HomeMy WebLinkAbout02 Concrete 110331 C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Aftn:
1 May 27, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 05/27/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 165 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Building Footers
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines J.0/1.0 4780621 85820156 10:35AM 11:42AM 2 1/2 1.7 68 145.8 15
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820156 Lab ID 1531
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 55960 67090 64990 62360
Compressive Strength(psi) 4450 5340 5170 4960
Test Date 06/03/10 06/24/10 06/24/10 06/24/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Aftn:
2 May 27, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 05/27/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 165 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Building Footers
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines E.6/1.3 4780730 85820162 11:48AM 12:59PM 3 1/2 1.5 74 146.2
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820162 Lab ID 1532
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 51710 64140 63300 66340
Compressive Strength(psi) 4110 5100 5040 5280
Test Date 06/03/10 06/24/10 06/24/10 06/24/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Aftn:
3 May 27, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 05/27/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 165 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Building Footers
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines A.1/5.4 4780612 85820166 1:05PM 2:02PM 3 1.4 72 146.0 10
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820166 Lab ID 1533
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 53320 65920 61470 61410
Compressive Strength(psi) 4240 5250 4890 4890
Test Date 06/03/10 06/24/10 06/24/10 06/24/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Aftn:
4 May 27, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 05/27/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 165 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Building Footers
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines E.2/4.6 4780612 85820174 3:15PM 4:23PM 4 1.5 70 146.1 5
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820174 Lab ID 1534
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 52660 67880 66810 63150
Compressive Strength(psi) 4190 5400 5320 5030
Test Date 06/03/10 06/24/10 06/24/10 06/24/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
5 June 7, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/07/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 2-5
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Foundations Walls west of Gridlines A.0-J.0/1.0-1.8
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines A.0/1.5 4780140 85820226 8:15AM 9:24AM 5 1.5 69 145.6 15
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g2g20226 Lab ID 1551
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 51940 72020 76380 68070
Compressive Strength(psi) 4130 5730 6080 5420
Test Date 06/14/10 07/05/10 07/05/10 07/05/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
6 June 7, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/07/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 2-5
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Foundation Walls west of Gridlines A.0-J.0/1.0-1.8
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines D.0/1.3 4780612 85820230 9:40AM 10:48AM 5 1.4 73 145.9 10
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g2g20230 Lab ID 1552
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 58910 75500 69610 68330
Compressive Strength(psi) 4690 6010 5540 5440
Test Date 06/14/10 07/05/10 07/05/10 07/05/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
7 June 8, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/08/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 2-5
Total Cubic Yards Placed: 50 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Foundations Walls west of Gridlines H3-J.0/1.8-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines J.0/2.5 4780048 85820257 12:25PM 1:22PM 6 1.6 72 144.8
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g2g20257 Lab ID 1553
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 51220 69850 66540 70820
Compressive Strength(psi) 4080 5560 5300 5640
Test Date 06/15/10 07/06/10 07/06/10 07/06/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments We notified Justin with RN Nelson of the slump test results immediately. Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
8 June 10, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/10/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 2-5
Total Cubic Yards Placed: 40 Air Range(%) N/A
Weather/Temperature Cloudy/70's Temperature(°F) 50-90
Placement Location: Building Footings,at Gridlines C.0-EO/5.4 and E.0-GO/5.4-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridlines F.0/8.0 4780109 85820300 1:30PM 2:30PM 6 1.7 71 144.6
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820300 Lab ID 1572
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 53990 64170 64910 68940
Compressive Strength(psi) 4300 5110 5170 5490
Test Date 06/17/10 07/08/10 07/08/10 07/08/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments We notified Justin with RA Nelson of the slump test results immediately. Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
