sizing and location.
❑ Flue sizing and routing.
❑ T'hermostat locations.
❑ Manifold locations.
❑ Radiant zone schedule with tubing lengths and centers.
Rader Engineering has performed load calculations for the home and they are as
follows. These output loads shall be used for sizing the boilers and heating
equipment. Also see Heat Loss Summary for loads for individual rooms.
a. The building heat loss is 90,000 BTU/H. T'he heat loss calculations are
based on a window U-value = 0.3 and a sliding door U-value = 0.35.
b• The domestic water heating load is 75,000 BTU/H.
c• The kitchen make-up air load is 8�,400 BTU/H. This is based on 1200
CFM.
d. The snowmelting load is 437,000 BTU/H. T'his allows for 3336 square
feet at 131 BTLT/H/SF.
10/11/10
115 Forest Road
15000-1
e�
��
j :'
�
il I
fij :�i
i� ,
�
t
s
�_,
4. A central boiler heating system, consisting of two high efficiency condensing
boilers (B-1 & B-2), shall be installed to provide heat for space heating, domestic
hot water, and kitchen make-up air system. Include a boiler control which shall
stage/modulate boilers based on demand. The base bid shall be for two (2)
Triangle Tube Prestige Solo 175 boilers for �t�pg�it of �40 MBH.��!
�Iaximwn load diversity (unders�gg) allaw�,�°�sx�t��s�vill be�
- � ._._. ��:� z .,��t� � ,�rr,�.. �
Fconsidered. �r�'
T'he heating system will be designed to maximize the boiler efficiency by
allowing the system to operate below condensing temperatures (less than 130
degree return water temperature or lower) at all times except during a call for
domestic water heating. During a call for domestic water heating the boiler(s)
shall be ramped up to 160 degrees. Include a condensate neutralization basin.
Terminate flues above the roof, per manufacturer's installation instructions.
Boilers shall be located in the Mech Room.
5. A central boiler heating system, consisting of two high efficiency condensing
boilers (B-3 & B-4), shall be installed to provide heat for the home's snowmelt.
Include a boiler control which shall stage/modulate boilers based on demand.
The base bid shall be for one (1) Triangle Tube Prestige Solo 399 boiler and one
(1) Triangle Tube Prestige Solo 175 for
Alternate boilersiwill ke_considered bui�iisf�He�u 'u`mu�"mbine� input:�
The heating system will be designed to maximize the boiler efficiency by
allowing the system to operate below condensing temperatures (less than 130
degree return water temperature or lower) at all times. Include a condensate
neutralization basin. Terminate flues above the roof, per manufacturer's
installation instructions.
6. The home is to be heated by a radiant floor system throughout. Radiant shall be
the 1�` stage of heat where supplemental heating is provided. The tubing shall be
installed in the concrete slab or in a concrete topping slab. Provide individual
loop balancing valves as provided by the tubing manufacturer to adjust the flow
rate to each loop. Do not install tubing under built-in cabinets. Tubing shall be
run under all bath tubs and under all showers and e�ctend into benches of the
showers. Tubing shall also be run into closets associated with the Bedroom
zones.
Include temperature reset controls to automatically adjust radiant floor heating
water temperatures based on outdoor temperatures. Manifold locations must be
coordinated with, and approved by, the Architect. Locate all radiant zone valves
in the mechanical room. A common supply pipe can be run to serve all zones
but individual dedicated return lines (one per zone) will be required to be "home-
run" to the mechanical room.
10/ 11 / 10 115 Forest Road 15000-2
/�
�
The heating zones are as follows. Zones that require supplemental heating are in
boldface.
