HomeMy WebLinkAboutB11-009912 -08 -2011 Inspection Request Reporting Page 3
4:46 pm Vail, CO - CitVOf
Requested Inspect Date: Friday, ecember 09 2011
Site Address: 825 FOREST RD VAIL
GORE CREEK PLACE UNIT 4
A/P /D Information
Activity: 1311 -0099 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: Insp Area:
Owner: JPSSE VAIL IMMOBILIERE LLG
Contractor: NEDBO CONSTRUCTION INC Phone: 970 - 845 -1001
Description: UPGRADE EXISTING LIGHTING FIXTURES WITH NEW TO INCREASE EFFICIENCY AND PROVIDE
BETTER LIGHT.
Requested Inspection(s)
Item: 90 BLDG -Final Requested Time: 08:00 AM
Requestor: NEDBO CONSTRUCTION INC / Patrick Phone: 970 - 977 -0324, Patrick
Comments: will call ahead
Assigned To: JMONDRAGON Entered By: MHAEBERLE K
Action: Time Exp:
Comment: no access ca a ice no answer or voice leave a message
�J
Inspection History
Item: 90 BLDG -Final /
12/07/11 Inspector: sgremmer Action: DN DENIED
Comment: no access called twice no answer or voice mail to leave a message
REPT131 Run Id: 13856
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
Maw
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B11 -0099
Project #:
Job Address: 825 FOREST RD VAIL
Location......: GORE CREEK PLACE UNIT 4
Parcel No....: 210107222004
OWNER JPSSE VAIL IMMOBILIERE LLC
RUBEN DARIO 115
TORRE 2 602
MEXICO D.F. CP
MEXICO 11580
APPLICANT NEDBO CONSTRUCTION INC
PO BOX 3419
VAIL
CO 81658
License: C000003087
CONTRACTOR NEDBO CONSTRUCTION IN(
PO BOX 3419
VAIL
CO 81658
License: C000003087
05/04/2011
05/04/2011 Phone: 970-845-1001
05/04/2011 Phone: 970-845-1001
Description:
UPGRADE EXISTING LIGHTING FIXTURES WITH NEW TO INCREASE
EFFICIENCY AND PROVIDE BETTER LIGHT.
Occupancy:
Type Construction:
Applied.....:
Issued...
PRJ 11 -0159
05/04/2011
05/05/2011
Valuation: $13,000.00
................................ ............................... <,..,........ FEE SUMMARY ...........,....,........ x. x.,,................ .......,.......,...,...........
Building Permit ------ - - - - ->
$223.25
Bldg Plan Check ----- - - - - ->
$145.11
Use Tax Fee------------------ - - - - ->
$60.00
Electrical Permit ---- - - - - ->
$115.00
Elec Plan Check ------ - - - - ->
$74.75
Restuarant Plan Review--- - - - - ->
$0.00
Mechanical Permit - - - - - ->
$0.00
Mech Plan Check ---- - - - - ->
$0.00
Additional Fees--------------- - - - - ->
($368.36)
Plumbing Permit --- - - - - ->
$0.00
Plmb Plan Check ---- - - - - ->
$0.00
Recreation Fee--------------- - - - - ->
$0.00
Investigation------------------ - - - - ->
$0.00
Will Call ------------------------------ >
$5.00
TOTAL PERMIT FEES -- ----------- >
$254.75
Payments -- ---------------------------- >
$254.75
BALANCE DUE------------------ - - - - ->
$0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR 1
8:00 AM - 4:00 PM
'Uwn r or con
W/rl �6
Print Name
TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
O's - Us Zo
Date
combination permit_012811
TOWN OV�AIL
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B11 -0099 Address: 825 FOREST RD VAIL
Owner: JPSSE VAIL IMMOBILIERE LLC Location:
GORE CREEK PLACE UNIT 4
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
combination permit_012811
TOWN O VARL
REQUIRED INSPECTIONS AND STATUSES
Permit #: Bl l -0099 Address: 825 FOREST RD VAIL
Owner: JPSSE VAIL IMMOBILIERE LLC Location:
GORE CREEK PLACE UNIT 4
Item: 00090 BLDG -Final
combination permit_012811
TOWN OF VAIL, COLORADO Statement
Statement Number: R110000413 Amount: $190.63 05/05/201103:52 PM
Payment Method: Check Init: SAB
Notation: 40169 nedbo
construction
-----------------------------------------------------------------------------