9 June 15, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/15/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 70 Air Range(%) 0-3
Weather/Temperature Clear/70's Temperature(°F) 50-90
Placement Location: Elevator Core up to 111'and Stair Core up to 111',Wall Gridlines B.0-A.0/5.4-6.0, Pad Gridlines H.3/4.6,Columns E.5/4.6
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Elevator Core Gridlines E.2/5.0 4780612 85820345 9:19AM 10:40AM 6 1/2 2.0 66 147.2
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820345 Lab ID 1582
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 54430 64220 69590 66730
Compressive Strength(psi) 4330 5110 5540 5310
Test Date 06/22/10 07/13/10 07/13/10 07/13/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments We notified RA Nelson of the slump test results. Field Technician Eric Miller
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
10 June 18, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/18/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4200
Concrete Supplier/Mix ID: LaFarge/RMXDD42GD87 Slump Range(in.) 1-4"
Total Cubic Yards Placed: 50 Air Range(%) 0-3
Weather/Temperature Clear/70's Temperature(°F) 50-90
Placement Location: East Pedestrian Path
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
10'E, 10'N of NE corner of proposed building 4780612 85820407 9:20 10:45 3 1/2 5.6 70 139.8 5
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820407 Lab ID 1590
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 46260 59570 59410 59940
Compressive Strength(psi) 3680 4740 4730 4770
Test Date 06/25/10 07/16/10 07/16/10 07/16/10
Test Age 7 28 28 28
Type of Fracture T3 T3 T5 T5
Additional Comments Field Technician KMc
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
11 June 21, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/21/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/80's Temperature(°F) 50-90
Placement Location: Foundation walls at gridlines C.1-J.0/1.8-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline C.3/5.4 4780048 85820434 10:35AM 11:42AM 4 1.3 70 145.4
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820434 Lab ID 1595
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 51880 68920 67530 71520
Compressive Strength(psi) 4130 5480 5370 5690
Test Date 06/28/10 07/19/10 07/19/10 07/19/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
12 June 21, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/21/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/80's Temperature(°F) 50-90
Placement Location: Foundation walls at gridlines C.1-J.0/1.8-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline H.3/7.0 4780639 85820440 12:25PM 1:28PM 3 3/4 1.5 71 145.2 8
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820440 Lab ID 1596
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 53590 69400 73760 73510
Compressive Strength(psi) 4260 5520 5870 5850
Test Date 06/28/10 07/19/10 07/19/10 07/19/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
13 June 24, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 06/24/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 8 Air Range(%) 0-3
Weather/Temperature Sunny/80's Temperature(°F) 50-90
Placement Location: Planter Walis at gridlines C.0-DO/5.4-5.6,&gridlines E.0-E.7/7.8-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline C.3/5.5 221 0016566 1:40PM 3 1/2 1.9 70 146.8 12
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: 0016566 Lab ID 1611
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 57110 69800 69410 67940
Compressive Strength(psi) 4540 5550 5520 5410
Test Date 07/01/10 07/22/10 07/22/10 07/22/10
Test Age 7 28 28 28
Type of Fracture T5 T3 T5 T5
Additional Comments Field Technician Josiah Prunty
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
14 July 2, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/02/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 30 Air Range(%) N/A
Weather/Temperature Cloudy/70's Temperature(°F) 50-90
Placement Location: Elevator shaft walls 2nd to 3rd floor
Methods Employed: Tailgate to Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Elevator Shaft North Side 4780140 85820665 8:55AM 10:28AM 4 1/4 1.6 70 8
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820665 Lab ID 1619
Cylinder Diameter(in.) 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57
Maximum Load 51050 61230 62400
Compressive Strength(psi) 4060 4870 4970
Test Date 07/09/10 07/30/10 07/30/10
Test Age 7 28 28
Type of Fracture T5 T5 T5
Additional Comments Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
15 July 12, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/12/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 4"Max
Total Cubic Yards Placed: 28 Air Range(%) Ent
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: East Stairs, Level 2-4
Methods Employed: Tailgate to Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
South Wall 4780639 85820821 11:55AM 1:05PM 4 1/4 1.5 75 5
Notification of field test results: Justin with RA Nelson and RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820821 Lab ID 1640
Cylinder Diameter(in.) 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57
Maximum Load 55430 65890 67830
Compressive Strength(psi) 4410 5240 5400
Test Date 07/19/10 08/09/10 08/09/10
Test Age 7 28 28
