Loading...
HomeMy WebLinkAboutDRB110147May 17, 201 1 Mr. Bill Gibson Town of Vail Department of Community Development 75 South Frontage Road West Vail, CO 81657 RE: JAFFE DUPLEX, LOT 3, 1456 WESTHAVEN, VAIL, CO Dear Bill: In response to your May 17, 2011 e -mail regarding the building height of the duplex, we will be revising all 8:12 roof pitches to 7 1/2:12. This revision will keep all effected ridge heights below the 33 feet height limit. We will adjust our drawings and copy you on the revisions. Also included is the May 5, 2011 report prepared by HP Geotech addressing the debris flow conditions. Please let me know if you have any further questions. We look forward to getting started with construction. Sincerely, SEGERBERG, MAYHEW & ASSOCIATES, ARCHITECTS Kurt A. Segerberg, A.I.A. President KAS /Irt enc. MAY 18 2011 TOWN OF VAIL Segerberg, Mayhew & Associates Architects, P.C., A.I.A. Mail: P.O. Box 4700 Vail, CO 81658 e-mail: info @smarchs.com http: / /www.smarchs.com Main Office: Eagle -Vail 101 Eagle Road Bldg 6 Avon, CO 81620 phone: 970 476 4433 fax: 970 476 4608 Denver Office: 12600 West Colfax Avenue, Suite A -140 Lakewood, CO 80215 phone: 303 623 3355 fax: 303 623 2262 DR&I DIg7 HEP, ORTFi- PAWLAK GPQIE _li May 5, 2011 V n IE Q le E Tom Jaffe MAY l g Q» 1815 West Gore Creek Drive, #E Vail, Colorado 81657 WN OF VAIL Job No. 110 364A Subject: Evaluation of Potential Debris Flow impacts to Proposed Duplex Residence, Lot 3, Glen Lyon Subdivision, Westhaven Circle and Greenhill Court, Vail, Colorado Dear Mr. Jaffe: As requested by Kurt Segerberg with Segerberg Mayhew Architects, we have evaluated the debris flow conditions at the subject site with respect to the proposed Site Plan dated April 22, 2011 and more recent rough grading plan provided by Glenn Palmer of Alpine Engineering on May 3, 2011. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated November 29, 2010, Job No. 110 364A. The proposed building footprint is similar to that shown in our previous report but has shifted slightly to the west and rotated slightly counterclockwise. The shift and rotation provides a little more room along the east side to work with grade changes and surface drainage. The grade change between the uphill Lot 2 and the subject site is proposed to be handled by a combination of retaining walls and fairly deep swales. We suggested to Glenn Palmer to revise the upper retaining wall of the spa area to be 1 foot above the drainage swale for freeboard. The driveway entrance for the uphill, primary unit has been shifted downhill to the west and the ground floor level has been raised somewhat which will provide at least one foot of fall from the building to the drainage pan of Westhaven Circle. Because potential debris flow impact to the lot will be from uphill across Westhaven Circle, we recommended that a civil engineer design the grading for the project. We understand that Alpine Engineering has been retained and is working to complete the grading plan started by the architect. The subject site is located in a moderate debris flow hazard area according to Town of Vail (2000). The potential flood impact to the property is fiom the drainage basin above the Glen Lyon Subdivision and flow across the alluvial fan upon which the property is located. Considering the property location in the lower part of the moderate hazard area, and that considerable development has occurred uphill in the subdivision, it appears that the potential impact to the property would be mainly from mud flood rather than debris flow. Mitigation of this type of flow can usually consist of on -site drainage features to route the mud flood flows down Westhaven Circle and around the east side of the lot by Tom Jaffe May 5, 2011 Page 2 earth berms, well defined swales and retaining structures. We recommend these features have a minimum depth or height of at least 2 feet and be designed to deflect flows downhill rather than intercept flows that could cause flow material to backup on the property. Based on these conditions and the rough grading plan provided by Glenn Palmer, in our opinion, the grading plan and building layout for the project can be designed such that the development will not increase the hazard to adjacent public or private properties including buildings, structures and road and utility right -of -ways. