HomeMy WebLinkAboutB06-0154 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD /ALT MF BUILD PERMIT Permit #: B06 -0093
Job Address.: 2039 CHAMONIX LN VAIL Status • ISSUED
Location • CROOKED SKI TOWNHOMES Applied...: 04/25/2006
Parcel No • 210311402005 Issued ...: 04/26/2006
Legal Description: Expires...: 10/23/2006
Project No...: - 1
OWNER CROOKED SKI TOWNHOUSE HOMEOW04/25/2006
2039 CHAMONIX LN
VAIL
CO 81657
CONTRACTOR MASTER SEALERS 04/25/2006 Phone: 970 - 476 -3975
P. O. BOX 4473
VAIL
CO 81658
License: 577 -B
Desciption:
RE -ROOF; MOIRE BLACK -HOT TAR TO FULLY TAPERED 1/4" PER FOOT
DROP, TORCH DOWN WITH SAND
Occupancy:
Type Construction:
Type Occupancy: ??
Valuation: $39,800.00 Add Sq Ft: 0
Fireplace Information: Restricted: Y # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0
************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ***************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Building > $542.75 Restuarant Plan Review - -> $0.00 Total Calculated Fees - -> $898.54
Plan Check > $ 3 5 2.7 9 Recreation Fee > $ 0.0 0 Additional Fees > $ 0.0 0
Investigation -> $0.00 TOTAL FEES > $898.54 Total Permit Fee > $898.54
Will Call > $3.00 Payments > $898.54
BALANCE DUE > $0.00
Approvals:
Item: 05100 BUILDING DEPARTMENT
04/26/2006 JRM Action: AP
Item: 05400 PLANNING DEPARTMENT
04/26/2006 JS Action: AP
****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY . is % :':�
AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM.
SIGNATU • j4' ER OR CONTRACTOR FOR HIMSELF AND OWNEF
PAGE 2
****************************************:******************************** ** * * * * * * * * *** * * * * * * * * * * * * * * * ***
CONDITIONS OF APPROVAL
Permit #: B06 -0093 as of 04 -26 -2006 Status: ISSUED
************************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Type: ADD /ALT MF BUILD PERMIT Applied: 04 /25/2006
Applicant: CROOKED SKI TOWNHOUSE HOMEOWNERS ASSOC Issued:
04/26/2006
To Expire: 10/23/2006
Job Address: 2039 CHAMONIX LN VAIL
Location: CROOKED SKI TOWNHOMES
Parcel No: 210311402005
Description:
RE -ROOF; MOIRE BLACK -HOT TAR TO FULLY TAPERED 1/4" PER FOOT
DROP, TORCH DOWN WITH SAND
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 40
(BLDG): (MFR /COMM) FIRE ALARM REQUIRED PER NFPA 72.
•
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R060000449 Amount: $898.54 04/26/200608:47 AM
Payment Method: Check Init: LC
Notation: #10212 /Master
Sealers, Inc.
Permit No: B06 -0093 Type: ADD /ALT MF BUILD PERMIT
Parcel No: 2103 - 114 - 0200 -5
Site Address: 2039 CHAMONIX LN VAIL
Location: CROOKED SKI TOWNHOMES
Total Fees: $898.54
This Payment: $898.54 Total ALL Pmts: $898.54
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
BP 00100003111100 BUILDING PERMIT FEES 542.75
PF 00100003112300 PLAN CHECK FEES 352.79
WC 00100003112800 WILL CALL INSPECTION FEE 3.00
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIV ��'' �� t _ • G(
Project #:
Building Permit #: ,ig�Inta 2
• cx)963 479 -2149 (Inspections)
TOWN OF VAL TOWN OF VAIL BUILDING PERMIT APPLICATION
Separate Permits are required for electrical, plumbing, mechanical, etc.!
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
General Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s:
/Aj: . S > - 2 - ate
Email address: / Fax #:
Contractor Signature:
COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials)
BUILDING: $ I ELECTRICAL: $ I OTHER: $ �G �r.0 ' I
PLUMBING: $ I MECHANICAL: $ I TOTAL: $ '' "I
For Parcel # Contact Eagle County Assessors Office at 970 328 - 8640 or visit www.eagle countv.com
Parcel #
Job Name: Job Address:
Legal Description Lot: Block: I Filing: 11 Subdivision:
Owners Na 4/4 4 � Acl �G /1� l�,�i e -r Phone
� -
Architect/Designer: / Address: Phone:
Engineer: Address: Phone:
Detailed description of work: .d - .ec
Work Class: New () Addition ( ) Re node' ( ) Repair ( ) Demo ( ) Other ( �
Work Type: Interior ( ) Exterior moth ( ) I Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single family ( ) Two - family ( ) Multi family ( Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building:
No/Type of Fireplaces Existing: Gas Appliances ( ) Gas Logs ( ) Wood /Pellet ( ) Wood Burning ( )
No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Logs ( ) Wood /Pellet ( ) Wood Burning (NOT ALLOWED)
Does a Fire Alarm Exist: Yes ( ) No ( ) I Does a Fire Sprinkler System Exist: Yes ( ) No ( )
FOR OFFICE USE ONLY
Type of Construction: Date Received:
Occupancy Group: 7i Accepted By:
48"?8
F: \cdev \FORMS\ Permits \Building \building permit.DOC Page 1 of 16 02/09/2005
Questions? Call the Building Team at 479 -2325
A
Tile` VAIL 1 Building Permit Submittal Checklist
Department of Community Development
Project Name: 0?-- 4-� -.mercy
Project Address: G.�/id. -- 44"
✓ This Checklist must be completed before a Building Permit application is
accepted.
