Loading...
HomeMy WebLinkAboutB11-0067NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MA Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11 -0067 Project #: Job Address: 641 W LIONSHEAD CR VAIL Location......: MONTANEROS UNIT 312 Parcel No....: 210106309020 OWNER JRM TRUST 26 RESTWELL CRESCENT TORONTO ONTARIO CANADA M2K2A3 APPLICANT SRE BUILDERS, INC. PO BOX 6376 VAIL COLORADO 81658 License: 360 -A CONTRACTOR SRE BUILDERS, INC PO BOX 6376 VAIL COLORADO 81658 License: 360 -A 04/18/2011 04/18/2011 Phone: (970) 845 -6359 04/18/2011 Phone: (970) 845 -6359 Description: INTERIOR REMODEL OF KITCHEN AND TWO BATHS Applied.....: Issued... PRJ11 -0116 04/18/2011 05/11/2011 Occupancy: Type Construction: Valuation: $29,500.00 .� ................... .. .......... >.................... ,............,,.. , FEE SUMMARY .,,.,.,.,...,......,.....,............, .,........,....,,.........,.... ,..... Building Permit ------ - - - - -> $441.75 Bldg Plan Check ----- - - - - -> $287.14 Use Tax Fee------------------ - - - - -> $390.00 Electrical Permit ---- - - - - -> $172.50 Elec Plan Check ------ - - - - -> $112.13 Restuarant Plan Review--- - - - - -> $0.00 Mechanical Permit - - - - - -> $0.00 Mech Plan Check ---- - - - - -> $0.00 Additional Fees--------------- - - - - -> $0.00 Plumbing Permit --- - - - - -> $75.00 Plmb Plan Check ---- - - - - -> $18.75 Recreation Fee--------------- - - - - -> $0.00 Investigation------------------ - - - - -> $0.00 Will Call ------------------------------ > $15.00 TOTAL PERMIT FEES -- ----------- > $1,512.27 Payments -- ---------------------------- > $1,512.27 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQ TS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8• AM - :00 PM. /-I Signatu of caner or Contractor Da e Name combination permit_012811 O VAIRL TOWN CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B11 -0067 Owner: JRM TRUST MONTANEROS UNIT 312 Address: 641 W LIONSHEAD CR VAIL Location: combination permit_012811 A *VAIL WN REQUIRED INSPECTIONS AND STATUSES Permit #: B11 -0067 Owner: JRM TRUST MONTANEROS UNIT 312 Address: 641 W LIONSHEAD CR VAIL Location: Item: 00120 ELEC -Rough Item: 00220 PLMB- Rough /D.W.V. Item: 00230 PLMB- Rough/Water Item: 00030 BLDG - Framing Item: 00050 BLDG - Insulation Item: 00060 BLDG - Sheetrock Nail Item: 00190 ELEC -Final Item: 00290 PLMB -Final Item: 00090 BLDG -Final combination permit-012811 TOWN OF VAIL, COLORADO Statement Statement Number: R110000447 Amount: $1,147.10 05/11/201111:40 AM Payment Method:Credit Crd Init: LC Notation: CREDIT CARD FROM STEVE ELICKER, SRE BUILDERS ----------------------------------------------------------------------------- Permit No: Bll -0067 Type: COMBINATION BLDG PERMIT Parcel No: 2101 - 063 - 0902 -0 Site Address: 641 W LIONSHEAD CR VAIL Location: MONTANEROS UNIT 312 Total Fees: $1,512.27 This Payment: $1,147.10 Total ALL Pmts: $1,512.27 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - 00100003111100, GFPO - -- ------------------ ------ - - - - -- ELEC PERMIT FEES- GFP012 ------ - - - - -- 85.00 BP 00100003111100 BUILDING PERMIT FEES 441.75 EP 00100003111100 ELECTRICAL PERMIT FEES 87.50 PF 00100003112300 PLAN CHECK FEES 52.85 PP 00100003111100 PLUMBING PERMIT FEES 75.00 UT 11000003106000 USE TAX 4 9 6 390.00 WC 00100003112800 WILL CALL INSPECTION FEE 15.00 Project Street Address: 641 W Lionshead Circle 312 (Number) (Street) (Suite #) Building /Complex Name: Montaneros Condominiums Contractor Information Business Name: SIRE Builders, Inc. Business Address: PO Box 6376 City Vail State: Co Contact Name: Sarah Zip: 81658 Contact Phone: 970- 845 -6359 Contact E -Mail: sarah @srebuilders.com Number: 360A Signature (Required) Project Information Owner Name: I 1 K I rust Parcel #: 2101- 063 -09 -020 (For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit www.eaglecounty.us/patie) Project #: fQ J j — 0 DRB #: : ,_ If Building Permit #: R 1 1 0t/& / VAiL LtoPSl C — Lot #: $ Block # / Subdivision: Work Class: New ( ) Addition ( ) Alteration (/ ) Type of Building: Single - Family ( ) Duplex ( ) Multi - Family ( ✓) Commercial( ) Other( ) Work