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH - PAWLAK GE CHNICAL, INC. N- . P, I 4. a u ca 1 0 Steven L. Pawlak, P. a 1622, Rev. by: DEH SLPlksw cc: Segerberg Mayhew Architects - Kurt Segerberg (k seaerb erg smarch,.corn ) Reference: Town of Vail, 2000, Official Debris Flow Hazard Map, Town of Vail, prepared by Town of Vail, Vail, Colorado (adopted by Town Council on October 17, 2000). Alpine Engineering - Glenn Palmer, PE (Iit� JVU `IO. t1U304A Stech ep Application for Design Review Changes to Approved Plans General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. An ap- plication for Design Review cannot be accepted until all required information is received by the Community Development Department. Design review approval expires one year from the date of approva d and construction commences. D E� E W r Submittal Requirements: I 1. Three (3) Copies of all pertinent approved plans with illustrated, labeled char � MAY 10 2011 2. Joint Property Owner Written Approval Letter, if applicable Fee: $20 T(') 0 1= `JA , Single Family_ Duplex Multi- Family Commercial Description of the Request: �� G/ ,� Physical Address: � -� ���� �� � �A�"-� ^ Parcel Number: �I � aeew ��l (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.) Property Owner: Mailing Address: P. = /.qc�X V-A-JL, e� f&/ Phone: 1F 3 Owner's Signature: Primary Contact/ Owner Representative: Mailing Address: -/Pot, .. !. , el e E -Mail: Fax: _ Phone: �� r '/` — For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Exp. Date: _ gA th # Check # 9 � Fee Paid: •� Received From: �d° C Meeting Date: cot DRB No.: `�� 1 � (� 1�-{ �— Planner: ��— Project No: Zoning: Location of the Proposal Land Use: Lot: Block: Subdivision: 10 -4/1( -UO Department,' of Community Developmel 75 South Frontage Rog Vail ky r 01 -Jan-11 (� /,,, ��� PROPOSED MATERIALS Building Materials Type of Material Color Roof Siding Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Notes: Please specify the manufacturer's name, the color name and number and attach a color chip. f: \cdev\ forms\ permits \Planning \DRB \DRB_Changes to approved Plans_010111 � e,- W -) PROPOSED LANDSCAPING Botanical Name PROPOSED TREES AND SHRUBS EXISTING TREES TO BE REMOVED Minimum Requirements for Landscaping: Common Name Quanti Size Deciduous Trees — 2" Caliper Coniferous Trees — 6' in height Shrubs — 5 Gal. Type Square Footage GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.) f: \cdev\ forms\ permits \Planning \DRB \DRB_Changes to approved Plans_010111 LETTER OF TRANSMITTAL P.O. Box 4700 VAIL, COLORADO 81658 (970) 476 -4433 Fax (970) 476 -4608 TO Bill Gibso o Vail Planner 75 South Frontage Road Vail, CO WE ARE SENDING YOU ❑ Shop drawings ❑ Copy of letter ® Attached ® Prints ❑ Change order DATE 05 -09 -11 JOB NO. 33006.00 ATTENTION Bill RE: Jaffe Duplex — Lot 3 Permit Set ❑ Under separate cover via the following items: ❑ Plans ❑ Samples ❑ Specifications ❑ Transparencies COPIES DATE NO. DESCRIPTION 1 05 -03 -11 Jaffe Duplex — Lot 3 Permit Set 05 -03 -11 ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ® For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO Flit Ip1 MAY 10 2011 L luu TOWN OF VAIL SIGNED: Kurt If enclosures are not as noted, kindly notes us at once May 9, 2011 Mr. Martin Haeberle Chief Building Official Town of Vail 75 South Frontage Road West Vail, CO 81657 RE: JAFFE DUPLEX, LOT 3, 1456 WESTHAVEN, GLEN LYON SUBDIVISION, RESPONSE TO BUILDING DEPARTMENT COMMENTS DATED APRIL 14, 201 1. Dear Martin: Per your request, enclosed are four sets of revised construction documents. The most notable changes to the duplex have been the modifications to the site and grading plan and some slight adjustments to the primary and secondary floor elevations. We raised the entry level and upper level of the primary unit by l' -6 ". The primary entry drive was moved to the west to provide better drainage for this unit. The secondary unit was raised 6" and a site retention wall system is being designed for the east side of the secondary unit. The building footprint