Permit No:
Bll -0099 Type:
COMBINATION BLDG PERMIT
Parcel No:
2101 - 072 - 2200 -4
Site Address:
825 FOREST RD VAIL
Location:
GORE CREEK PLACE UNIT
4
Total Fees:
$254.75
This Payment:
$190.63
Total ALL Pmts:
$254.75
Balance:
$0.00
*************************************************************
* * * * * * * * * * * * * * * * * *
* * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code
00100003111100, GFPO
EP 00100003111100
PF 00100003112300
UT 11000003106000
WC 00100003112800
Description
ELEC PERMIT FEES- GFP012
ELECTRICAL PERMIT FEES
PLAN CHECK FEES
USE TAX 4%
WILL CALL INSPECTION FEE
Current Pmts
85.00
30.00
10.63
60.00
5.00
e(_ e -1.1 ?_ 1 1 r,-
rM
Department of Community Development
,$ 75 South Frontage Road
A. Vail, Colorado 81657
Tel: 970 - 479 -2128
Web: www.vailgov.com
Development vi Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Project Street Address:
(Number) (Street) / (Suite #)
Building /Complex Name: Gate �lu c,6?
Contractor Information
Project #: pp ,:1 1 1 — 01 5
DRB #: —NA
Building Permit #: �4 9
Lot #: Block # Subdivision:
Business Name: N _e1 bo 10-71s - LIC ►N'l
Business Address: PO Qe'x 3 t o
City Yut' State: o Zip: 4rl V
Contact Name: �ollle (�jCS�O /�q�ricl�q/���
Contact Phone: 477- 026f� 977-63Zy
Contact E- Mail: (oll- 'e0a V" ,10!''1
Contractor Regis io Number: ZSl
X
Owner /Owner's Represen tive ignature Required)
Work Class: New ( ) Addition ( ) Alteration ( )
Type of Building:
Single - Family ( ) Duplex ( ) Multi - Family ( )
Commercial( ) Other( )
Work Type: Interior (x) Exterior( ) Both( )
Valuation of
Work Included Plans Included Work
Electrical C< )Yes ( )No X )Yes ( )No 13 aC�G
Mechanical ( )Yes (K )No ( )Yes (x)No
Plumbing ( )Yes (X)No ( )Yes ()()No
Project Information p 1 J Building ()()Yes ( )No ( ()Yes ( )No
Owner Name: J 5$E Vc,i, IM117 4 �(,[,
Value of all work being performed: $
Parcel #: Z l0 i 0'7 Z Z " OON (value based on IBC Section 109.3 & IRC Section 108.3)
(For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit Ihcis �-► CaNS 1 s torch
www.eaglecounty.us /patie) Electrical Square Footage f 27S?
Detailed Scope and Location of W tl p� rc�d e Cxts�1.2y Lok��y 0- )Avyes ki th r ew 4
:Z c4SC df- bci'tncy an d p�vy�dl /, -Ik Ai hl
(use additional sheet if necessary)
For Office Use Only:
Fee Paid:
Received From:
Cash Check # _
CC: Visa / MC Last 4 CC #
Auth #
exp date:
Date Received:
MAY 04 2011
OF VAIL
01 -Jan -1 I
State of Colorado
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testing required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two - Family Dwellings: 32 square feet
All Others (commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including
multi - family /condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State - certified abatement contractor. The
air clearance letter or form must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My project falls into the category checked below:
® Will not disturb more than the threshold limits identified above.
F] Tested negative, or at 1% or below (1 copies of test results included)
Tested positive at more than 1 %, requires abatement (1 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos - containing materials, so buildings of i3y age require testing.
• The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos - containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
Fire Prevention Bureau
Vail Fire Department
75 S Frontage Rd
Fire — i nspectors @vailgov.com
970 -79 -2252
www.vailgov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303 - 692 -3158
asbestos @state.co.us
www.cdphe.state.co.us
01-Jan-1 I