HomeMy WebLinkAboutB11-0067NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MA
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B11 -0067
Project #:
Job Address: 641 W LIONSHEAD CR VAIL
Location......: MONTANEROS UNIT 312
Parcel No....: 210106309020
OWNER JRM TRUST
26 RESTWELL CRESCENT
TORONTO
ONTARIO
CANADA M2K2A3
APPLICANT SRE BUILDERS, INC.
PO BOX 6376
VAIL
COLORADO 81658
License: 360 -A
CONTRACTOR SRE BUILDERS, INC
PO BOX 6376
VAIL
COLORADO 81658
License: 360 -A
04/18/2011
04/18/2011 Phone: (970) 845 -6359
04/18/2011 Phone: (970) 845 -6359
Description:
INTERIOR REMODEL OF KITCHEN AND TWO BATHS
Applied.....:
Issued...
PRJ11 -0116
04/18/2011
05/11/2011
Occupancy: Type Construction: Valuation: $29,500.00
.� ................... .. .......... >.................... ,............,,.. , FEE SUMMARY .,,.,.,.,...,......,.....,............, .,........,....,,.........,.... ,.....
Building Permit ------ - - - - -> $441.75 Bldg Plan Check ----- - - - - -> $287.14 Use Tax Fee------------------ - - - - -> $390.00
Electrical Permit ---- - - - - -> $172.50 Elec Plan Check ------ - - - - -> $112.13 Restuarant Plan Review--- - - - - ->
$0.00
Mechanical Permit - - - - - -> $0.00 Mech Plan Check ---- - - - - ->
$0.00 Additional Fees--------------- - - - - -> $0.00
Plumbing Permit --- - - - - -> $75.00 Plmb Plan Check ---- - - - - -> $18.75 Recreation Fee--------------- - - - - -> $0.00
Investigation------------------ - - - - -> $0.00
Will Call ------------------------------ > $15.00
TOTAL PERMIT FEES -- ----------- > $1,512.27
Payments -- ---------------------------- > $1,512.27
BALANCE DUE------------------ - - - - -> $0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQ TS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8• AM - :00 PM.
/-I Signatu of caner or Contractor Da e
Name
combination permit_012811
O VAIRL TOWN
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B11 -0067
Owner: JRM TRUST
MONTANEROS UNIT 312
Address: 641 W LIONSHEAD CR VAIL
Location:
combination permit_012811
A *VAIL
WN
REQUIRED INSPECTIONS AND STATUSES
Permit #: B11 -0067
Owner: JRM TRUST
MONTANEROS UNIT 312
Address: 641 W LIONSHEAD CR VAIL
Location:
Item: 00120 ELEC -Rough
Item: 00220 PLMB- Rough /D.W.V.
Item: 00230 PLMB- Rough/Water
Item: 00030 BLDG - Framing
Item: 00050 BLDG - Insulation
Item: 00060 BLDG - Sheetrock Nail
Item: 00190 ELEC -Final
Item: 00290 PLMB -Final
Item: 00090 BLDG -Final
combination permit-012811
TOWN OF VAIL, COLORADO
Statement
Statement Number:
R110000447 Amount: $1,147.10 05/11/201111:40 AM
Payment Method:Credit
Crd Init: LC
Notation:
CREDIT CARD
FROM STEVE ELICKER,
SRE BUILDERS
-----------------------------------------------------------------------------
Permit No:
Bll -0067 Type: COMBINATION BLDG PERMIT
Parcel No:
2101 - 063 - 0902 -0
Site Address:
641 W LIONSHEAD CR VAIL
Location:
MONTANEROS UNIT 312
Total Fees:
$1,512.27
This Payment:
$1,147.10 Total ALL Pmts:
$1,512.27
Balance:
$0.00
ACCOUNT ITEM LIST:
Account Code
Description
Current Pmts
-------------- - - -
00100003111100, GFPO
- -- ------------------ ------ - - - - --
ELEC PERMIT FEES- GFP012
------ - - - - --
85.00
BP 00100003111100
BUILDING PERMIT FEES
441.75
EP 00100003111100
ELECTRICAL PERMIT FEES
87.50
PF 00100003112300
PLAN CHECK FEES
52.85
PP 00100003111100
PLUMBING PERMIT FEES
75.00
UT 11000003106000
USE TAX 4 9 6
390.00
WC 00100003112800
WILL CALL INSPECTION FEE
15.00
Project Street Address:
641 W Lionshead Circle 312
(Number) (Street) (Suite #)
Building /Complex Name: Montaneros Condominiums
Contractor Information
Business Name: SIRE Builders, Inc.
