HomeMy WebLinkAboutB09-0078 B09-0078: Entries for Item:90 - BLDG-Final 15:27 09/19/2013
Action Comments By Date Unique_
Ke
CR 1)SAFETY GLASS REQUIRED AT UPPER cg 11/13/2009 A000129
LEVEL BEDROOM WINDOWS WITHIN 18" 660
OF FLOOR
2)FIRE SPINKLER FINAL REQUIRED
3)CORE/SHELL FINAL TCO FOR
EXTERIOR REQURIED
CR COMPLETE ITEM 1 cg 11/23/2009 A000129
952
AP cg 11/24/2009 A000130
000
Total Rows:3
Page 1
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
:
�wxo�v�¢ �
Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657
p.970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT MF BUILD PERMIT Permit #: B09-0078
Project #: PRJ09-0130
Job Address: 610 W LIONSHEAD CIR VAIL Status. . : ISSUED
Location......: UNIT 24,LANDMARK Applied . . : 05/05/2009
Parcel No....: 210106307024 Issued... : 07/22/2009
Expires. ..: 01/18/2010
OWNER MANN,JOSEPH P.,JR 8�ALEXSA 05/05/2009
24884 ELECTRIC DR
BAY VILLAGE
OH 44140
APPLICANT ALTER DESIGN BUILDERS LLC 05/05/2009 Phone:476-4033
5500 W. HOWARD ST.
SKOKIE
IL 60077
License:352-A
CONTRACTOR ALTER DESIGN BUILDERS LLC 05/05/2009 Phone:476-4033
5500 W. HOWARD ST.
SKOKIE
IL 60077
License:352-A
Description:
INTERIOR REMODEL&ADDITION(UNIT 24)
Occupancy: R-2 Valuation: $9,000.00
Type Construction:IllA Total Sq Ft Added: 285
................................................................„.,............. FEE SUMMARY ......,..,.............,,,,........«.,....,.......,...........,,.......,..,.,..,.
Building Permit Fee---> $167.25 Will Cal Fee-----------------> $4.00 Total Calculated Fees---------> $564.96
Plan Check----------------> $108.71 Use Tax Fee---------------> $0.00 Additional Fees----------- $0.00
----->
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES---------> a564.96
Investigation--------------> $0.00 Recreation Fee--------------> $285.00
Payments-- ---------------> 5564.96
Total Calculated Fees--------> $564.96 BALANCE DUE�--------------------> ;0.00
++:rsrw+�+R�.it�t:xrx,r�sr,r+w�x+xa�:�iixrr,rewi��+rxrrx::::��x,rrrrww�ti►Ntxr��:�:e����xrxxtt�rww�.:::w:�e,er,ewwrxwrtr�itrtw�,r+xx�xrx+w��t�tt►irt,e►x�w,e�w���►�:»rtti:::++rs,eterr�x������x�
DECLARATIONS
I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information
as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure
according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTI N SH BE E TW� -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 -4'OOP .
`�' � ��U�
ig ature ner or Con ractor Date
l w,, E� �r f�S C, I
Print Name
bld_alt construction_permit_041908
•w��ttt��:rr���r���xr�i�xxww�:::h�:exw�+:w:»e+ww�►:::ti��exwww►xxr+►r:►::t+ttt��wwww����+t:ttttiet��wek��:►ww::��rww►�re,ti.t�:rht��iMx��x�r�:��:t►ttr�r�e�e+��w����+��►w��::this
APPROVALS
Permit#: B09-0078 as of 07-22-2009 Status: ISSUED
•�:�.,'rxr��,eeyrxt��xir,r,etrx+��wwtrr,e+rwv.�t�xttr��,rerw���s.�ie:xwew�t�t►�:►rxwxxxr��r�������.e�::�wxr►rrtwrttirrxeww���w�wx:tttrirrkwwwv.�t�xt:�xrrrexx�rw,rx�,t�r:�::zewwxwwx+x��:xr�:�xr:i
Item: 05100 BUILDING DEPARTMENT
05/14/2009 MH Action: CR
F:\CDev1CHRIS\PERMIT.COMMENTS\B09-0094\609-0075-0096.DOC
07/20/2009 martin Action: AP
Item: 05400 PLANNING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
05/11/2009 drhoades Action: AP Changes to any
unit that requires modification of the sprinkler system
shall require an individual permit. These changes may be
reflected on a master set of stamped drawings and shall
include hydraulic calcualtions as well as being stamped
by the Fire Protection Engineer of record.
The fees shall be such that only one review fee shall be
assessed for the master set of stamped plans, however,
individual unit permits will then be assessed permit fees
based on an hourly rate (3 hours minimum).
"'*One permit shall not be issued for all units, as this
would prohibit finaling the permit until all units had
been completed."*
•�»�ix��w:xi�xw�x���:w�r����k:��:�ww�:wtiri��wrr,rr+w��������xxxrs.:wr:e,r,ewrv.rr,vrr►rtv.�+��w�x:::w,t,t+riir,rerrr��+ttr�i��xw�:�t:»iree,erre��arttt��x�i:�+Mwwx�+iw:::::rxrew:���,r�w�,er+te���
See the Conditions section of this Document for any that may apply.
bld_alt construction�ermit_041908
•t��tw�ewww�:�tt:�xr�wwxti:*�eewxr�♦i�ew�:�::w►terewwxrtte��►ww�ve�+:♦:�rfwx►ww�x�tt:�:►tew*rr�w►tx►�rrerr��:fi�t�*wrwr+wt»►teeewx+�w►rir:�:eexxtwrwxxrh:zzee���wxw����::te:�:»��
CONDITIONS OF APPROVAL
Permit#: B09-0078 as of 07-22-2009 Status: ISSUED
•►�a:wwwtt+�frt►►frew*��+x*xwwrt�wyx*►►xxx�**t�*frre��wt*f,tf�ww��w*x***x***►e*v�y����fr�*irxt�rt+r�*�+tfrx�.irfxw�re�r♦#�*ifrx�x+r��,t+►t�tr**wxsrwrrk�w**tf�Rfrererrr�+Nt�►►wxx��x►r+:�»*��►�.wwy
Cond: 12
(BLDG.): FIELD iNSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.):ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 40
(BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72.
Cond: CON0010689
Changes to any unit that requires modification of the
sprinkler system shall require an individual permit. These
changes may be reflected on a master set of stamped
drawings and shall include hydraulic calcualtions as well
as being stamped by the Fire Protection Engineer of
record.
The fees shall be such that only one review fee
shall be assessed for the master set of stamped plans,
however, individual unit permits will then be assessed
permit fees based on an hourly rate(3 hours minimum).
"One permit shall not be issued for all units, as this
would prohibit finaling the permit until all units had been
completed."