❑ All pages of application is complete
❑ Has DRB approval obtained (if required) Provide a copy of approval form
❑ Plan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee
schedule)
❑ Complete site plan submitted
❑ Public Way Permit application included if applicable (refer to Public Works checklist)
❑ Staging plan included (refer to Public Works checklist) No dumpster,parkinq or material storage
allowed on roadways and shoulders without written approval
❑ Asbestos test and results submitted if demolition is occurring
❑ Architect stamp and signature (All Commercial and Multi family)
❑ Full floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR
and Duplex, 5 sets of plans for Multi - Family and Commercial Buildings)
❑ Window and door schedule
❑ Full structural plans, including design criteria (i.e.loads)
❑ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
❑ Soils Report must be submitted prior to footing inspection
❑ Fire resistive assemblies specified and penetrations indicated
❑ Smoke detectors shown on plans _
❑ Types and quantity of fireplaces shown
X/
Applicant's Signature:
Date of submittal:
Received By:
F: \cdev \FORMS \Permits \Building \building.permit.DOC Page 2 of 16 02/09/2005
AIM*
1
TOWN OAIL "" PLAN CHECK FEES TABLE
Department of Community Development
Building Safety and Inspection Services
75 South Frontage Road
Vail, Colorado 81657
970 -479 -2138
FAX 970 -479 -2452
www.vailgov.com
Plan check fees are required for projects with a valuation over $100,000, at the time of Building permit
submittal. Please use the table below to calculate your plan check fee total.
{
ti
$100,000 - $150,000 Multiply by .0055 of Valuation Total
$150,001 - $250,000 Multiply by .005 of Valuation Total
$250,001 - $400,000 Multiply by .0045 of Valuation Total
$401,000 - $750,000 Multiply by .004 of Valuation Total
$750,001 - $1,000,000 Multiply by .0035 of Valuation Total
Valuations over $1,000,000 will be calculated by the Town of Vail Building Department.
If you have any further questions, please contact the Town of Vail Building Department at 970 - 479 -2128.
F: \cdev \FORMS\ Permits \Building \buildingjermit.DOC Page 3 of 16 02/09/2005
API*
1
TOWN OF VAL
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval,
a Planning Department review or Health Department review, and a review by the Building Department, the
estimated time for a total review will take as long as three (3) weeks.
All commercial (large or small) and all multi - family permits will have to follow the above mentioned maximum
requirements. Residential and small projects should take a lesser amount of time. However, if residential or
smaller projects impact the various above mentioned departments with regard to necessary review, these
projects may also take three (3) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit
is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may
affect future permits that I apply for.
Agreed to by:
Print nay e�
'"nature
Project Name: a " ' .)"
Date: • 2
F: \cdev \FORMS \Permits \Building \buildingpermit.DOC Page 5 of 16 02/09/2005
TOWN q
ASBESTOS TESTING REQUIREMENTS
THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING
ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING
MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE
NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
• I have included the asbestos test and report with my building permit application
applicant signature date
OR
• I certify my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (This will be verified during plan
review, and will delay your project if found to be inaccurate)
applicant signature — date
OR
• The building was constructed after October 12, 1988. The date of construction was
original construction date
applicant signature date
F: \cdev \FORMS \Permits \Building \building_pennit.DOC Page 4 of 16 02/09/2005
WHEN A "PUBLIC WAY PERMIT" IS REQUIRED
TOWN OF V
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT ":
o Is this a new residence? YES NO
o Does demolition work being performed require the us x0.11 f Right -of -Way, easements or
public property? YES NO '
o Is any utility work needed? YES NO
o Are there any improvements being done to the driveway? YES NO
o Is a different access needed to the site other than the existing driveway? YES NO
o Is any drainage work bei one that affects the Right -of -Way, easements, or public property?