l. Vestibule 101, Storage 111
2. Rec Room 103, Steam Shower 106
3. Pool Room 104
4. Bathroom 5 105, Water Closet 107
5. Closet 108, Bedroom 5 109
6. Storage 221
7. Vestibule 201, Hall 204, Laundry 210
8. Bedroom 2 205, Closet 209
9. Bathroom 2 206, Shower 207, Water Closet 208
10. Bedroom 3 211, Closet 212
11. Bathroom 3 213, Tub 214, Shower 215, Water Closet 216
12. Bedroom 4 217, Closet 218
13. Bathroom 4 219, Shower 220, Water Closet 221
14. Vestibule 301, Ha11307, Powder 312
15. Kitchen 304, Living/Dining 305
16. Bedroom 1 308
17. Bathroom 1 309, Shower 310, Water Closet 311
18. Storage 313
19. Entry 401
20. Mudroom 404
21. Garage 405
7. Supplemental Heating for the Kitchen/Living/Dining zone shall be via FC-1 Fan
Coil which shall serve multiple functions, as follows:
a. Supplemental Heat (90% Return/ 10% OSA)
b. Kitchen Make-up Air (100% OSA)
Fan Coil shall be sized for 1200 CFM at 0.5" ESP. Provide a 2-speed motor to
allow low speed operation in supplemental heating modes and high speed
operation in kitchen make-up air mode. Provide outside air louver and mixing
box with OSA and RA dampers.
Supply Air shall be provided in the Dining Room, Living Room and Kitchen.
Fan coil shall be located in the mechanical room, storage room or in the crawl
space (contractor to determine). Fan coil shall be a vertical type unit, set on a
rubber isolation pad. Duct connections to the fan coil shall be made with flexible
���vas connector�,�.:�,,,�,��
�y
8. ., = There will be no air conditioning in the home.
���
10/11/10 115 Forest Road 15000-3
9. The temperature control system desired by the home owners shall be simple to
use. The base system shall be based on Tekmar TN�. Include a simple user
switch to set entire home into setback mode. Owner shall approve temperature
control system before purchasing.
10. The domestic water heating system shall be supplied from the central boiler
system (B-1 & B-2). Provide 2 indirect water heaters with a storage capacity of
95 gallons each, Triangle Tube Smart 100, or equal. Each indirect water heater
shall be individually pumped on the boiler side. The system shall be capable of
supplying approximately 300 gallons of 105 degree water in 10 minutes.
Domestic water heaters and recirculation system shall be connected to Tekmar
TN4 control system and shall automatically go into an unoccupied mode when
the home is in unoccupied mode.
Include a domestic hot water recirculation system that shall be capable of
providing hot water to every bathroom fixture within approximately 5 seconds.
Water Heaters shall be located in the Mech Room.
11. Snow-melting is desired for the following areas. Refer to the attached Snowmelt
Area Schedule for more detailed information.
Zone 1
SA-1 Auto Court
SA-2 Driveway & Bridge
SA-3 Stairs (Auto Court to Forest)
Zone 2
SA-4 Dining Deck
Zone 3
SA-5 Hot Tub Deck
Zone 4
SA-6 East Deck (Future) — Rough-in only
Each zone shall have a dedicated pump and there shall be manual controls
included for each zone to disable zone if desired. Each zone shall be on its own
stand alone snowmelt controlled system, and shall include its own moisture/
temperature sensor. Snowmelt system shall be filled with a 45% propylene
glycoV 55% water solution with corrosion inhibitors.
10/11/10 115 Forest Road 15000-4
��
,
1;
12•
All supply, return and bathroom e�chaust grilles shall be Titus CT series or
equivalent. All floor grilles shall be pencil proof and shall have flangeless
frames. All wall and ceiling grilles shall be flanged fiames. Size for NC of 25
maximum in bedrooms and 30 maximum in living areas.
13. One Energy Recovery Ventilator, ERV-1, shall be included in this home. Locate
ERV-1 in the mechanical room or crawl space. ERV shall be Lossnay LGH-
F470RX3-E with PZ-41 SLB-E controller, 470 CFM @ 0.96" SP, or equal. Unit
shall have built-in by-pass damper and controls for free cooling mode (bypass
heat exchanger). During bypass mode, both supply and exhaust fans shall
continue to run. Outside air and exhaust air to/from the exterior shall be ducted
to louvers on the outside wall. Inside the building, exhaust shall be from each of
the following rooms, as follows:
a. Bath 1
i.
ii.