Cond: 39
(BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED
TO MEET SECTION R310 OF THE 2003 IRC OR SECTION 1025 OF THE
2003 IBC.
bld_alt_construction�erm it_041908
*********�*s***************************r**�************************************��********�**
TOWN OF VAIL, COLORADO Statement
�**«*****���*********��************�*�********���+«*******�***��**�*********+*��*********�**
Statement Number: R090000890 Amount: $564.96 07/22/200902:55 PM
Payment Method: Check Init: JLE
Notation: 41857 ALTER
DESIGN BUILDERS
-----------------------------------------------------------------------------
Permit No: B09-0078 Type: ADD/ALT MF BUILD PERMIT
Parcel No: 2101-063-0702-4
Site Address: 610 W LIONSHEAD CIR VAIL
Location: UNIT 24, LANDMARK
Total Fees: $564.96
This Payment: $564.96 Total ALL Pmts: $564 .96
Balance: $0.00
****r�*��******************************r*r****s***�****r*********�*********�****************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 167.25
PF 00100003112300 PL�N CHECK FEES 108.71
RF 11100003112700 RECREATION FEES 285.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
. . . ,: ,� T. � ___. --�—
, �
Y� � i� � � " ��' � ���� �����a �'� �� �x? s x"� � : � �� � ��
� ,�� ���� �� ���`�t �
� � �,
��'� ��`������`'��'4<'�����r���;� �d y�"��"���.x. � �*�. ��' �r„ 1���y�,....
�,-� ,� �, ti �k�� � �� a. ��.
'4 " C�.e.� �' F"��hh'u° L��
_ ��TM#'a � 6F ,..a'�t� � 4 ;µ . - :_ _,
� � °��' � # �, 7,�. .•'�5.�th F tag��
�1 - '�.,� � P + Y �9, '���*•
,� �� �ii '+� . � �: g '"; � ? � '� �•� ..-`�
��� ,r. � 4, .�� 3 ��'� � � ��' � A'
•,x' � �'.� � .J
£� �
�F :a.
+- ti k,,,�. � < ,�`, -
��`� ,.r
;
'a
�`�- , `�s„ ` .'-,�"` .. �'. • . �` «
� t` �, t. ���. ° c
�;y . ._-,�s e
w ��
� �''.
BUILDING PERMIT APPLICATION
Separate permits are required for electrical, plumbing, mechanical,fireplace, etc.
Project Street Address: Office Use:
610 West Lionshead Circle Unit 24 Project#: �3�
(Number) (Street) (s���#) DRB#: �I J�W�C.J�'�j 1
Building/Complex Name: The Landmark Condominiums guilding Pertnit#:� � �./l/� �
Contractor Infortnatlon:
Lot#:1 Block#� Subdivision:�,��L � �G�
Company: Alter Design Builders 3
Company Address: 5500 W. Howard St. Detailed Description of Work: Interior Renovation of
City: Skokie State: IL Z;p; 60077 West Tower Unit 24 with added bath&flex space.
Contact Name: Howard Olsen
Contad Phone: 970 476-4033
holsen alter rou CO�I (use additional sheet if necessary)
E-Mail � 9 p•
Town of il ntractor Registr 'on No.: 352-A
Work Class:
New( ) Addition( ) Remodel( �) Repair( ) Other( )
X _--�_' Work Type
Co tractor Signature(required) Interior(✓) Exterior( ) Both( )
Property Infortnation Type of Building:
Parcel#: 210106307024 Single-Family( ) Duplex( ) Multi-Family(�)
(For parcel#,contact Eagle County Assessors Office at 970-328-8640 or
visit www.eaglewuty.us/patie) Commercial( ) Other( )
Tenant Name:
Does a Fire Alarm Exist? Yes( �) No( )
Owner Name: .loseph MBnn Monitored Alarm? Yes(�) No( )
Does a Sprinkler System Exist? Yes(� ) No O
IN PROCESS
Valuations(Labor&Material)) #&Type of F�cisting Fireplaces: Gas Appliances 1
Gas Log Wood/Pellet Wood Buming
Building: $ $8,000.00
Plumbing: $ $0.00 #�Type of Proposed Fireplaces:Gas Appliances
'Gas Log Wood/Pellet Wood Buming
Electrical: $ $1,000.00
Mechanical: $ $0.00 Date Received:
Total: $ $9,000.00 f� � (� � �/ �
DLS L5
APR 3 0 2009
TOWN OF VAIL
� �
VIJ�FlRF
� Vail Fire Department
Asbestos Testing �Abatement Requirements
Asbestos testing and abatement protects workers,homeowners,neighbors and emergency services responders from
exposure to harmful asbestos.The Town of Vail asbestos abatement program is in addition to the State of Colorado's
regulations.It is your responsibility to be in compliance with the State.Please contact the State directly for their
requirements at the contact info listed below.
When is asbestos testins� required?
ANY building projects disturbing more than these threshold levels of building materials require
asbestos testing:
One-and Two-Family Dwellings: 30 square feet
All Others: 160 square feet
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified
and Vait-registered abatement contractor.An asbestos abatement permit must be approved,
and the clearance letter must be submitted to the Town of Vail before the building permit will be
issued.
Project Checklist
My project falls into the category checked below:
❑ wll not disturb more than the threshold limits identified above
$� Tested negative, or at 1%or below(2 copies of test results included)
❑ Tested positive at more than 1%, requires abatement(2 copies of test resufts
included
Tips 8 Facts:
• Even recent construction projects may indude asbestos�ontaining materials,so buildings of�age
requine testing.
• The"1989 Ban"on asbestos-containing materials is commonly misunderstood."In fact,in 1997 the U.S.
Fifth Circuit Court of Appeals vacated much of the so-called"Asbestos Ban and PhaseouP'rule and
remanded it to the EPA.Thus,much of the original 1989 EPA ban on the U.S.manufacturing,importation,
processing,or distribution in commerce of many asbestos-containing product categories was set aside and
did not take effect."-CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail,
Community Development, 75 S Frontage Rd,Vail, CO, 81657.
Town of Vail Contact: State of Colorado Contact:
David Rhoades, Fire Inspector Colorado Department of Public Health
Vail Fire Department and Environment
75 S Frontage Rd Asbestos Compliance Assistance Group
drhoades@vailgov.com 303-692-3158
970�77-3454 asbestos@state.co.us
www.vailgov.com www.cd he.state. � � � n � �
u
� o �009
Town of Vail APR 3
OFF��� �OPY NoF �A��
-row
� "��
i
1 + i� '
�
�� ���
� Town of Vaii
O�� �
��� �j
. �PY
A & D Asbestos Testing and Consu tuig
John R. Peterman
:�����:�����*
P.O. Box 1230 � Clifton,CO. 81520-1230
. Cell 970-270-3689 Home Phone 970-464-5265
INSPECTION REPORT PREPARED FOR:
Destination Resorts � � � � � �
610 W. LionsHead Circle D
vail, Co. 81657 APR 3 0 2009
LOCATION: TOWN OF VAI L
The LandMark �
610 W. LionsHead Circle
�7ai1,CO. 81657
REPORT PREPARED BY: . �
John R. Peterman
Inspector Manager .