YES NO
o Is a "Revocable Right -of -Way Permit" required? YES N
o Is the Right -of -Way, eas men public property to be used for staging, parking or fencing?
YES NO
If answer it NO, is a parkin ging or fencing plan required by Public Works?
YES NO
If you have answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications m •e obtained at the Public Works office or at Community Development (a sample is
attached). If you have any quei '10's please call Leonard Sandoval in Public Works at 970 -479 -2198.
I HAVE READ AND • ■ S , ALL THE ABOVE QUESTIONS.
• n • or Signature Company Name
Job or Project Name:
Date Signed: /X`-
PRJ #: -____
F: \cdev \FORMS \Permits \Building \building�ermit.DOC Page 7 of 16
l
APPLICATION PW #: -
FOR TOWN OF VAIL Parcel #:
PUBLIC WAY PERMIT 20 Bldg. Permit #: B _ _ -
1.
Job Name Street Address
(If unknown call
2. 479 -21391
Excavating Contractor Name Mail Address TOV Contractor License Number - REQUIRED
City State Zip Phone #
3.
Start Date Completion Date (Permit Expiration Date)
4. Work is for (circle one) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access
Other
5. Trench -width Length Depth
(min. 4') Total SF $
Total LF
Bond Amount $ Permit Fee $ Total Permit Fee $
6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED.
7. Rubber out - riggers are required on excavating equipment when working on asphalt. Asphalt surfaces underneath the bucket and lugs shall
be protected at all times.
8. A signature below indicates a review of the area and utility locations and approval. Once all utility company signatures are obtained ,
permittee has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures.
Please allow up to one week to process.
Xcel Energy / Public Service Company (1- 800 - 922 -1987)
Xcel Energy High Pressure (1- 800 - 922 -1987)
Quest (1- 800 - 922 -1987)
Comcast Cable (1- 800 - 922 -1987)
Eagle River Water & Sanitation District (970 -476 -7480, ext. 114)
Holy Cross Electric Company (1- 800 - 922 -1987)
Town of Vail Electricians (970 -479 -2158)
Town of Vail Irrigation (970 -479 -2158)
THERE WILL BE NO TOTAL STREET CLOSURES! A construction traffic control plan must be submitted and approved by the Public Works Department
prior to issuance of the permit.
9. All excavation must be done by hand within 18" of utilities — (Senate Bill 172).
10. Permittee must contact the Public Works Department at 476 - 2198 24 hours prior to commencing of work. Failure to Notify the Town will result in
forfeiture of bond money. Scheduled inspections that are not ready may result in the Town charging the contractor a reinspection fee.
11. I certify that I have read all chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and all utility Company agreements, signed
by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Signature of Agreement Print name clearly Date of signature
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN White — Public Works
Show street with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Yellow - Contractor
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
F: \uLl1 DE _ilding \building_permit.DOC Page 8 of 16 02/09/2005
1
- How it relates to Building Permits:
> Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an
application at either Community Development, located at 75 South Frontage Road or Public Works, located at
1309 Elkhorn Drive.
> Notice sign -offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing
application. Some utility companies require up to 48 hours notice to schedule a locate.
> A construction traffic control /staging plan must be prepared on a separate sheet of paper. An approved site plan
may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work
zone, (area of construction, staging, etc.). This plan will expire on November 1s and will need to be resubmitted
for consideration for approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
> Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work).
This may be drawn on the traffic control plan or a site plan for the job.
> Submit completed application to the Public Works office for review. If required, locates will be scheduled for the
Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48
hours to perform.
> The Public Works Construction Inspector will review the application and approve or deny the permit. You will be
contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of
being received, but please allow up to one (1) week to process.
> As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be
released. Please do not confuse the "Public Way Permit" with the "Building Permit ".
> NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until
November 15 A new Pub 'c Way Permit is required each year if work is not complete. Re-
application each Nove b - th does not mean an automatic renewal.
I have read and u •. - -= '� • h
/ e above.
_ j/--,,-A
Si ( Date Signed
q TOWN OF
F: \cdev \FORMS \Permits \Building \buildingpermit.DOC Page 9 of 16 02/09/2005
1
DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
• The Town of Vail Building Department has developed the following procedures to ensure that new construction
sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or
streets.
• The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of
Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or
street onto the construction site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard
Sandoval at 970 - 479 -2198 to request an inspection from the Public Works Department. Allow minimum of 24
hour notice.
• Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with
resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy
issuance.
t
Agreed to by: ��i -lyC €'
Print Na -
Signature _
Project Name: ai--.Q'�zy
Date Signed: t / /- ' V
F: \cdev \FORMS \Permits \Building \buildingjermit.DOC Page 10 of 16 02/09/2005
1 1
TO
liA9OPVAIC
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5 -2 -10: DEPOSITS ON PUBLIC WAYS PROHIBITED
❑ Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to
be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any
street, sidewalk, alley or public place, or any portion thereof.