Type: Interior (✓) Exterior ( ) Both ( ) Value of all work being performed: s 29,500 (value based on IBC Section 109.3 & IRC Section 108.3) Electrical Square Footage 1159 Detailed Scope and Location of Work: Interior remodel of kitchen & (2 ) baths (use additional sheet if necessary) For Office Use Only: Fee Paid: -$ JAS. 17 Received From: SPtpAw U)VSC�42Vr__R. (69a) Cash Check # CC: ley MC Last 4 CC # ��.5 exp date: < Auth # DO Date Received: Q 4 J C H \J E APR 15 2U11 TOWN OF VAIL n N9 4 BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Valuation of Work Included Plans Included Work Electrical (,()Yes ( )No ( )Yes ( )No 2500 Mechanical ( )Yes ( )No ( )Yes ( )No Plumbing (/)Yes ( )No ( )Yes ( )No 4200 Building (,()Yes ( )No ( )Yes ( )No 22800 Value of all work being performed: s 29,500 (value based on IBC Section 109.3 & IRC Section 108.3) Electrical Square Footage 1159 Detailed Scope and Location of Work: Interior remodel of kitchen & (2 ) baths (use additional sheet if necessary) For Office Use Only: Fee Paid: -$ JAS. 17 Received From: SPtpAw U)VSC�42Vr__R. (69a) Cash Check # CC: ley MC Last 4 CC # ��.5 exp date: < Auth # DO Date Received: Q 4 J C H \J E APR 15 2U11 TOWN OF VAIL n N9 4 BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) State of Colorado Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including multi - family /condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified abatement contractor. The clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: ❑ Will not disturb more than the threshold limits identified above. ❑ Tested negative, or at 1% or below (1 copies of test results included) Tested positive at more than 1 %, requires abatement (1 copies of test results included) Tips & Facts: • Even recent construction projects may include asbestos - containing materials, so buildings of any age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: Fire Prevention Bureau Vail Fire Department 75 S Frontage Rd Fire _i nspectors @vai lgov.com 970 - 479 -2252 www.vailgov.com State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303 - 692 -3158 asbestos@state.co.us www. cd phe. state. co. us O1- Jan -11 Consulting Final Clearance Air Monitoring Report Montaneros Condominiums - Unit 312 541 W Lionshead Cir, Vail, Colorado 81657 Presented To: Mr. Richard Capra Rocky Mountain Abatement, Inc P.O. Box 621840 Littleton, CO 80162 -1840 Performed & Prepared By: Mr. Steve Shurtliff DS Consulting, Inc. PO Box 6864 Avon,CO 81620 (303) 378 -1544 Project Details: Project Number: 4056 Conducted: May 9, 2011 PROJECT SUMMARY On May 9, 2011, Mr. Steve Shurtliff with DS Consulting, Inc. (DSC) conducted a final visual inspection, performed aggressive clearance air monitoring, and analyzed clearance air - quality samples via Phase Contrast Microscopy (PCM) for an asbestos abatement project within a portion of the residence located at 541 W Lionshead Cir, Unit 312, Vail, Colorado. Services were provided at the request of Mr. Richard Capra with Rocky Mountain Abatement, Inc. in support of asbestos abatement activities being conducted to remove approximately 75ft of friable, asbestos - containing drywall from a full containment encompassing the kitchen of the residence. Monitoring locations and frequencies were determined by Mr. Steve Shurtliff; having EPA and State of Colorado accreditation No. 15413. PCM analysis was also performed by Mr. Shurtliff (see Appendix B for certification). SCOPE OF WORK Prior to the collection of final clearance air samples, a final visual inspection was conducted to ensure all of the visual requirements were met. Once the abatement area passed the final visual inspection, DSC collected final clearance air samples from random locations within the containment. Following the collection of the final clearance air samples, Mr. Shurtliff analyzed the samples - as well as sample blanks - to determine the airborne fiber concentrations. Mr. Shurtliff is NIOSH 582 certified and DSC is a participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 and has a rating of Proficient. The abatement