Certificate Na 6601 .
;
;
. ;
2 �
I
i
�
�
s � � . .
'
A & D Asbestos Testing and Consultin
g
John R. Peterman
Asbestos Testing,Project Desiga,and Consulting
INTRODUCI'ION: �
On August 22nd, 2006, an inspection/survey was conducted and 20
bulk samples were collected from the:
The LandMark ,
610�W. Lionsiiead Circle
Vail,CO. 81657
The purpose of the inspection/survey was to locate and sample
suspected asbestos containing materials that might be present in the
Residence that is planned for demolition.
The inspection was mad.e, and the samples were collected by John R
Peterman, an A.H.E.R.A. and State of Colorado Certif'ied,Asbestos
Inspector. Great care was taken durin�g the inspection and sampling to be as
accurate as possible. It should be noted ifiat minimal damage v�,� done to
the existing building struchues during the inspection so there is no
documentation for unseen conditions or stored items.
All samples were analyzed by DCM Science Lab in Wheatridge,CO.
This laboratory is deemed `�roficient"in the E.P.A.Quality A►ssurance(QA)
program for the determination of asbestos in bulk materials, and is
accredited by the American Hygiene Association (AHA),
SAMPLING PROTOC4L:
A random sampling scheme was used to sample the suspect materials that
were discovered. If during any fut�e�olition or renovation work,
suspect material is discovered that hasn't been sampled and would be
disturbecl, work should be halted until t6e material has been tested.
3
� �
Y , _
A & D Asbestos Testing and Consulting
John R. Peterman
AsbestosTesting, Project Design, and Consulting �
The LandMark
610 W. LionsHead Circle
Vail, CO. 8165?
BUII,DING DESCRIPTION:
The LandMark consists of two multi-story baildings with a connecti.ng
underground parking garage. T6e Tower Building is the east building with
seven stories, and a garage level. 'The Town House building has single level
units on the fust floor, and loft units on the tip levels. This survey covers
the inside of the buildings. The interior walls are covered in sheetrock with
a light texture, and wood paneling. Note: In some areas a texture has been
iroweled over the original futisli. The ceilings are sheetrock with a heavy
spray-on texture, and twin tee ooncrete with the same spray-on texture. The
basement area has suspended ceiling tiles throughout,and most have been
replaced not long ago. The older tiles were tested in the Billy's Grill area.
�e floors are covered with carpet,ceramic tiies, and sheet vinyl flooring.
The sheet vinyl was not tested in this survey. The heating is provided by
baseboard heating, and fireplaces. No suspect ther�mat system insulation was
observed during dus inspection. The garage ceiling had a spray-on fire
proofing that was mostly removed prior to this inspecCion.
CONCLUSIONS AND RECp��IlVIE1vDATTONS:
Presumed Asbestos containiag ri�terials,present in the buildings, are as
follows:
1. Spray-on ceiling texture �
2. Sheet vinyl flooring
3. Exterior siding board
4
� _
r . ,•
A & D Asb�sstos Testing and Con�ulting _
John R. Peterman
AsbestosTesting, Project Design, and Consulting
Laboratory Analysis of the bulk samples collected during dus inspection
indicate that Asbestos was detected in all of the composite sheetrock
samples. However, the Asbestos content is less than the Regulatory Limit
(Greater thau 1%Asbestos). The Asbestos content of the samples was
� verified by the Required Point Count Analysis. The samples collected were
taken from the original areas of the buildings. If conditions are encountered
that aze not the originat construction, additional testing or documentation
may be requued. If the renovation work will impact on the three presumed
Asbestos containing materials listed, the p.A,C.M. mnst be handled as per
Colo. Reg.#8 prior to disturbance of the materiats.
s
oata: august ��, zoos
Location: The LandMark, 610 W. LionaHead Circle, Vail, CO. 81657
SAMPLE LOCATIONS
7
�
3
4
6
6
7
8
9
10
11
12
13
14
1b
16
17
18
19
20
SAMPLE NUMBER AREA SAMPLE REMOVED FROM
LM-B
LM.•B
LM•B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
LM-8
�1�8
LM-B
LM-B
LM-B
LM-B
LM-B
LM-B
�M-B
LM-B
LM-B
001
OOZ
003
004
005
006
008
009
010
O�1
012
013
014
O15
ois
017
018
019
020
Glarage Cslling By Lobby Entranoe
Qany�Cellin�By S.Exit Doo�
Qareqs CNitny By Entry Qate
Lobby Area Bitly'a Qr[tl