Business Address: PO Box 6376
City Vail State: Co
Contact Name: Sarah
Zip: 81658
Contact Phone: 970- 845 -6359
Contact E -Mail: sarah @srebuilders.com
Number: 360A
Signature (Required)
Project Information
Owner Name: I 1 K I rust
Parcel #: 2101- 063 -09 -020
(For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit
www.eaglecounty.us/patie)
Project #: fQ J j — 0
DRB #: : ,_ If
Building Permit #: R 1 1 0t/&
/ VAiL LtoPSl C —
Lot #: $ Block # / Subdivision:
Work Class: New ( ) Addition ( ) Alteration (/ )
Type of Building:
Single - Family ( ) Duplex ( ) Multi - Family ( ✓)
Commercial( ) Other( )
Work Type: Interior (✓) Exterior ( ) Both ( )
Value of all work being performed: s 29,500
(value based on IBC Section 109.3 & IRC Section 108.3)
Electrical Square Footage 1159
Detailed Scope and Location of Work: Interior remodel of kitchen & (2 ) baths
(use additional sheet if necessary)
For Office Use Only:
Fee Paid: -$ JAS. 17
Received From: SPtpAw U)VSC�42Vr__R. (69a)
Cash Check #
CC: ley MC Last 4 CC # ��.5 exp date: <
Auth # DO
Date Received:
Q 4 J C H \J E
APR 15 2U11
TOWN OF VAIL
n
N9
4
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Valuation of
Work Included
Plans Included
Work
Electrical
(,()Yes (
)No
( )Yes (
)No
2500
Mechanical
( )Yes (
)No
( )Yes (
)No
Plumbing
(/)Yes (
)No
( )Yes (
)No
4200
Building
(,()Yes (
)No
( )Yes (
)No
22800
Value of all work being performed: s 29,500
(value based on IBC Section 109.3 & IRC Section 108.3)
Electrical Square Footage 1159
Detailed Scope and Location of Work: Interior remodel of kitchen & (2 ) baths
(use additional sheet if necessary)
For Office Use Only:
Fee Paid: -$ JAS. 17
Received From: SPtpAw U)VSC�42Vr__R. (69a)
Cash Check #
CC: ley MC Last 4 CC # ��.5 exp date: <
Auth # DO
Date Received:
Q 4 J C H \J E
APR 15 2U11
TOWN OF VAIL
n
N9
4
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
State of Colorado
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testing required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two - Family Dwellings: 32 square feet
All Others (commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including
multi - family /condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State - certified abatement contractor. The
clearance letter must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My project falls into the category checked below:
❑ Will not disturb more than the threshold limits identified above.
❑ Tested negative, or at 1% or below (1 copies of test results included)
Tested positive at more than 1 %, requires abatement (1 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos - containing materials, so buildings of any age require testing.
• The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos - containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
Fire Prevention Bureau
Vail Fire Department
75 S Frontage Rd
Fire _i nspectors @vai lgov.com
970 - 479 -2252
www.vailgov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303 - 692 -3158
asbestos@state.co.us
www. cd phe. state. co. us
O1- Jan -11
Consulting
Final Clearance Air Monitoring Report
Montaneros Condominiums - Unit 312
541 W Lionshead Cir, Vail, Colorado 81657
Presented To:
Mr. Richard Capra
Rocky Mountain Abatement, Inc
P.O. Box 621840
Littleton, CO 80162 -1840
Performed & Prepared By:
Mr. Steve Shurtliff
DS Consulting, Inc.
