HomeMy WebLinkAboutB11-0105 comment letter
Date: May 24, 2011
Re: Vail Spa B11-0105
Dear Rollie,
RESPONSE INSTRUCTIONS
● Submit four complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified.
● Please respond in writing to each comment with a response letter addressing each comment.
BUILDING COMMENTS
Architectural Comments:
Sheet C1.1
1. Revise plans to reflect the 2009 IBC as adopted by the Town of Vail
2. Provide handrails at new stairs per section 1009.12 IBC.
Sheet A002
1. Show proposed Trash building in compliance with Building Type referenced on cover page. Section 602.2 IBC
2. Revise annotations to reference the 2009 IBC (2003 ANSI) as adopted by the Town of Vail.
Structural Comments:
Sheet S001
1. Please clarify if special inspection will be required for welding and masonry. See field welding on plans and call out for high lift grouting. Reference sections 1704.3.1 and 1704.5
respectively.
2. Provide a completed special inspection agreement with resubmittal.
Sheet S103
1. Proposed sub flooring and decking to comply with heavy timber construction as specified in section 602.4.4 IBC.
Sheet S501
1 Epoxy grout product proposed in detail c does not require special inspection? Pease clarify
Plumbing Comments:
Sheet C2.0
1. Show compliance with section 404.12 IFGC where gas piping is going under the new trash structure.
Mechanical Comments:
Sheet M1.0
1. Revise general note to reference the Town of Vail building codes and amendments.
Electrical Comments
Reviewed and accepted
PLANNING COMMENTS
Please revise plans to reflect changed location of trash enclosure.
FIRE COMMENTS
Reviewed and accepted
PUBLIC WORKS COMMENTS
Reviewed and accepted
Sincerely,
Martin A. Haeberle
Chief Building Official