Lobby Area Btlly'a Qrfli
Lobby Ana Bllly's Grlll
Tower#�705 W.Bsdroom Closet
Tower#1601 E.Bedroom Closet
Towe�#504 Upstai�s W.Bed�oom Closet
Towsr#�402 E.8sdroom Closst
Tower�305 W.Bsdroom Closet
Tower#�2Q3 E.Bedroan Closet
Towsr�t101 W.Bsdroom Cloaet
Tower#13 W.Bedroom Closet
Towe��F27 Upsta(rs N.Bsdroom Closet
Tower�i11 HaltVvay Storage Closat
Tower�25 Upstalrs S.Bedroom Closet
Tower#�18 Maln Floor Bed�oom Closst
Towsr#2 E.Bedroom Closat
Tower�i16 Hailway Closet by Kltchen
DESCRIPTION
8pray-on FlnproHing
8prayon Flroproffing
Spray-on Finproftiny
Cslling Tile
C�iling Ttls
Ceilin�Tlls
Composita Sheetrock w/L.t.Tsxture
Composit�Shsstrock w/I.t.Tsxtun
Composit�Shestrock w/Lt Texturo
Compoaite Shestrock wlLt.Texture
Composlts Shwtrock w/LL Texture
Compoalts 8heetrock w/L�Textun
Compos(te Sheetroak w/Lt.Texture
Composite Shsetrock w/L�Textura
Composlts 8hestrock w/!.�Texture
Composits Shestrock w/Lt.Texturo
Camposite Shestrock w/Lt.Texturo
Composita Shsstrock w/L�Texture
Composite Sheetrock w/Lt.Texturo
Compos[ts Sheetrock w/Lt.Texture
FRIABLE
YES
YE8
YES
YES
YES
YES
NO
NO
NO
NO
NO
NO
NO
NO
NO�
NO
NO
NO
NO
NO
Date: August??, 2006
Location: The LandMark, 610 W. LlonsHead Clrcle, Vail, CO. 81657
SAMPLE RESULTS:
1
2
3
4
5
6
7
9
10
t1
12
13
14
15
16
17
18
19
20
KEY:
SAMPLE NUMBER DESCRIPTION
LM-B
LM-B
LM•B
LM-B
LM-8
lM-B
LM•B
LM-B
LM•B
LM-B
LM-B
!.M-B
LM-B
LM-B
LM-B
LM•B
LM-B
LM-B
LM-B
LM-B
001
002
009
004
005
006
007
009
010
011
012
Oi3
014
01b
018
017
018
019
020
Spray-on Ftroprotfing
3pray-on Ftroprotftng
3pray-on Firoprofftng
Csiltng Tils
Celling Tils
Csiltnp Ttie
Composite Shsetrock w/Lt.Texture
Camposita Sheetrock w/Lt.Texture
Composit�Shsetrock w/Lt T�xturo
Composite Shsstrock w/Lt.Texture
Composits 8heetrock w/Lt Texture
Composits 8heetrock w/Lt Texturo
Composite Sheetrock w/L��Texturo
Composits Shestrock w/L�Texturs
Composite Shostrock w/L�Texture
Composfte Shoetrack w/Lt.Texture
Composita Sheetrock w/Lt Texturo
Compostte 3heetrock w/Lt Texture
Composlt•Shestcock w/Lt T�xture
Composite Sheetrock w/Lt.Texture
CHRY-Chrysotlle
NAD-No Asbestos botected
PC•Potnt CouM Analysla
ASBESTOS iYPE
NAD
NAD
NAD
NAD
NAD
NAD
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRY/PC
CHRYlPC
CHRY/PC
CHRY/PC
CHRY/PC
CHRYlPC
CHRY/PC
CHRY/PC
96
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.02
0.01
0.01
O.a2
0.01
0.02
0.01
0.02
0.02
0.02
0.01
0.02
0.04
Date: August ??, 2006
Loaation: The LendMark, 610 W. LlonsHead Circle, Vail, CO. 81657
POTENTIAL FOR DISTURBANCE
Sampte Number Accessibility
Yea/nc
1 LM-B 001 YES
2 LM-B 002 YES
3 LM-B 003 YES
4 LM-B 004 YES
6 LM-B 005 YES
6 LM-B 006 YES
7 LM-B 007 YES
8 LM-B 006 YES
9 LM-B 009 YES
10 LM-B 010 YES
11 LM-B 011 YES
12 LM-B Oi2 YES
13 UN-B 013 YES
14 LM-B 014 YES
16 LM-B 016 YES
16 LM-B 016 YES
17 LM-B 017 YES
18 LM-B 018 YES
19 LM-B 019 1FE3
20 LM-B 020 YES
KEY:
MOD-Moderate
Potential
contact
LOW
LOW
�ow
MOD
MOD
MOD
HIQH
NIGH
HIGH
HlGH
HIGH
HlCiH
HICiH
HIQH
HIGH
HIGH
HIGN
HIGH
HIOH
HIGH
Influenca
vlbratlon
LOW
LOW
�ow
LOW
LOW
I.OW
LOW
LOW
LOW
LOW
�ow
LOW
LOW
LOW
�ow
LOW
LOW
I.OW
LOW
LOW
Potentlal
atr erosion
LOW
LOW
�ow
�.ow
LOW
LOW
LOW
LCW
LOW
LOW
�ow
�ow
LOW
LOW
�ow
LOW
LOW
LOW
LOW
LOW
0
Located fn Plenum
yes/no
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
�
�
Dats: August ??, 2006
Locatton: The L.andMark, 610 W. LlonsHead Ctrcle, Vail, CO. 81657
SUSPECT MATERIA►L CONDITIONS
SAMPLE NUMBER
1 lM-B 001
2 LM-B 002
3 LM-B 003
4 LM-B 004
6 LM-B 005
B LM-B 006
7 LM-B 007
8 LM-B 008
9 LM-B 009
10 LM-B 010
11 LM-B 011
12 LM-B 012
13 LM-B 013
14 LM-B 014
1S LM-B 016
18 LM-8 016
17 LM-B 017
18 LM-8 018
19 LM•B 019
20 LM-B OZO
KEY:
TYPE OF SUSPECT
MATERIAL
SUR
SUR
SUR
MISC
MISC
MI$C
8UR
SUR
8UR
SUR
3UR
$UR
SUR
SUR
SUR
SUR
SUR
8UR
8UR
SUR
SUR-Surfacing
MISC-Mtscellaneous
PHYS-Physicel
OVERALL CONDRION DAMAQED 96 TYPE OF DAMA�E
POOR
POOR
POOR
COOD
GOOD
QOOD
GOOD
GOOD
QOOD
GOOD
QOOD
POOR
POOR
POOR
GOOD
C300D
GOOD
QOOD
QOOD
GOOD
YES
YES
YES
NO
NO
NO
NO
NO
NQ
NO
NO
NO
NO
NO
NO
NQ
NO
NO
NO
NO
100.00 PHYS
100.00 PHY3
100.00 PHYS
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
O.QO WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00 WA
0.00. WA
0.00 WA
0.00, WA
0.00 WA
0.00 WA
a
CLIENT:
A 8c D ASH83TOS TSSTlNC3&CONSULTINO
633 361/4 ROAD '
PALISADB,CO 81526
DCM SCIBNCE LABORATORY,INC.