Type of Fracture T3 T5 T3
Additional Comments Testing was scheduled at 11:OOAM.The pour was postponed until 1:00 PM.We had to make two trips. Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
16 July 13, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/13/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 3500
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 5"Max
Total Cubic Yards Placed: 80 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Level 2 Slab on metal deck at Gridlines A.0-E.3/1.3-5.4
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline A.2/1.6 4780730 85820836 7:29AM 8:21AM 3 1/2 3.0 70 144.5
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820836 Lab ID 1642
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 41580 69180 65870 65140
Compressive Strength(psi) 3310 5510 5240 5180
Test Date 07/20/10 08/10/10 08/10/10 08/10/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
17 July 13, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/13/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 3500
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 5"Max
Total Cubic Yards Placed: 80 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Level 2 Slab on metal deck at Gridlines A.0-E.3/1.3-5.4
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline D.5/1.8 4780612 11:10AM 11:40AM 5 2.2 70 145.8
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: Lab ID 1643
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 42690 60630 58830 61800
Compressive Strength(psi) 3400 4820 4680 4920
Test Date 07/20/10 08/10/10 08/10/10 08/10/10
Test Age 7 28 28 28
Type of Fracture T5 T3 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
18 July 14, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/14/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 3500
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 5"Max
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Level 2 Slab on metal deck at Gridlines E.4-J.0/1.0-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline 1.7/1.1 478730 85820860 7:50AM 9:10AM 5 1.8 71 145.9 22
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820860 Lab ID 1646
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 45630 64920 65660 67280
Compressive Strength(psi) 3630 5170 5230 5350
Test Date 07/21/10 08/11/10 08/11/10 08/11/10
Test Age 7 28 28 28
Type of Fracture T3 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
19 July 14, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/14/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 3500
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 5"Max
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Level 2 Slab on metal deck at Gridlines E.4-J.0/1.0-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline H.3/5.4 10:25AM 11:05AM 6 2.4 70 145.0
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: Lab ID 1647
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 36660 56630 56880 56690
Compressive Strength(psi) 2920 4510 4530 4510
Test Date 07/21/10 08/11/10 08/11/10 08/11/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
20 July 15, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/15/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 5"Max
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Interior Slab on Grade at Gridlines D.3-J.0/1.0-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline E.0/4.5 4780612 85820880 7:10AM 8:50AM 6 1/4 2.6 68 145.4 12
Gridline D.5/1.9 Tested at Tailgate,Slump Only 9:18 6
Gridline D.5/1.7 Tested at end of hose,Slump Only 9:25 6
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820880 Lab ID 1651
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 45580 61920 63530 64440
Compressive Strength(psi) 3630 4930 5060 5130
Test Date 07/22/10 08/12/10 08/12/10 08/12/10
Test Age 7 28 28 28
Type of Fracture T3 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
21 July 15, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/15/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 5"Max
Total Cubic Yards Placed: 100 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Interior Slab on Grade at Gridlines D.3-J.0/1.0-8.0
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline G.0/4.5 4780728 11:10AM 11:51AM 5 1.2 73 146.3 12
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: Lab ID 1652
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 45830 62970 62140 62290
Compressive Strength(psi) 3650 5010 4940 4960
Test Date 07/22/10 08/12/10 08/12/10 08/12/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
22 July 13, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/16/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 90 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Level 1 floor slab
Methods Employed: Tailgate to Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline D.3/1.8 4780730 85820896 7:18AM 8:56AM 4 1/2 1.9 72 7
Notification of field test results: Justin with RA Nelson and Sergio with RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820896 Lab ID 1654
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 48830 67430 67750 67080
Compressive Strength(psi) 3890 5370 5390 5340
Test Date 07/23/10 08/13/10 08/13/10 08/13/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
23 July 13, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/16/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 90 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Level 1 floor slab