❑ Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another
to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or
causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or
material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the
person so notified does not comply with the notice within the period of time herein specified, the Director of Public
Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other
material to be removed from any street or alley at the expense of the notified.
❑ Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person
who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of
the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section
1-4 -1 of this code.
❑ Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public
Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal
incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation
hereunder, be punishable as provided in Section 1-4 -1 of this Code. (1997 Code: Ordinance 6 (1979).
CODES 7 -3A -1 AND 7 -3A -3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
❑ No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under
such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance.
(Ord. 2(1968) § 1)
❑ Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any
place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left
unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions
prescribed by Colorado Revised Statutes section 42 -4 -1102, as amended, the officer shall require the vehicle to be
removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or
maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner
of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) § 3: Ord. 28(1981) § 1)
I have read and will comply with the above code provisions: 1/
a
Signature
Position or Relationship to ojec
Date Signed:
y
F: /everyone/fonns/bldperm7
F: \cdev \FORMS \Permits \Building \building permit.DOC Page 11 of 16 02/09/2005
•
1 1
Vail 2006
Vail Village and LionsHead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and LionsHead Village are invaluable assets to the community. Thousands of people come to Vail each year to
sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guests to
generate revenue. Our summer /winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town
of Vail finds it imperative to create and implement the Vail Village and LionsHead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the construction contractors and the merchants, to not actively participate to minimize
the impact of construction in the Vail and LionsHead Village areas.
The Vail Village Streetscape Project will continue through 2006. Improvements scheduled for F.
2006 will be concentrated along Gore Creek Drive west of the Children's Fountain, Gore Creek
Promenade and around the frontage of the Mill Creek Court Building. Additional streetscape
improvements are scheduled to begin along East Meadow Drive.
All construction projects and /or remodels within the Vail Village Core Area should contact e'
Scott Bluhm, Town of Vail Streetscape Coordinator, at 970 - 477 -3418 for further information.
Givens
The following givens are intended to provide the basic foundation by which construction will be completed in
the villages:
• The public's health, safety and welfare shall be honored at all times..
• Adequate pedestrian, loading /delivery, vehicle, and emergency vehicle access and circulation shall be
maintained.
• Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
• All construction deliveries, equipment, tools and materials entering the Vail Village and pedestrian areas
must go through CheckPoint Charlie. All LionsHead construction activity must go to the Vail Police
Department for a parking permit. Do not use delivery zones for construction parking; refer to approved k'
staging plan or make other arrangements for parking.
• The hours of outside construction activity shall be as follows:
- April 15 — June 23 & September 5 - November 17, 7:00 a.m. until 7:00 p.m., seven days a week.
June 30 thru September 1, work must end by 4:00 p.m. on Fridays.
November 13 — April 15, 2007 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7:00 a.m. to 11:30 a.m. on Gore Creek Drive and 7:00 a.m.
to 8:30 a.m. on Bridge Street.
F: \cdev \FORMS \Permits \Building \buildingjermit.DOC Page 12 of 16 02/09/2005
05 -02 -2011 Inspection Request Reporting Page 11
4:10 pm Vail, CO - City Of
Requested Inspect Date: Tuesday, May 03, 2011
Inspection Area: JRM
Site Address: 2039 CHAMONIX LN VAIL
CROOKED SKI TOWNHOMES
A/P /D Information
Activity B06 -0093 Type: A -MF Sub Type: AMF Status: ISSUED
Const Type Occupancy: Use: Insp Area: JRM
Owner CROOKED SKI TOWNHOUSE HOMEOWNERS
ASSOC
Contractor: MASTER SEALERS Phone: 970 - 476 -3975
Description: RE -ROOF; MOIRE BLACK -HOT TAR TO FULLY TAPERED 1/4" PER FOOT DROP, TORCH DOWN WITH
SAND
Requested Inspection(s)
Item: 90 BLDG -Final Requested Time: 10:00 AM
Requestor: MASTER SEALERS, INC. Phone: 970 - 476 -3975 -or- 970 -390-
6702
Assigned To: Entered By: JMONDRAGON K
Action: Time Exp:
C /7--
Inspection History
tem 226 FIRE DEPT. NOTIFICATION
tem 10 BLDG - FOOTING
tem 20 BLDG - Foundation /Steel
tem 30 BLDG - Framing
tem 50 BLDG - Insulation
tem 60 BLDG - Sheetrock Nail
tem 70 BLDG -Misc.
tem 90 BLDG -Final
tem 21 PLAN -ILC Foundation Plan
tem 22 PLAN -ILC FRAMING
REPT131 Run Id: 12990