12421 W.49TH AY8NCJ8,UN1T#6
WHEAT RIDGH,CO 60033 (303)463-8270
BULK ASHESTOS TEST RBPORT
PAfiB 1 OF S
ANALYSI3 DATB: 8-25-06
REPORTINO DATE: 8-28-06
RBCEIPT DATE: 8•23-06
CLIBNT JOB NO.: THE LANDMARK
PROJECT 71i'L& 610 W.I,IONSHEAD CR.-VAII„CO 81657
DCMSL PROJEGT: ADAT289
PERCENTAGE COMPOSTITON BY VISUAL ESTIMAT$
DCMSL CLIENT TOTAL
TOTitL p�C�A��
SAMPLB SAMPLB SAMPLE PERCSNT ASBBSTOS ASBBSTOS OTHER FIBRQU3 NON-FIBROUS IDBNTIFIBp
NUMBER NUItiIDER ' DATE DESCRIPTION • OF SAMPLE TYPE RAN(}E 4�6 IN SAMpLE CON3TttUENTS CONSTITIJBNTS MATEtuql,g
-1 LM-B-001 8-22-06 A. GItEY PIBROt13/MULTTG'OLORED 100.0°/. ND 90.0 10.0 100.0
DEHRIS(n .j,�
-2 LM-B-002 8-22-06 A. GRBY FIDROUS/MIJLTICOIARID ]00.0°�i ND 94.0 6.0 100.0
DEBRIS(� �
-3 LM•H-003 6-22-06 A. C}It,�Y F[BROU3/C3REY itESIN(n 100.OSS ND 78.0 22.0 300.0
' . ND '
-'� iM-B-00,4 B-22-06 A. WH1T,8 PAINT " 3.0°b NP 0.0 100.0 100.0
B. TAI3 PERT.ITIC CEILINCi TII.B � 97.0'/. � ND • 75.0 25.0 100.0
ND
�S .LM-B-0OS . . ........8-22-06 ...A. 4VHITBPAINT ..... : . . . ..........................4.0% ..........,.....,.................................ND..,...,....,,.............,,.........,.......,...................0.0 .,.....,....................100.0 ....... .............100.0 •
B. BROWN CBILIN(3 TILB 96.OS6 ND 300.0 0.0 100.0
. ND
-6 LM-B-006 8-22-06 A. WH1TE PAINT 2.0% ND OA 100.0 100.0
B. TAN PERLTfIC CEILINCi TII.B 98.0'/s ND 73.0 27.0 100.0
ND
•7 LM-B-007 8-22-06 A. WHTfE PAIIVT � 2.0°� � ND � OA 100.0 100.0
B. WHI'IB DRYWALL MUD 2.0% CHRYSOTILE (TR-1J 0.5. 0.0 99.5 100.0
C. TAN FIBROtJ3 4.0°� ND 100.0 0.0 100.0
D. WHI'TEDRYWALL � 92.0°/. ND • 1.0 99.0 300.0
<0.1 �
, -8 LM-B-008 8•22•06 A. aREY DRYWALL MUD 1.0% ND 0.0 100.0 100.0
B. WHfCH PAINT 1.0% ND 0.0 ' 100.0 100.0
C. WHITBDRYWALLMiJD • 3.0'A CHRYSOTILE [TR-I] 0.5 • 0.0 99.5 �pp,p
D. TAN FIHROUS 12.OY. ND 100.0 0.0 100.0
. �E. WHITB DAYWALL .' 83.09L .' ND _ ' TR 100.0 100.0
<0.1
a
CI.IENTe
A&D ASBBSTOS TBSTINa&CONSULTIIVG
6S3 36!/4 ROAD
PALISADB,CO 81526
DCM SCiHNCB LAHORATORY,INC.
' 12421 W.49TH AVENiJE,UtQIT p6
WFIEAT RIDCiE,CO 80033 (303)463-8270
BUI.K ASBBS'I'OS TfiST RSpORT
PA(}8 2 OF S
ANALYSIS DATS: 8•23-06
REPOR'TIIdG DATE: 8-28-06
RECEIPT DATB: 8•23-06
CLIENT JOB NO.: '1Y;g LANpMARK
PROJECT TI7i,8: 6l0 W.LIONSHEAD(�t,-VAIL,CO 81657
DCMSL PROJECT: � ADATZ89
PERC&NTAGE COMPOSI7'ION BY VISUAL ESTZMATB
DCMSL CLIENT TOTAI.
SAMPLH SAMPLB gAlvtpl,g T�T!�' PBRCENTACiE
PERCENT ASBESTOS ASBESTOS OTHER FIBROUS NON-FIBROUS IDENT[FIED
NUMBER NUMBEEt DATB DESCRIP'TtON OF SAb�LB TYPE RANCB °.r. IN SAMPLE �NSTIIVENI'S CONSTI'TUF.M'S MATBRIAIS
-9 LM-8-009 8-22-06 A. WHI?E DRYWALL MUD I.O�i6 CHILYS017I.S [TTt 1] 1 A
B. WHT7'B PAINT 0.0 99.0 100.0
• 2.OY. ND 0.0 100.0 100.0
C. TANFIBROUS IS.OSG ND 100.0 0.0 100.0
D. WHfTEDR1'WAI.L 82�0% ND 1.0
99.0 100.0
<0.1
-10 LM-B-010 8-2Z-06 A. WHTTE PAIIVT
. B. WHITB,DRYWALL MUp
C. TAN FIHROUS
A WHfT�DRYWALL
•11 LM-B-0I1 B•22-06 A. TANPAINp
B. WHT!'E DRYWALL MUD
G TAN FIBR:OUS
D. WH17'EDRYWALL
-12 LM-B-012 8-22.p6 A, WHa'TE PA�NT
. B. WIiITE DRYWALL MUD
, C. TAN FIBROUS
D. w'H1TB DRYWALL
-13 LM-B-013 8-22-06 A. VV};�PAIIVI'
� B. WHTi'E DRYWALL MUD
C. TAN FIBROUS
D. WHITB DRYWALL
1.094
2.0% CHRYSOTILE 'jTR.I]
25.OY.
72.07�i
2.034
3.0'Yo Ci�tYSOTII.B [TR-lj
5.045
90.0°r�6
1.0%
2.09�6 CHRYSOTILE j'f'R-1]
6.0'�L .
91.0'�6 '
z.a,�
4.0'�e CI�tYSOTILE '[TR-1]
12.09�5
a2.a,c
� 0.0
0.5 ' 0.0
� 100.0
� 1.0
<0.1 �
� 0.0
1.0 0.0
� 100.0
ND �
<0.1
ND
1.0
ND .
ND
<0.1
rrn
0.3 '
ND
xn
<0.1
0.0
0.0
100.0
1.0
0.0
0.0
100.0
a.o
100.0 100.0
99.5 300.0
0.0 100.0
99.0 l00.0
100.0 100.0
99.0 100.0
0.0 100.0
��•� 100.0
100.0 100.0
99.0 100.0
0.0 100.0
99.0 �pp,p
100.0 1U0.0
99.5 100.0
0.0 100.0
99,0 �pp,p
Y�
' I
�
CI.[EIVT:
, A 8c D ASB83TOS TESTINd&CON3ULTQ10
653 361/4 ROAD
PALISADB,CO 81526
DCM SCIHNCB LABORATORY,iNC.