PO Box 6864
Avon,CO 81620
(303) 378 -1544
Project Details:
Project Number: 4056
Conducted: May 9, 2011
PROJECT SUMMARY
On May 9, 2011, Mr. Steve Shurtliff with DS Consulting, Inc. (DSC) conducted a final visual inspection,
performed aggressive clearance air monitoring, and analyzed clearance air - quality samples via Phase
Contrast Microscopy (PCM) for an asbestos abatement project within a portion of the residence located at
541 W Lionshead Cir, Unit 312, Vail, Colorado.
Services were provided at the request of Mr. Richard Capra with Rocky Mountain Abatement, Inc. in
support of asbestos abatement activities being conducted to remove approximately 75ft of friable,
asbestos - containing drywall from a full containment encompassing the kitchen of the residence.
Monitoring locations and frequencies were determined by Mr. Steve Shurtliff; having EPA and State of
Colorado accreditation No. 15413. PCM analysis was also performed by Mr. Shurtliff (see Appendix B for
certification).
SCOPE OF WORK
Prior to the collection of final clearance air samples, a final visual inspection was conducted to ensure all
of the visual requirements were met. Once the abatement area passed the final visual inspection, DSC
collected final clearance air samples from random locations within the containment. Following the
collection of the final clearance air samples, Mr. Shurtliff analyzed the samples - as well as sample blanks -
to determine the airborne fiber concentrations. Mr. Shurtliff is NIOSH 582 certified and DSC is a
participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID
No. 188987 and has a rating of Proficient.
The abatement project passed the final visual inspection and the analytical results of all final clearance
samples collected were below the State of Colorado's clearance criteria of 0.01 fibers /cubic centimeter
(f /cc) (see Appendix A for Air Sample Analysis). This amount, quantified as "fibers ", is not specific to
asbestos fibers; therefore, all fibers that meet the counting criteria are counted as asbestos fibers. If the
total fiber count is less than 0.01 fibers /cubic centimeter (f /cc), it is known that the total asbestos fiber
count is also less than 0.01 fibers /cubic centimeter (f /cc)
PROJECT INFORMATION
• General Abatement Contractor (GAC)
Rocky Mountain Abatement, Inc.
• GAC Project Supervisor
Mr. Juan Noriega
• Project Location
541 W Lionshead Cir, Unit 312, Vail,
Colorado
• Project Contact
Mr. Richard Capra
• Air Monitoring Specialist /Analyst
Mr. Steve Shurtliff
• Date Conducted
May 9, 2011
• Final Clearance Sample Results
See Appendix A
• Certifications
See Appendix B
2
AIR MONITORING
Air - quality samples were collected utilizing a modified NIOSH 7400 Method, whereby samples were
collected on 25- millimeter (mm) mixed - cellulose, ester - membrane filters with 0.45- micron pore size and
analyzed via Phase Contrast Microscopy (PCM) as per the customer's requirements.
Sample Collection - PCM samples, when applicable, were collected on 25- millimeter (mm) mixed -
cellulose, ester - membrane filters with 0.45- micron pore size with an effective collection area of 385 mm.
All filters were pre - assembled by the manufacturer in three stages, conductive sampling cassettes with
extension cowls.
Air samples were collected at an average flow rate 12.5 liters per minute (L /m) using Thomas high -
volume pumps with a minimum of 1,200 liters being collected. Flow rates were collected at the
beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a
primary -flow calibration instrument. Start times and stop times were recorded for all sampling periods.
A field blank and lab blank were also collected and analyzed along with the five (5) clearance samples.
PCM Sample Analysis Method - PCM samples were analyzed according to a modified NIOSH 7400
Method —A Counting Rules— although samples were collected on 25 -mm mixed - cellulose, ester -
membrane filters with 0.45- micron pore size and analyzed via PCM. Air sample results contained in this
report have been calculated with blank sample corrections.
APPENDIX A - AIR SAMPLE RESULTS
Sam ple
I D
CL -1
1 1 ti m 1) Sa m ple
Type Location
Hi vol. Kitchen NE Corner
Av(,.