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline C.4/4.7 4780140 85820300 8:30AM 10:18AM 5 2.3 74 5
Notification of field test results: Justin with RA Nelson and Sergio with RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820300 Lab ID 1655
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 42420 62510 62310 63580
Compressive Strength(psi) 3380 4970 4960 5060
Test Date 07/23/10 08/13/10 08/13/10 08/13/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
24 July 23, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/23/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUG40GD97 Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 18.5 of 50 Air Range(%) N/A
Weather/Temperature Partly Cloudy/70's Temperature(°F) 50-90
Placement Location: Stair#1 core walls Gridlines B.0-CO/4.6-5.4, 121'to 131'elevation
Methods Employed: Pump Truck,Vibration
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline C.0/5.4 4780531 85820999 10:50AM 12:OOPM 5 1/4 1.5 73 145.8
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5820999 Lab ID 1669
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 51180 70840 74010 75740
Compressive Strength(psi) 4070 5640 5890 6030
Test Date 07/30/10 08/20/10 08/20/10 08/20/10
Test Age 7 28 28 28
Type of Fracture T3 T5 T3 T3
Additional Comments Field Technician Jon Noble
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
25 July 29, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 07/29/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 2-5
Total Cubic Yards Placed: 17 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Stair Core#1 from level 4 to level 5
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
6'N of SW corner of walls 4780730 85821078 1:50PM 2:38PM 4 1/2 2.0 74 144.5
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5821078 Lab ID 1686
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 55320 74770 77320 72510
Compressive Strength(psi) 4400 5950 6150 5770
Test Date 08/05/10 08/26/10 08/26/10 08/26/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
26 August 13, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 08/13/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXUH40GD97 Slump Range(in.) 2-5
Total Cubic Yards Placed: 35 Air Range(%) N/A
Weather/Temperature Partly Cloudy/70's Temperature(°F) 50-90
Placement Location: Stair Core#2 from level 4 to Top
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
7'E of NW corner of walls 4780811 85901047 2:54PM 3:30PM 4 3.0 70 144.7 5
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: 85901047 Lab ID 1730
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 59720 74150 72960 76930
Compressive Strength(psi) 4750 5900 5810 6120
Test Date 08/20/10 09/10/10 09/10/10 09/10/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
27 August 24, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 08/24/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXC140GD9V Slump Range(in.) 3-5
Total Cubic Yards Placed: 43 Air Range(%) N/A
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Interior Slab on Grade,Lavel 1 Mechanical Room
Methods Employed: Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Gridline H.3/1.2 4780810 85821433 7:31AM 9:15AM 5 2.0 68 144.7 10
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5821433 Lab ID 1761
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 48250 62050 64490 63450
Compressive Strength(psi) 3840 4940 5130 5050
Test Date 08/31/10 09/21/10 09/21/10 09/21/10
Test Age 7 28 28 28
Type of Fracture T3 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
28 September 3, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 09/03/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXZP40GF87 Slump Range(in.) 3-5
Total Cubic Yards Placed: 10 Air Range(%) 3-6
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: East Side Stairs,Core#2
Methods Employed: Tailgate to Mechanical Pumper
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Level 5 Staris 4780640 85821553 7:15AM 9:03AM 4 1/2 5.7 64 136.3 15+15
Notification of field test results: Justin with RA Nelson and RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5821553 Lab ID 1795
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 46410 61090 57260 58120
Compressive Strength(psi) 3690 4860 4560 4630
Test Date 09/10/10 10/01/10 10/01/10 10/01/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments 15 ga.Of water added after all tests were performed. Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
29 September 13, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 09/13/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXZP40GF87 Slump Range(in.) 3-5
Total Cubic Yards Placed: 10 Air Range(%) 3-6
Weather/Temperature Sunny/50's Temperature(°F) 50-90
Placement Location: Stair
Methods Employed: Tailgate to Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
Level 5 Stairs 4780640 85821648 7:10AM 9:OOAM 6 1/4 2.6 65 140.4 18
Notification of field test results: Justin with RA Nelson and Sergio with RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5821648 Lab ID 1818
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 47860 66610 65110 67530
Compressive Strength(psi) 3810 5300 5180 5370
Test Date 09/20/10 10/11/10 10/11/10 10/11/10
Test Age 7 28 28 28
Type of Fracture T5 T3 T5 T5