12421 W.49TH AVBTNB,UNTT#6
WHEAT RIDCiE,CO 80033 (303)463-8270
BULIC A38ESTOS TEST REPORT
PACiS 3 OF S
ANALY3IS DA'['E: 8•23-06
REPORTINCi DATE: 8•28-06
RECEiP1'DATB: 8•23-06
CLIBNT JOS NO.: THB LANpMARIC
PROJECT'lTTLS: 610 W.WONSHBAD CR.VAIL,CO 81657
DG'MSL PR07EGT: ADAT289
PERCffi�TAGS COMPOS1Ti0N 8Y VISUAL ESTJMATB
�
TOTAL
DCMSL CLIENT TOTAL PBRC$NTAGB
�M�'� s�L� $�� PERCENT ASBESTOS ASBBSTOS OTHER FIHROUS NON.PIBROUS IDENTTFIgD
NUMBER NUMBER DATE DESCRIPTION OF SAMPLB TYPB RANGB % IN SAMPLE CONSTTfUBNfS CON3TITUENTS MATEgiAL,S
-14 LM-H-014 8-22-06 A. WHPfE PAINT 3.03ro ND 0.0 100.0 100.0
B. WHJ'PEDRYWALLMUD 4.0% CHI2YSOTA.S [TR-lj 0.5 0.0 99.5 100.0
C. TAN FIBROUS 12.09L ND 100.0 0.0 ]00.0
D. WfiTfBDRYWALL 81.0% IJD 2.0 98.0 ]00.0
<0.1
-15 IM-$-0i3 8-22-06 A. WHTIEPAINT 2.09G ND 0.0 100.0 100.0
. B. WH1TE DRYWALL MUD ' 3.0% CHItYSOTILE [TR-1] 0.5 ' 0.0 99.5 100.0
C. TAN FIHROUS 6.0% ND 100.0 0.0 100.0
+ D. WHftE DRYWALL 89.O�G ND . 2.0 98.0 100.0
� �0.1
-16 LM-B-Ol6 8-22•06 A. WHTfEPAINT
. B. 1VH1TE DRYWALL MUD
G TAN PIHROUS
D. WHlTE DRYWALL .�..
-lT LM-B-017 8-22-06 A. WHITEPAINT
B. WFI1T$DRYWALL MUD
, C. TAN FIBROUS
D. WH]TB DRYWALL
-18 LM-B-018 8-22-06 A. WHTfE DRYWALL MUD
� B. �VFIT!'E PAINT
C. 'TAN FlBROUS
D. WHTI'B DRYWALL
S
1.0°i6 �
2.ON, CHRYS0ITLE [T'R-1J 1.0
4.0°i6 � ND
93.0'/0 � �p
<0.1
2.0°h �
3.0°K CHRYSOTILE [TR•1] 0.3
6.OSG . . �
89.0% � � '
<0.1
1.0% CHRYSOTILE ('!'R-Ij 0.3 �
2.09'0 � � '
4.0% • �
93.055 ND
• <0.1
0.0
0,0
100.0
2.0
0.0
0,0
100.0
2.0
0.0
0.0
100.0
2.0
300,0 100.0
99.0 100.0
0.0 100.0
98.0 100.0
100.0 100.0
99.3 100.0
0.0 100.0
98.0 � 100.0
99.5 100.0
300.0 � 300.0
0.0 100.0
98.0 100.0
�
CLIEN7':
A 6c D ASBfiST03 T84T'Afa dc CONSULTINC}
653 361/4 ROAD
PALISA,DE,CO 81526
DCM SC�ICB I.ABORATORY,INC.
12421 W.A91'FI AVENU$LJNTf A�6
vVHEAT RIDOE,CO 80033 (303)463-82�0
BULK ASBESTOS TBST RBPVRT
PAC38 4 OF S
ANALYSi9 DATB: 8•23-06
RBPORTINCi A,RTE: 8•28-06
RECEIPT DATE: 8•23-06
CLIBIJT JOB NO.: THg LAND1yARIC
PROJEGT TITLE: 610 W.L[ONSHEAD CR.•VAIL„CO 8165?
DCMSL PROlBCT: ADAT289
PBRCENTAGE COINPOSTi'ION BY VISUAL ESTIMATE
TOTAL
DCMSL CLIENT. � 'POTAL PEACENTAGB
SAMPLE SAMPLB SAMPLE PERCFNT ASBESTOS ASB&STOS OTHER FISROUS NON-FIBROUS TDBKClg[ED
h1UMBER NUI�ER DATE DESCRIPTlON OF SAMPLB TYpg RANGE 94 IN SAMpLE CONSTTTUENTS CONSTITIJENT3 MATERIpyS
-19 LM-B-019 8-22-06 A. WEiLTE DRYWA,LL MUD 1.056 G'IiRYSOTiLE Il-S] 1.0 • 0.0 99.0 100.0
H. TAN AND WHITE PAINT 2.0'/o ND 0.0 100.0 1n0.0
C. TAN FIBROUS S.OSi ND 100.0 0.0 100.0
D. WHiTl3DRYWALL 92.O�h ND 2.0 98.0 100.0
<0.1
-20 LM-B-020 8-22-06 A. WH11E PAIIdT
. ; B. TAN FIBROiTS
C. WHTfE DRYWALL MUD
D. Wi�TE DRYWALL
FOR CrU,Ci.TLATlON PURPOSES.TRACE(TR)IS ASSUM�TO BE 0.53L.
(n-INSEPARABLB LAYF.RS ND-NONB DETEGTi3D
�
9
9
1.09G
S.0°� '
7.0% CHRYSO'!�S [TR'1]
87.0°i6
� 0.0
ND 100.0
0.5 0.0
� . 2.0
' <0.1
u
100.0 100.0
0.0 , 100.0
99.3 100.0
98.0 100.0
�
� . � ,
' DCM SCIENCE LABORATORY,INC.
-. iZ421 W.49TH AVENUE,LJN1T#6 -
WHBAT RIDGE,CO 80033 (303)463-8270 -
BULK ASBESTOS ANALYSIS-POWT COUNf MET'HOD .
PAGE 1 OF 4
CI.fENT: ANALYSIS DATE: 8-31-06
AdtD ASBE.S1�06 7FSTING REPORTING DATE: 8-31-06
653 36 I/4 ROAD RECEII'T DATE: &28-06
PALISADE,CO 8i526 CLIENf JOB NO.: THE I.ANDMARK
PROJEGT'FIT[.E: 610 W.LIONSHEAD CR.-VAIL
DCMSL PROJECI: ADA'F290
' CROSS REFERENCE: ADAT289
PERCENTAGE COMPOSITION BY ARF.ANOLUME
DCM L.AB NO.: -1 -2 � -3 � -4 -S
SAMPLE DATE: 8-22-06 &22-06 8-22-06 8-22-06 &22-06
•/.OF TOTAI.SAMPLE: 2.0'�i 3.�% 1.0'/e Z.0'/s 3-0'/e -
Cl.IENI'NO.: LM-B-0�7 LM-B-008 LM-B-004 LM-B-OtO LM-B-OIf
PART B PART C PART A PART B PART B -
ASBF.SI7FORM MINBRAL FIBERS:
CHRYSOTII-E 025°/s 0.50% 0.75% 0.25Y. 0.75%
AMOSITE ND Nb ND ND ND
CROClDOLITE ND ND ND ND ND
TREMOLIT�ACI'INOLITE ND ND ND ND ND
ANPHOPHYLLTTE ND ND ND ND ND
TO'PAL ASBEST�OS CO[JNTED 0.25°/. 0.50`�G 0.75% 0.25% 0.75% �
TOTAL ASBES'fOS IlV LAYER 0.25X 0.50'/0 0.75X 0.25Y. 0.75Y.