locations on the site remain the same. The revisions and responses to your April 14, 2011 letter are as follows: Architectural Comments: Heat tape will be used on all gutters and downspouts. See note on Sheet A1.0 snow fence retention devices will not be used. 2. Attic ventilation will be provided though gable roof at secondary unit. See Sheet A5.1. Five hundred (500) square feet will be ventilated with a minimum vent size of 1.6 square feet per 1203.2 IBC. 3. Attic access will be provided as shown on Sheet A3.4. Sheet Survey Attached are four stamped surveys as revised by Eagle Valley Engineering per Public Works request dated April 5, 2011. Sheet A2.0 The grading plan has been reviewed by Alpine Engineering and HP Geotechnical Inc. The plan has addressed the moderate debris hazard flow. Segerberor Mayhew & Associates Architects, P.C., A.I.A Mail: P.O. Box 4700 Vail, CO 81658 e -mail: info @smarchs.coin http: / /www.smarchs.coi Main Office: Eagle -Vail • 101 Eagle Road, Bldg. 6 Avon, CO 81620 • phone: 970 476 4433 • fax: 970 476 4608 Denver Office: 12600 West Colfax Avenue, Suite A -140 Lakewood, CO 80215 phone: 303 623 3355 fax: 303 623 2262 Mr. Martin Haeberle May 9, 2011 Page Two 2. Retaining walls will be reviewed by structural engineer and geotechnical engineer. Design is being coordinated. Sheet A7.0 1. Party wall has been extended to under side of roof sheathing. See Detail 4/A7.0. 2. Gable separation requires 5/8" Type "X" Gyp. Bd. at ceiling and wall separations. See Detail 1 /A6.0. 3. Regarding spa cover, see Detail 5/A7.0. Also see attached Specification. Spa to be provided by "Hot Springs Company ". Sheet A8.0 1. All windows and glazed doors to have .30 U.factor. See Window Schedule note Sheet A8.0. 2. See stone veneer attachment clarification note on masonry addendum Detail 1 W.O. 3. See note for weep location in stone veneer. Detail 1 /A7.0. Sheet A8.1 1. See clarification for corner insulation detail 14/A8.1 and 15/ A8.1. Sheet A9.0 thru 9.4 1. See notes on Sheet A9.0 and A9.3 of Electrical Plans for locating permanent certificate per ResCheck requirement. 2. See located carbon monoxide detectors on Electrical Plans. Typical shown outside all bedrooms. Sheets 19.0, A9.2, A9.3 and A9.4. Structural Comments 1. See attached response dated April 18, 2011 from S.A. Miro Structural Engineers. Mr. Martin Haeberle May 9, 2011 Page Three 2. Foundation drainage will be reviewed during the excavation and foundation work. Generally, drainage will be installed at all perimeter footings. Plumbing Comments 1. Please refer to civil engineering drawings and notes. Mechanical Comments 1. See Mechanical Sheet A3.0. Electrical Comments 1. See notes on Sheet A9.0 by New Electrical. 2. See notes on Sheet A9.0 by New Electrical. 3. See notes on Sheet A9.0 by New Electrical. Load Calculations 1. See attached load calculations per 220 -80 for heat tape. Please let me know if you need any further clarifications. We look forward to getting started with construction. Sincerely, SEGERBERG, MAYHEW & ASSOCIATES, ARCHITECTS Kurt A. Segerberg, A.I.A. President KAS /Irt enc. TOWN OF VAIL, COLORADO Statement Statement Number: R110000443 Amount: $20.00 05/10/201104:43 PM Payment Method: Check Init: LC Notation: 49319 / KURT A. SEGERBERG ----------------------------------------------------------------------------- Permit No: DRB110147 Type: DRB -Chg to Appr Plans Parcel No: 2103 - 124 - 0200 -6 Site Address: 1456 WESTHAVEN CR VAIL Location: Total Fees: $20.00 This Payment: $20.00 Total ALL Pmts: $20.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- DR 00100003112200 DESIGN REVIEW FEES 20.00 Bill Gibson From: Bill Gibson Sent: Tuesday, May 17, 20118:59 AM To: Kurt Segerberg (ksegerberg @smarchs.com) Subject: Jaffe (DRB110147) Hey Kurt, The proposed changes to the new Jaffe duplex at 1456 Westhaven Circle exceed the maximum allowable building height limit of 33 feet as measured to natural grade below: • Primary Unit Ridge 8116' -11" measures 33.2 feet from natural grade. • Secondary Unit Ridge 8104'- 1 -1/2" measures 33.3 feet from natural grade. Please submit plans corrections addressing this issue at your earliest convenience. Sincerely, Bill