project passed the final visual inspection and the analytical results of all final clearance samples collected were below the State of Colorado's clearance criteria of 0.01 fibers /cubic centimeter (f /cc) (see Appendix A for Air Sample Analysis). This amount, quantified as "fibers ", is not specific to asbestos fibers; therefore, all fibers that meet the counting criteria are counted as asbestos fibers. If the total fiber count is less than 0.01 fibers /cubic centimeter (f /cc), it is known that the total asbestos fiber count is also less than 0.01 fibers /cubic centimeter (f /cc) PROJECT INFORMATION • General Abatement Contractor (GAC) Rocky Mountain Abatement, Inc. • GAC Project Supervisor Mr. Juan Noriega • Project Location 541 W Lionshead Cir, Unit 312, Vail, Colorado • Project Contact Mr. Richard Capra • Air Monitoring Specialist /Analyst Mr. Steve Shurtliff • Date Conducted May 9, 2011 • Final Clearance Sample Results See Appendix A • Certifications See Appendix B 2 AIR MONITORING Air - quality samples were collected utilizing a modified NIOSH 7400 Method, whereby samples were collected on 25- millimeter (mm) mixed - cellulose, ester - membrane filters with 0.45- micron pore size and analyzed via Phase Contrast Microscopy (PCM) as per the customer's requirements. Sample Collection - PCM samples, when applicable, were collected on 25- millimeter (mm) mixed - cellulose, ester - membrane filters with 0.45- micron pore size with an effective collection area of 385 mm. All filters were pre - assembled by the manufacturer in three stages, conductive sampling cassettes with extension cowls. Air samples were collected at an average flow rate 12.5 liters per minute (L /m) using Thomas high - volume pumps with a minimum of 1,200 liters being collected. Flow rates were collected at the beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a primary -flow calibration instrument. Start times and stop times were recorded for all sampling periods. A field blank and lab blank were also collected and analyzed along with the five (5) clearance samples. PCM Sample Analysis Method - PCM samples were analyzed according to a modified NIOSH 7400 Method —A Counting Rules— although samples were collected on 25 -mm mixed - cellulose, ester - membrane filters with 0.45- micron pore size and analyzed via PCM. Air sample results contained in this report have been calculated with blank sample corrections. APPENDIX A - AIR SAMPLE RESULTS Sam ple I D CL -1 1 1 ti m 1) Sa m ple Type Location Hi vol. Kitchen NE Corner Av(,. L/m 12.5 Start Time 3:45 Stop Time 5:35 p Time (111) 110 Vol. ( 1 1) 1364 Fibers ReSUILs Fields (Flcc) 6.0/100 0.002 CL -2 Hi vol. Kitchen SE Corner 12.5 3:45 5:35p 110 1364 5.0/100 0.002 CL -3 Hi vol. Kitchen NW Corner 12.5 3:45 5:35p 110 1364 2.5/100 BRL CL -4 Hi vol. Kitchen SW Corner 12.5 3:45 5:35p 110 1364 5.0/100 0.002 CL -5 Hi vol. Kitchen Center 12.5 1 3:45 5:35p 110 1364 1.5/100 BRL CL -lb n a Lab Blank n a n a n a n a n a 1 0/100 0.000 CL -fb n a Field Blank n a n a n a n a n a 1 0/100 0.000 BRL = Below Reporting Limit APPENDIX B - AMS/ANALYST CERTIFICATION STATE OF COLORADO ASBESTOS CERTIFICATION* Colorado Deparomm of Public W-ALh and Envimmune"a Air Pollution ConoW Division 'flos catithis that Steve ShurtUff Certification No: 15413 has nict the requmments of 25.7 -507, CPU and Air Quality Control Commission RquIation No. 8, Part B, and is hereby certified by the state ofColomdo in dw Wowing ibscipline- Air Monitoring Specialist* Issued: 9111/2009 Expires w 9/11/2011 a a c�� L� w z zw GS H Remove the existing kitchen cabinetry, pony wall and 2X4 fluorescent light. 