Main 47 CFM
Water closet 47 CFM
b. Bath 2
i. Main 47 CFM
ii. ��Vater closet 47 CFM
c. Bath 3
i. Main 47 CFM
ii. Water closet 47 CFM
d. Bath 4
i. Main 47 CFM
ii. Water closet 47 CFM
e. Bath 5
Total
94 CFM
94 CFM
94 CFM
94 CFM
94 CFM
470 CFM
6" diameter duct
5" diameter duct
5" diameter duct
6" diameter duct
5" diameter duct
5" diameter duct
6" diameter duct
5" diameter duct
5" diameter duct
6" diameter duct
5" diameter duct
5" diameter duct
6" diameter duct
Inside the building, fresh air (supply air) grilles shall be located in the following
rooms:
a. Bed 1
b. Bed 2
c. Bed 3
d. Bed 4
e. Bed 5
94 CFM (size for 114 CFM*) 7" diameter duct
94 CFM (size for 114 CFM*) 7" diameter duct
94 CFM (size for 114 CFM*) 7" diameter duct
94 CFM (size for 114 CFM*) 7�� uiameter duct
94 CFM (size for 114 CFM*) 7" diameter duct
Total 470 CFM
* Due to extra 100 CFM provided by the HF-1 humidification fan (see section
below).
ERV shall be connected to Tekmar TN4 system so that it runs continuously
during occupied mode and is off during unoccupied mode.
10/ 11 / 10 115 Forest Road 15000-5
ERV shall be hung from ceiling structure with either rubber-in-shear isolators or
spring vibration isolators. Duct connections to the ERV shall be made with
flexible canvas connectors. Include backdraft dampers on the two dischazge
ports of the ERV.
14. Humidification shall be provided by a stand-alone system, consisting of HF-1
humidification fan and H-1 humidifier. Fan shall be sized for 500 CFM. Steam
type humidifier shall be used, manufactured by Nortec or equal. Unit shall be
equipped with a steam distribution tube installed in the supply ductwork.
Humidifier will have a capacity of lO lbs/hr minimum.
Locate HF-1 and H-1 in the mechanical room or crawl space. HF-1 shall supply
100 CFM to the ERV-1 supply duct (that also serves the bedrooms). The
remaining 400 CFM shall be tied onto the supply duct of FC-1 fan coil. Include
back draft dampers at the tie-in points of these "cross-over" ducts.
Controls shall be included to automatically reset the indoor humidity levels
based on outdoor temperatures. Include a high limit duct-stat downstream of the
steam injection tube. Include air proving switch.
Include drain pans (with water sensors) under the humidifiers and a water tight
stainless steel duct section with supplemental drain where the steam is injected
into the ductwork.
15. The kitchen hood shall be e�chausted by a side-wall mounted remote blower,
1200 CFM actual airflow. Duct size shall be 10" diameter minimum.
16. Provide a 200 CFM fresh air supply fan into the mechanical room, with pressure
relief to the outside or to the crawl space. Fan shall each be controlled by a
cooling thermostat.
17.
18
Provide Panasonic bath e�aust fans for the bathroom Powder 312, which is not
served by the ERV. Fan shall eachaust 70 CFM.
Provide a 200 CFM fan in garage for general exhaust. Fan shall be activated by
the garage door opener and shall run for approximately 10 - 30 minutes (adj).
10/11l10
, _ ���..
115 Forest Road
15000-6
HEAT LOSS SUMMARY
JOB NAME: 115 Forest Road
JOB NUMBER: 10065.00
DATE: 10/6/10
CALCS BY: JAH
ROOM
101 - Vestibule 1
103/6 - Rec Room
104 - Pool Room
105/7 - Bathroom 5
108/9 - Bedroom 5
110 - Mech Room
111 - Storage
201 - Vestibule 2
203 - Stairs
204 - Hall
205/9 - Bedroom 2
206/7/8 - Bathroom 2
210 - Laundry
211/2 - Bedroom 3
213/4/5/6 - Bathroom 3
217/8 - Bedroom 4
219/20/21 - Bathroom 4
«< - ��vra e
301 - Vestibule ;
303 - Stairs
304 - Kitchen
305 - Dinin /Livi
307 - Hall
308 - Bedroom 1
309/10/11 - Bath
312 - Powder
313 - Storage
401 - Entry
403 - Stairs
404 - Mudroom
d(i.ri _ (:�r�nc
1
TOTALS / AVG'S.
