Loading...
HomeMy WebLinkAboutDRB110144 PlansA4 » 8253.0 82514 A A TOCN� r ,- 825 .5 ,f 0 8252.8 r� r CONTROL POINT #74 / �f ELEV. = 8254.6' 4 8255.3 r r 1 8255.4 ;CONCRETE BRIDGE ABUTMENT 8" STEEL PIPE (TOP OF PIPE EL. = 82 5.2') / BRIDGE y / / 4C3 44.9' TEST HOLE � I BUILDING AREA OF EXHIBIT EDGE OF CREEK (5/10/2010) .r TEE .. r. - -- • p_g v NOTES: 1) DATE OF TOPOGRAPHY: 5/10/2010 10 GRAPHIC SCALE 10 20 ( IN FEET ) 1 inch = 10 ft. 2) THE SOLE PURPOSE OF THIS EXHIBIT IS TO INDICATE THE LOCATION OF A PORTION OF THE EDGE OF CREEK AS LOCATED ON 5/10/2010 AND 5/4/2011. OTHER FEATURES INDICATED HAVE NOT BEEN UPDATED FROM DATE OF TOPOGRAPHY. 2) BASIS OF ELEVATIONS: CONTROL POINT #74 (SEE DRAWING), ELEVATION = 8254.6' (NAVD 88) 3) NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SURVEYOR'S CERTIFICATE I, SAMUEL H. ECKER, A PROFESSIONAL LAND SURVEYOR REGISTERED UNDER THE LAWS OF THE STATE OF COLORADO, DO HEREBY CERTIFY THAT THIS EXHIBIT WAS MADE BY ME AND UNDER MY SUPERVISION, AND THAT THE MAP IS ACCURATE AND CORRECT TO THE BEST OF MY KNOWLEDGE. r r � r C�v Z TOP OF WALL = 82531 ' BOTTOM OF WALL = 8248.8' TOP OF WALL = 8254.0' BOTTOM OF WALL = 8248.3' 7 TOP OF WALL = 8254.1' . -- BOTTOM OF WALL = 8250.3' TEE X 256.9 ' C (.5 C� X 8256.4 08253.1 0 8255.1 APPROXIMATE 50 EDGE OF BANK CENTERLINE OF CREEK (5/4/2011) SETBACK -- f f - now* s� r m X 8253.5 -- �► + E "°• t EDGE OF CREEK (5/10/2010) L/t oo � w N w o � � a w w r r � r C�v Z TOP OF WALL = 82531 ' BOTTOM OF WALL = 8248.8' TOP OF WALL = 8254.0' BOTTOM OF WALL = 8248.3' 7 TOP OF WALL = 8254.1' . -- BOTTOM OF WALL = 8250.3' TEE X 256.9 ' C (.5 C� X 8256.4 08253.1 0 8255.1 APPROXIMATE 50 EDGE OF BANK CENTERLINE OF CREEK (5/4/2011) SETBACK -- f f - now* s� r m X 8253.5 -- �► + E "°• t EDGE OF CREEK (5/10/2010) L/t oo a3 ». DES IGN N i STAFF OATE w