Loading...
HomeMy WebLinkAboutDRB110070 Power Point Presentation Shown to the DRB on 040611 1 Vail Lionshead Transit StationApril 6, 2011 DRB Work Session2011 Improvements – Lionshead Transit & Welcome Center 2 Contents Why Are We Here Today? Design Revisions to Lionshead Transit & Welcome Center Based on Value EngineeringRevise North Elevation: Replace Corten Metal Panel with Natural StoneRemove Secondary Shed RoofRemove Art NicheRelocate Rear Entry to Waiting Area at Level 01 Remove Low Roof: Over Exterior Patio on the East Revise Service Enclosure: Replace Stone Veneer with Vertical Wood SidingMaintain Stone Veneer Watertable 3 PREVIOUS NORTH ELEVATIONCor-ten Panels @Entry Elements /Natural Stone Cladding Under RoofColored Concrete Behind Art WallTotal Sq. Ft. Exterior Wall = 3,515sfMetal Cladding = 1,315sfArt Niche = 750sfStone Veneer = 1,450sf3 4 NEW NORTH ELEVATIONTotal Sq. Ft. Exterior Wall = 3,515sfMetal Cladding = 0 sfArt Niche = 0 sfStone Veneer = 3,515 sfRemove Low Metal Roof at Outdoor PatioRemove Secondary Shed RoofReplace Cor-ten Metal Panel with StoneRemove Concrete Art NicheRelocate Rear Entry into Waiting Area4 5 NEW NORTH ELEVATIONWith Spandrel Panel of Existing GarageTotal Sq. Ft. Exterior Wall = 3,515sfMetal Cladding = 0 sfArt Niche = 0 sfStone Veneer = 3,515 sfRemove Low Metal Roof at Outdoor PatioRemove Secondary Shed RoofReplace Cor-ten Metal Panel with StoneRelocate Rear Entry into Waiting Area5Remove Concrete Art Niche 6PREVIOUS DESIGN: East Elevation SERVICE ENCLOSURE + LOW ROOF6 7 NEW DESIGN: East Elevation SERVICE ENCLOSURE + LOW ROOF7Remove Low Metal RoofReplace Stone with Vertical Wood Siding Extend North EaveRemove Secondary Shed Roof 8 Cor-ten Raised-Panel Metal Doors PREVIOUS DESIGN: South Elevation SERVICE ENCLOSURE + LOW ROOF8 9 Replace Stone with Vertical NEW DESIGN: South ElevationSERVICE ENCLOSURE + LOW ROOFWood Siding 9Remove Low Metal Roof