TOTAL ASBESTOS II�I SAMPLB O.OIYe 0.02'/0 0.01% O.OlYe 0.02%
N01�S: SAMPLBS NO.1-5 ARE WHTTE DRYWALL MUD.
ND-NONE DEfECfED
DEFDdI1IONS
TOTAL ASBEST06 COUNTED = 1HE AMOUNT OF ASBFSTOS PRESENT IIV 1NE SAH�IPLE EXPRF.SSBD
AS A PERCENI'. .
TO'1'AL ASBESTOS IIV LAYER = THE PERCENT OF SAMPLB RBMAII�WG TIbiF.S ASBESTOS COUNTED
FJ�RESSED AS A PERCENT.
TOTAL ASBESTOS IN SAMpLE � THB PERCENT OF TOTAL SAMPLE(FROM PLM/SM ANALYSIS�
TIIHES T�1'OTAL ASBESPOS IN LAYER(IF NO ASBESTOS IN
' - O'IHER LAYBRS7. .
�
� ,,
� DCM SCIENCE LABORATORY,INC.
1242I W.49'FH AVEN[JE,UNi'I'#6
WHBAT RIDGB,CO 80033 (303)463-8270 �
BULK A3BESPOS ANALYSIS-POINT COUNf ME1�iOD
PAGE 3 OF 4 -
�r ANALYSIS DATE: &31-06
A&D ASBESTOS TESTING REPORTING DATE: 8-31-06 -'
653 361/4 ROAD RECEIpT DATE: 8-2g..p6
PALISADB,CO 81526 CI.IEIVT JOB NO.: 11�LANDMARK
PROJEGT 11TLE: 610 W.LtONSNEAD CR.-VAIL
DCMSL PROJEGT: ADAT29Q �
CR�SS REFERENCE: ADAT289 �
PERCENfAGE COMPOSTITQN BY AREA/VOLUNIE
DCM LAB NO.: -11 -l2 " -13 -14
SAMPLE DATE: 8-22-06 &22-06 8-22-06 8-22-06
%OF TOrfAI,SAMPLE: 3.0% I.OYo 1.0'/e 7.Q% '
. CLIETTI'NO.: LM-B-Ot7 LM-B-0I8 I,M-B-019 LM B-p?,p
PART B PART A PART A PART C �
NSBESI'IFORM 1�IINERAL FIBERS:
CHRYS017LE 0.75% 1.00�/. 1.75°/. 0.50'/0
AMOSTPE ND ND ND ND
CROCIDOLITE ND ND ND M3
TREMOLITE-AGTINOLITE Np � � �
ANIHOPHYLLITB TJp � � �
TOTAL ASBFSfOS COUNTED 0.75% 1.00'/ 1.75% 0.50'/0
mrni.��ssESros n�Ln�x o.�si. i.oai. i.�s�o o_sa.c -
TOTAL ASBFSTOS IN SAMFLE 0.02°i6 O.O1X 0.02°/. p.04•,�,
NOTES: SAMP[,ES NO. I 1-14 ARE WHTI'g DRyWpI,L MUD.
ND-NONE DB1ECfED
DFkIldT1TONS
TOTAL ASBESP�S OOUNTEb = 7Hfi AMOUNT OF ASBESTOS PRESFNf IIV THE SAMPLE EXPRESSED
AS A PERCEN'f:
TOTAL ASBES7�OS IIV LAYER = THB PF.RCENT OF SAMPLE REMAINWG TIMES ASBESPOS COUNTED -
EXPRESSID AS A PERCEM'.
TOTAL ASBESTOS IN SAMPLE = TEIE PERCENT OF TOTAL SAMPLE(FROM PLM/SM ANALYSISj
'I�IES THE'PO'TAL ASBEST'OS W LAYER(IF NO ASBESI'OS IN
OTHER I.AYERS).
�
. . ,'
DCM SCIENCE LABORAI�ORY,INC. "
t242]W.49T'H AVEIVLTE,1JN11'#6
- WHEAT RIDGE,CO 80033 (303)463-8270
BULK ASBES'PpS tUdAI,YSIS-POINT COUKf MSTHOD
PAGE 2 OF 4
�: ANALYSIS DA1E: 8-31-06 -
ABcD ASBESfOS TESTING . REPORTIIdG DATE: 8-31-06
653 36 I/4 ROAD RECEIPT DATS: 8-28-06 .
PALLSADE,CO 8t526 CLIENT JOB NO.: THE LANDMARK
PROJEGT T1TLE: 610 W.LIONSHEAD CR.-VAIL
DCMSL PROJF.GT: ADATZ90
CROSS REFERENCE: ADATZ89
PFRCENTAGE COMPOSTfION BY ARF.A/VOLUME
DCM LAB NO.: -b -7 -8 -9 -t0
SAMPLE DATE: 8-22-06 8-22-06 8-22-06 8-22-06 8-22-06
%OF TOTAI.SA11�LE 2.OX 4.0'/e . 4.0% 3.0'iG 2.0'/, �
CLIENTNO.: LM-B-OI2 LM-B-013 IM-E-014 LM-B-O}S LIV(-g.016
PART B PART B PART B PART B PART B
ASBFSTffORM NIDVERAL F[BERS:
�Y�E 0.50'/. OSO'/e 0.25°/. 0.75% 0.75%
AMOSITE ND ND ND ND ND
CROEIDOIITE ND .ND ND ND ND
TREMOLIT�AGTINOLTTE ND ND Np ND ND
ANIHOPHYLLTfE ND ND ND ND ND
T�TAI-ASBESTas CO�MfED 0.50% 0.50% 0.25% 0.75% U.75Ye
T�O'PAI-ASBFSTOS IN LAYER OSO'/o 0.50% 0.25°/. 0.75°/. 0.75°/6
TOTAL ASBESTOS IN SAMPLE 0.01•i6 0.02% 0.01°/. 0.02°/. 0.02°/.
NOTPS: SAMPLES NO.6-10 ARE WHTPg DRYWALL MUD.