Additional Comments Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
30 October 1, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 10/01/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4000
Concrete Supplier/Mix ID: LaFarge/RMXDD42GD87 Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 9 Air Range(%) 5-8
Weather/Temperature Sunny/70's Temperature(°F) 50-90
Placement Location: Crosspan on W.Lionshead Cir @ Site Entrance
Methods Employed: Tailgated
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
6'North of South End of Crosspan 4780729 85909210 3:20PM 4:04PM 3 1/2 6.1 72 138.8 5 gallons
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: 85909210 Lab ID 1888
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57 12.57
Maximum Load 43970 56860 65790 67690 64070
Compressive Strength(psi) 3500 4520 5240 5390 5100
Test Date 10/04/10 10/08/10 10/29/10 10/29/10 10/29/10
Test Age 3 7 28 28 28
Type of Fracture T5 T5 T5 T5 T5
Additional Comments Field Technician Kevin McClure
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
31 October 15, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 10/15/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4500
Concrete Supplier/Mix ID: LaFarge/RMXDD42GD87 Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 30 Air Range(%) 6-8
Weather/Temperature Sunny/60's Temperature(°F) 50-90
Placement Location: West Side Apron in front of garage door
Methods Employed: Tailgate to Pump Truck
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
25'S,20'W of NE corner of Apron 4780811 85909339 4:35PM 5:19PM 4 1/4 6.0 68 140.4
Notification of field test results: Justin with RA Nelson and Sergio with RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: 85909339 Lab ID 1936
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 51700 66850 66900 65960
Compressive Strength(psi) 4110 5320 5320 5250
Test Date 10/22/10 11/12/10 11/12/10 11/12/10
Test Age 7 28 28 28
Type of Fracture T5 T3 T5 T5
Additional Comments Scheduled for 4:OOPM pour,started test at 5:19PM. Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
32 October 18, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 10/18/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4500
Concrete Supplier/Mix ID: LaFarge/RMXDD42GD87 Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 13 Air Range(%) 5-8
Weather/Temperature Cloudy/40's to 50's Temperature(°F) 50-90
Placement Location: C&G from approximately 40'to 200'east of Gridlines A.0/5.4 West Entrance to driveway planner
Methods Employed: Direct Discharge
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
50'E of Gridline A.0/5.4 612 85822147 7:27AM 8:57AM 3 6.0 65 143.2
Notification of field test results: Justin with RA Nelson
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5822147 Lab ID 1940
Cylinder Diameter(in.) 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57
Maximum Load 54390 77300 77930
Compressive Strength(psi) 4330 6150 6200
Test Date 10/25/10 11/15/10 11/15/10
Test Age 7 28 28
Type of Fracture T5 T5 T5
Additional Comments Field Technician Michael Konopka
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721
C RDU�1In Client:
Job Name Vail Resort Development Co.
ENGINEERING C�NSULTRNTS FirstChairEmployeeHousing Address:
CONCRETE FIELD PROPERTIES AND PO Box 959
COMPRESSIVE STRENGTH TEST RESULTS Job Number Avon, CO 81620
10-6522
Report Number Report Date Attn:
33 October 19, 2010 Mr. Kyle Griffith
On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND
performed testing in general accordance with tne frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes
related site observations for the concrete placement and to the best of our knowledge including information from site representatives. As we provide periodic services on most projects
and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details. This report includes the results of the tests we performed and our
observations,however, it is the responsibility of the contractor to pertorm construction and provide materials that meet the project plans and specifications
Placement Date: 10/19/10 SpecifiCations
Concrete Placed By: RMS Concrete Required Strength(psi) 4500
Concrete Supplier/Mix ID: LaFarge/RMXDD42GD87 Slump Range(in.) 4"MAX
Total Cubic Yards Placed: 16 Air Range(%) 4-8
Weather/Temperature Cloudy/40's Temperature(°F) 50-90
Placement Location: C&G on N&S sides of East Paking Lot
Methods Employed: Tailgate
Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added
Spread(in.) (/o) Temp:°F (pcf) (gallons)
NE corner of Parking Lot C&G 4780811 85822164 7:25AM 8:OOAM 3 1/2 4.7 62 143.3 8+5
Notification of field test results: Justin with RA Nelson and AI with RMS
Compressive Strenqth Results (ASTM C39) Cylinders Cast from ticket: g5822164 Lab ID 1950
Cylinder Diameter(in.) 4.00 4.00 4.00 4.00
Cross Secional Area(sq in.) 12.57 12.57 12.57 12.57
Maximum Load 61210 72990 70560 71010
Compressive Strength(psi) 4870 5810 5610 5650
Test Date 10/26/10 11/16/10 11/16/10 11/16/10
Test Age 7 28 28 28
Type of Fracture T5 T5 T5 T5
Additional Comments 5 gallons of water was added after all tests were performed. Field Technician Stephen Buckeridge
Corporate Office Gypsum Office
41 Inverness Dr East P.O Box 464
Englewood,CO 80112 Gypsum CO 81637
Tel:(303)289 1989 Tel:(970)524 0720
Fax:(303)289 1686 Offices:Denver,Loveland,Western Slope,Granby Fax:(970)524 0721