� RADERx
��� ENGINEERING • COMFORT SYSTEMSM
HEATING WATER DT 20
HEATING WATER % P.G. 30
HW GLYCOL FACTOR �,pg
FLOOR AREA EFFECTIVE HEATING
SF AREA SF MBH BTU/SF GPM
35 35 0.1 3 0.01
•`�5 451 8.9 20 0.94
256 256 2.6 10 0.28
61 35 0.6 17 0.06
255 225 3.7 16 0.39
�� 196 0.9 5 0.10
� 64 0.3 5 0.03
30 30 0.1 3 0.01
90 90 0.3 3 0.03
115 115 0.4 3 0.04
330 320 4.8 15 0.51
120 58 1.4 24 0.15
93 38 0.3 8 0.03
330 330 5.3 16 0.56
120 57 2.1 37 0.22
300 300 5.5 18 0.58
135 81 1.5 19 0.16
55 55 0.2 4 0.02
31 31 0.1 3 0.01
90 90 0.3 3 0.03
230 131 4.7 36 0.50
600 600 14.7 25 1.56
100 100 1.8 18 0.19
305 288 4.9 17 0.52
125 80 1.7 21 0.18
37 27 0.7 26 0.07
150 83 0.9 11 0.10
145 145 4.9 34 0.52
90 90 1.2 13 0.13
160 86 2.6 30 0.28
725 725 12.9 18 1.37
5212 � 90
SNOWMELT AREA SCHEDULE
JOB NAME: 115 Forest Road
JOB NUMBER: 10065
DATE: 10/6/2010
CALCS BY: DGD
CONSTANTS
5/8" PEX
50% GLYCOL
100 F AVG TEMP
ZONE
1
AREA
Deck
VARIABLES
BTU/H/SF �3�
DELTA T 30
GLYCOL FACTOR 1,1q
LENGTH TO MANI 5 (one way)
AREA
184
189
s� RADER�
�• � ENGINEERING • COMFORT SYSTEMS�
BTU/H I GPM I SPACING I TOTAL LENGTHI # OF LOOPS I LOOP LENGTH GPM/LOOP PRESS DROP/LOOP
9
9
1479 � 6 256 1 8
120 1 130 0 9
344 2 . 182 1.3
2.0
5.4
14.5
�
ACCESSORIES
�O I��� SCt"'1� J./ I.FJ� � I- HIGH ALTITUDE KIT 4- NOT U3ED
2- GSD-I GONTROLS 8- NOT USED
3- A3ME RATED lH-STAMP) 6- NOT U°vED
Sl'M. TYPE Sl. INPUT ALT OUTPI.lT FUEL DELTA � ELEG. MANUFACTURER AFLIE AGCESSORIES
�gE�g) MBH MBH T �� i MODEL
B-1 t 2 STAINLESS NAT. �m 12(d/I TRIANC�LE TUSE i, 2, 3
lHOUBE) GONDENSINC� ��0 13� CsAS 30 � 2 A SOLO 1�5 g5�°
STAINLESS NAT. � 120/1 TRIANCxLE TUBE L 2, 3
(SNOIU"IELT) CONDENSINCs 399 30� C�AS 30 ry� 2,4 SOLO 399 95qa
STAINLESS NA7. 12m/1 TRIANC�LE TUBE �- �- 3
l.°,NO�II�'IELT) CONDENSINGc ��� 13� CxAS 30 `�� 2 A SOLO 1�5 95�'0
� E�EER�•'�0� ST��
4fd�o9fd HIGHWAY 6, SUITE E-1
P.O. BOX 8610 AVON, GO 8162m
(9"I(d) 8�5-�910 (9'i0) 845-1522
115 FOREST ROAD RESIDENCE
115 FORBST ROAD
VAII.,COLORADO
DATE: Im/m6/1m
JOB ": 10�65.00
DRAWd BY: DGD
CI-IEGKED BY: SJH
SGALE: NA
M1.2