ND-NONE DETEC7'ED
DEFIIdI'ITONS .
TOTAL ASBESTOS.COUN7'ED � THE AMOUM'OF ASBESTOS PRBSIDdT IN 1HE SAMPLE EXPRESSED
AS A PERCEMf.
T07'AL ASBESfOS IN LAYER = 1HE PERCENT OF SAI�LE RF.MAIlVIldG TII1�S ASBESTOS COUN'TED
B3�RESSBD AS A PERCENf.
TOTAL ASBESTOS IN SAMPLE = THE PERCEN'I'OF 1'O'I'pi,gpMpLE(FROM PI.M/SM ANALYSIS7
TIINES THE TOTAL ASBESTOS IN LAYER(IF NO ASBESTOS 1N
OTHER LAYERS).
, , .
DCM Science Laboratory, tnc.
� . 12421 W:49th Avenue.Unit�16
Wheat Rldge,CO 80033
DCM Project No.: HDAT 290
�Job No» TF�UWDMARK
Quantitative Bufk Sampie Analysis(point Count) .
QUANTRATNE BULK SAMpLE pNALYSIS PROCEDURES: Page�ot�
DCM SGence Laboratc�l, Inc.analyzes bulk sampie.s in a000rdance with the Na6onal Emission Standard for
Harar+dous Air Poliutarrts(NESHAP)for asbestos(Federal Register.Vol.55.Na.224,PP.48406-48433,
11/20/90). The analyticai procedures foliowed are described in rynterim Method for the Determination of
Asbestos in Bulk Insula4on Samples°,(USEPA 600/M4-83-020, 1982),with minor mod'dications recommended
by the Atmospheric Resea�h and Exposure Assessment Laboratory,USEPA,Research Triangle Park, N.C.
Samples analyzed by the point c�unt method are milled fio hanogenize the sample,prepared on micr�pe
slides and pant counted using polarized�igM microscopy(pLM)in conjundion w+th a point coun6ng stage and
counter. One hundred counts are performed on four separa6e Preparations of.each sampte for a total of 400
points.. If asbestos is identified but t�ot coun#ed during ithe point cour�ng proc�dure.tatat asbestos is reported
as zero and pr+�sence is noted on the r�eport. Ofher Pr�tion Procedu�es induding ashing and acid washing
may be pe�formed with clierit permission to improve a�urac.y in determining asbestos concentration. All
samples are archnred for six months uniess other arrangemerrts are made by the dien�
ACCREDlTATION:
DCMSL is accxedit�by the AIHA(since 1986). Our laboratory number is 101526.. DCMSL is accredited by �
NVLAP(since April 1, 1989). DCMSL complies with NVLAP and AIHq requi�ements untess othervvise noted.
ENDORSEMENT:
The results of this analysis must not be used by the clierrt to daim endorsement by NVLAP or any ac,�ency of the
U.S.Govemment
Th�test report relates only to the items tested. This report may not be reproduoed except in fulf,without the .
written approval of the laboratory. The anatysis was performed by;
.bnn suvennan,Anayst Ron scnott,Mayst
. Ron Schott ��3f-�o
Laborato�,a�ec#or o�8 .
��Qc�s
- V
NVL.AP Code 10t258
, ;` .
• __ � DCM Science Laboratory, Inc.
" " . ' � .12421 W.49th Avenue, Unit#6
� Wheat Ridge,CO 80033. `
DCN Project No.: ADAT 289 �
CUeM Job Na: THE LANDMARK �
Bulk Sample Analysis �
BULK SANIPLE ANpLYSIS PROCEDURES: � p����
DCM Saence 1-�orabory�inc.analytes bulk asbestos samptes following procedures devefoped by the
McCrone Research Institute and in compliance with gu�eCmes eshabGshed b�,the Environmental Protection
Agency(EPA-600/R-93/116,July, t993).
Bulk samples are pnepared for anatysis using a 10X-80X stereo microscope in a hepa fi�er hood which provides
a contama�ation�ree environment The sample is then ana(yzed by polarized tight microscopy(PLM)at i00X.
When the sample consists of mor�e than one tayer,eac�layer is prepared and analyzed separately. Fiber and
matmc mabe+iats are identified by ihe characterization of opticai ProPerties induding color and pleochrorism, ,
�Orm.deavage;r+efief;birefrin9ence,exxtinc�ion�orientation,twinning.interference figure and other distinguishing
` ieaWWrBS: Dispersion staining is also used to further aid in mineral idendficabon. All pe�entages of asbestos,
other fibers and non-fibrous constih�enis are cak,ulabed trom the values obtained from the stereo and PCM �
mic�Pes a�atysis. In-hause and NIST standards as weN as a chart pr�pared by a,D.Terry and G.V.
ChiGnger fqr'The Joumal of Sedimentary P
estima' �O9Y.Nolume 24.PP.229-234, 1955)provide a guide for
��t bn9 Percenfages. All samples are archivec!for soc months unless other arrangemerrts are made by the
ACCREDRATION: �
DCMSL-is aca'edited by NVLAP(since ApN 1, 1989). Our NVl.AP Lab Code is 101258-0. DCMSL complies
with NVLAP requiremerits unless othervvise noted. .
EtVDORSEMENTc � .
The�+esults of this analysis must not be used by the dient to claim endorsement by NVLAP or any agency of the
U.S.Govemment
This best r�eport relates only to the ihems tested. This report may not be reproduced except in full,withaut the
writteR aPProval of the faboratory. The analysis viras performed by:
,
!
John Sir�ertnan,Analyat Ron Sc�ott,Analy�
Ron Schott �-�,S-p „
Laboratory Ditector p�e
a�QQ °
�
���e,�,�
l ,
• I
�
1f
t
A & D Asbestos�Testi.ng and Consulting
Joh� R. Peterman
1
f
**�***��***�***�*
t
�
P.o.Box i2�o c���, co. 81520-1230 �
Cell 970-270-36$9 Home Phone 970-464�-5265
:
E .
August 26;2006
� �
To: Destination Resorts �
The LandMark
� .
� 610 W. Lionshead Circle I
Vail,CO. 81657 {
�
i .
Attn: Geoff Wright i
RE: Asbestos inspection and testing at The LandMark, 610 W. LionsHead �
Circle, Vail, CO. 81657 �
i
Otv i Description Cost
20—Bulk Samples (3 to 5 da�tura around) @ $45 each $900.00 `
,
14—Point Count Analysis (3 �5 days) C $45 each 630.00
�
1 -Days Labor @ �400.00 nex day 400 pp
TOTAL AMOUNT DUT THIS IlWOICE 1930.00 -
�
�
Due and Payable upon �eceipt—Thank you for your business
. � �
;
� i
� - -