L/m
12.5
Start
Time
3:45
Stop
Time
5:35 p
Time
(111)
110
Vol.
( 1 1)
1364
Fibers ReSUILs
Fields (Flcc)
6.0/100 0.002
CL -2
Hi vol. Kitchen SE Corner
12.5
3:45
5:35p
110
1364
5.0/100 0.002
CL -3
Hi vol. Kitchen NW Corner
12.5
3:45
5:35p
110
1364
2.5/100 BRL
CL -4
Hi vol. Kitchen SW Corner
12.5
3:45
5:35p
110
1364
5.0/100 0.002
CL -5
Hi vol. Kitchen Center
12.5
1 3:45
5:35p
110
1364
1.5/100 BRL
CL -lb
n a Lab Blank
n a
n a
n a
n a
n a
1 0/100 0.000
CL -fb
n a Field Blank
n a
n a
n a
n a
n a
1 0/100 0.000
BRL = Below Reporting Limit
APPENDIX B - AMS/ANALYST CERTIFICATION
STATE OF COLORADO
ASBESTOS
CERTIFICATION*
Colorado Deparomm of Public W-ALh
and Envimmune"a
Air Pollution ConoW Division
'flos catithis that
Steve ShurtUff
Certification No: 15413
has nict the requmments of 25.7 -507, CPU and Air Quality Control
Commission RquIation No. 8, Part B, and is hereby certified by the
state ofColomdo in dw Wowing ibscipline-
Air Monitoring Specialist*
Issued: 9111/2009
Expires w 9/11/2011
a
a
c�� L�
w z
zw
GS
H
Remove the existing kitchen
cabinetry, pony wall and 2X4
fluorescent light.
113 1/2" finish to finish
Jew under cabinet liahtina
Remove the existing shower and
provide new shower with new tile
surround. Maintain existing fire rating
on walls and ceiling.
Bedroom 2 Closet
O
O
New ceiling fan NEW
DOOR $
Bath 2
I ��
Flo eta
i
L __ J Remove
O closet wall
and door.
Bath 1
New wall tile at \ I I Entry
tub surround \
National Gypsum Company
GTsum Wallboard Floor /Ceiling — Wood Fromina (wood ioists with rouah and finished floor
N o. Fire Rating Ref, Design No. Description STC Test No. IIC
SINGLE LAYER No C* C* i N
I hr. UL L501 5/8'(15.9mm) Fre —Shield Gypsum Wallboard or 5/8' 31 Based on 32 66
GA FC 5420 (15.9mm) FS Soffit Board nai attached to 2 x 10 NGC 4024
(38mm x 241mm)wood Joists spaced 16'o.c.
(406mm). UL design L501 permits option of Floor
Tapping Mixture over plywood.
Ilr I � � I I
I I new pony wall
O I I I I I ( (coordinate location with new kitchen cabinetry design)
remove 4 recessed can lights over existing bar and repair
I I I I drywall to meet the 1 hour fire separation.
l�itche I I I new pendl n ight, switch on existing bar light circuit
I
I I I I Living
l'Q —J I�i 1 - - -4
V I LL
(4) new 6" recessed can light fixtures
existing ceiling (GA FC5420)
Town ian
REVI ED FOR C
drywall box that maintains the firerating 19 MA A CE
Date zi
Existing closet fire sprinkler head and Bath heads are to be reworked.
Piping is to be enclosed in a 1 -hour rated soffit. Fire sprinkler head By'
Closet and location to be designed by fire sprinkler co tractor and approved Coq;
by the Town of Vail
FLOOR PLAN
SCALE: 1/4* - 1'I
Bedroom 1
fan
New ceiling
Parcel Number 2101 - 063 -09 -020
Owner Name JMR TRUST
Owner Address 26 RESTWELL CRESCENT
loset TORONTO ONTARIO M2K2A3
1 CANADA
Contractor SRE Builders
PO Box 6376
Vail Colorado 81658
970 - 845 -6359
N.T.S.