113 1/2" finish to finish Jew under cabinet liahtina Remove the existing shower and provide new shower with new tile surround. Maintain existing fire rating on walls and ceiling. Bedroom 2 Closet O O New ceiling fan NEW DOOR $ Bath 2 I �� Flo eta i L __ J Remove O closet wall and door. Bath 1 New wall tile at \ I I Entry tub surround \ National Gypsum Company GTsum Wallboard Floor /Ceiling — Wood Fromina (wood ioists with rouah and finished floor N o. Fire Rating Ref, Design No. Description STC Test No. IIC SINGLE LAYER No C* C* i N I hr. UL L501 5/8'(15.9mm) Fre —Shield Gypsum Wallboard or 5/8' 31 Based on 32 66 GA FC 5420 (15.9mm) FS Soffit Board nai attached to 2 x 10 NGC 4024 (38mm x 241mm)wood Joists spaced 16'o.c. (406mm). UL design L501 permits option of Floor Tapping Mixture over plywood. Ilr I � � I I I I new pony wall O I I I I I ( (coordinate location with new kitchen cabinetry design) remove 4 recessed can lights over existing bar and repair I I I I drywall to meet the 1 hour fire separation. l�itche I I I new pendl n ight, switch on existing bar light circuit I I I I I Living l'Q —J I�i 1 - - -4 V I LL (4) new 6" recessed can light fixtures existing ceiling (GA FC5420) Town ian REVI ED FOR C drywall box that maintains the firerating 19 MA A CE Date zi Existing closet fire sprinkler head and Bath heads are to be reworked. Piping is to be enclosed in a 1 -hour rated soffit. Fire sprinkler head By' Closet and location to be designed by fire sprinkler co tractor and approved Coq; by the Town of Vail FLOOR PLAN SCALE: 1/4* - 1'I Bedroom 1 fan New ceiling Parcel Number 2101 - 063 -09 -020 Owner Name JMR TRUST Owner Address 26 RESTWELL CRESCENT loset TORONTO ONTARIO M2K2A3 1 CANADA Contractor SRE Builders PO Box 6376 Vail Colorado 81658 970 - 845 -6359 N.T.S. IE CE0IV q i3 0 w J E z �s . �W m �ZU 4 m O Q a Fire rating wall: D Prescriptive item #15 -1.14 2X6 wood studs at 16" o.c. with double top plat and single bottom plate; interior and exterior sid s covered with 8" type 'X' gypsum wall board, 4'w applied horizontally or vertically with vertical joints over studs, and fastened with 2 4" Type S drywall screws, spaced 7" o.c. 0('&(3 1' P- -z Town of Vail f f Or7rCopy , CO APR 15 2011 `OWN OF VAIL 400519 V A?I N U T CO c>, 0 D 0 rn � 6 0 U . C 0 t N C U) 0 0 J C a) N ?� C 0 0 0 1 M z r Q 10 l�J AK Electric PO Box 6241 Avon, CO 81620 Andrew: 970- 390 -4975 LOAD CALCULATION Project: Montaneros Unit # 312 1159 Sq Ft. x 3 W/Ft. = 3,477 W 2 SA Circuits x 150OW = 3,000 W 1 Range = 8,000 W 14,477 W 220.83 - NEC 14,477 W — 8,000 W = 6,477 W 6,477 W x 40% = 2,591 W 2,591 W + 8,000 W = 10,591 W 10,591 W + 6,500 W (Electrical Heat Load) = 17,091 W 17,091 W / 240V = 71.2 A 100 Amp Service Town of Vail REVIEWED FOR CODE COMPLIAN E Date: By: Code: n Q APR 15 2011 I TOWN OF VAIL I A 06 - 17 - 2011 Inspection Request Reorting Page 2 4:19 pm Vai1,� = G ty Of Requested : Mondayy June 20, 2011 Site Address: 641 W LIONSHEAD CR VAIL MONTANEROS UNIT 312 A/P /D Information Activity: 611 -0067 Type: COMBO Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: JRM TRUST Contractor: SRE BUILDERS, INC. Phone: (970) 845 -6359 Description: INTERIOR REMODEL OF KITCHEN AND TWO BATHS Requested InsDection(s Item: 90 BLDG -Final Requestor: SRE BUILDERS, INC. Comments: 904 -6010 Assigned To: JON Action: �I ,INS ��ss �� Item Requestor Comments Assigned To Action Inspection History Item: 120 ELEC -Rough 05/16/1 T Inspector: Comment: 05/17/11 Inspector: Comment: Item: 220 PLMB - Rough /D.W.V. 05/16/1 T Inspector: Comment: 05/17/11 Inspector: Comment: Item: 230 PLMB- Rough/Water 05/16/1 T Inspector: Comment: 05/17/11 Inspector: Comment: Item: 30 BLDG - Framing 05/16/11 Inspector: Comment: 05/19/11 Inspector: Comment: Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail 05/23/11 Inspector: Comment: Item: 190 ELEC -Final 06/16/11 Inspector: Comment: Item: 290 PLMB -Final Item: 90 BLDG -Final Time Exp: 312 Time Exp: ** Approved ** sgremmer sgremmer ** Approved ** sgremmer sgremmer ** Approved ** sgremmer sgremmer ** Approved ** sgremmer sgremmer JRM Approved ** ** Approved ** mdenney Requested Time: 01:30 PM Phone: 07 845 -6359 -or- cell 748 - Entered By: JMONDRAGON K Requested Time: 08:30 AM Phone: 970 - 376 -2918, JOHN Entered By: LCAMPBELL K Action: NR NOT READY FOR INSPECTION Action: AP APPROVED Action: NR NOT READY FOR INSPECTION Action: AP APPROVED Action: NR NOT READY FOR INSPECTION Action: AP APPROVED Action: NR NOT READY FOR INSPECTION Action: AP APPROVED Action: AP APPROVED Action: AP APPROVED REPT131 Run Id: 13211