IE CE0IV
q
i3
0
w
J E
z �s
. �W m
�ZU
4 m
O
Q a
Fire rating wall: D
Prescriptive item #15 -1.14
2X6 wood studs at 16" o.c. with double top plat
and single bottom plate; interior and exterior sid s
covered with 8" type 'X' gypsum wall board, 4'w
applied horizontally or vertically with vertical joints
over studs, and fastened with 2 4" Type S drywall
screws, spaced 7" o.c.
0('&(3 1' P- -z
Town of Vail
f f Or7rCopy
,
CO
APR 15 2011
`OWN OF VAIL
400519
V A?I
N U
T
CO c>,
0
D 0
rn
� 6
0 U .
C
0 t
N
C
U) 0
0 J
C a)
N ?�
C 0 0
0 1
M
z
r
Q
10
l�J
AK Electric
PO Box 6241
Avon, CO 81620
Andrew: 970- 390 -4975
LOAD CALCULATION
Project: Montaneros Unit # 312
1159 Sq Ft. x 3 W/Ft. = 3,477 W
2 SA Circuits x 150OW = 3,000 W
1 Range = 8,000 W
14,477 W
220.83 - NEC
14,477 W — 8,000 W = 6,477 W
6,477 W x 40% = 2,591 W
2,591 W + 8,000 W = 10,591 W
10,591 W + 6,500 W (Electrical Heat Load) = 17,091 W
17,091 W / 240V = 71.2 A
100 Amp Service
Town of Vail
REVIEWED FOR CODE
COMPLIAN E
Date:
By:
Code: n Q
APR 15 2011
I TOWN OF VAIL I
A
06 - 17 - 2011 Inspection Request Reorting Page 2
4:19 pm Vai1,� = G ty Of
Requested : Mondayy June 20, 2011
Site Address: 641 W LIONSHEAD CR VAIL
MONTANEROS UNIT 312
A/P /D Information
Activity: 611 -0067 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: Insp Area:
Owner: JRM TRUST
Contractor: SRE BUILDERS, INC. Phone: (970) 845 -6359
Description: INTERIOR REMODEL OF KITCHEN AND TWO BATHS
Requested InsDection(s
Item: 90 BLDG -Final
Requestor: SRE BUILDERS, INC.
Comments: 904 -6010
Assigned To: JON
Action: �I ,INS ��ss ��
Item
Requestor
Comments
Assigned To
Action
Inspection History
Item:
120 ELEC -Rough
05/16/1 T Inspector:
Comment:
05/17/11 Inspector:
Comment:
Item:
220 PLMB - Rough /D.W.V.
05/16/1 T Inspector:
Comment:
05/17/11 Inspector:
Comment:
Item:
230 PLMB- Rough/Water
05/16/1 T Inspector:
Comment:
05/17/11 Inspector:
Comment:
Item:
30 BLDG - Framing
05/16/11 Inspector:
Comment:
05/19/11 Inspector:
Comment:
Item:
50 BLDG - Insulation
Item:
60 BLDG - Sheetrock Nail
05/23/11 Inspector:
Comment:
Item:
190 ELEC -Final
06/16/11 Inspector:
Comment:
Item:
290 PLMB -Final
Item:
90 BLDG -Final
Time Exp:
312
Time Exp:
** Approved **
sgremmer
sgremmer
** Approved **
sgremmer
sgremmer
** Approved **
sgremmer
sgremmer
** Approved **
sgremmer
sgremmer
JRM Approved **
** Approved **
mdenney
Requested Time: 01:30 PM
Phone: 07 845 -6359 -or- cell 748 -
Entered By: JMONDRAGON K
Requested Time: 08:30 AM
Phone: 970 - 376 -2918, JOHN
Entered By: LCAMPBELL K
Action: NR NOT READY FOR INSPECTION
Action: AP APPROVED
Action: NR NOT READY FOR INSPECTION
Action: AP APPROVED
Action: NR NOT READY FOR INSPECTION
Action: AP APPROVED
Action: NR NOT READY FOR INSPECTION
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
REPT131 Run Id: 13211