Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B11-0166
-31 -2013 Inspection Requested Site Address: A/P /D Information Type: COMBO Activity: 611 -0166 Occu ancy. Const Type: Owner: CREEKVIEW PROPERTY LC Page Friday February 01 2013 VAIL ROWHOUSE UNIT 6A Sub Type: AMF Status: ISSUED Use. R -2 Insp Area: Phone: 970 - 845 -1001 Contractor: NEDBO CONSTRUCTION INC INSTALL NEW KITCHEN AND Description: REMODEL BATHROOMS. FINISHES (CASE, BASE, DOORS, FLOORS). Requested Insaection(sl Item: 90 BLDG -Final Requestor: Comments: 977 -0327 Assigned To: JMONDRAGON Time Exp: Action: Comment: annig o sign o handrail temp and needs reinspection with final product Comment: Extended permit from last performed inspection Item: 190 ELEC -Final Requestor: Comments: 977 -0327 Assigned tion: JMONDRAGO Time Exp: Comment: vo recp . m mech room to be G pro ec ed Item: 290 PLMB -Final Requestor: Comments: 977 -0327 JMONDRAGON KT Assigned Exp: _- tion: Comment: caulk al wa er c os s A Inspection History Item: 420 Spec Item: 10 BLU 0f2611 11 Comment: 11/16/11 Comment: 11/23/11 Comment: 12/01/11 Comment: 12/02/11 Comment: 12/08/11 Comment: 12/21 /11 REPT131 �1 Requested hone: 09:00 AM Entered By: MHAEBERLE K Requested p iho e: 10 :30 AM Entered By: MHAEBERLE K RequestedPTihone: 10'00 AM Entered By: MHAEBERLE K al rept "Approved " JRM Action: AP APPROVED SCANNED AND APPROVED actor: CIAL INSPECTION PACKET RECD ' Approved Action: PI PARTIAL INSPECTION actor: sgremmer footing Action: PI PARTIAL INSPECTION ector: sgremmer mn in NV� corner Sw ok pwer Si report Action: PI PARTIAL INSPECTION sector: JRM ;T/ WEST ENDS ALONG NORTH SIDE PI PARTIAL INSPECTION lector: sgremmer east and west walls ok per si Action: repction: A PA PARTIAL APPROVAL >actor: JRM TER ON SOUTH WEST CORNER ONLY PI PARTIAL INSPECTION sector: sgremmer #4 ail 13 on s5 wallg Action: PI PARTIAL INSPECTION vector: JRM Run Id: 15058 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MA0Fu 1, Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11 -0166 Job Address: 303 GORE CREEK DR VAIL Location......: VAIL ROWHOUSE UNIT 6A Parcel No....: 210108230018 OWNER CREEKVIEW PROPERTY LLC PO BOX 5450 AVON CO 81620 APPLICANT NEDBO CONSTRUCTION INC PO BOX 3419 VAIL CO 81658 License: C000003087 CONTRACTOR NEDBO CONSTRUCTION INC PO BOX 3419 VAIL CO 81658 License: 0000003087 06/08/2011 06/08/2011 Phone: 970-845-1001 06/08/2011 Phone: 970-845-1001 Description: REPLACE ALL INTERIOR FINISHES (CASE, BASE, DOORS, FLOORS). INSTALL NEW KITCHEN AND REMODEL BATHROOMS. Project #: Applied.....: Issued... P RJ 11 -0194 06/08/2011 09/21/2011 Occupancy: R3 Type Construction: VB Valuation: $200,000.00 ...... ............................... .... >........_._ ._...,............._.... FEE SUMMARY .. _...................._...............,.. .......,.........,............. Building Permit ------ - - - - -> $4,658.75 Bldg Plan Check ----- - - - - -> $3,028.19 Use Tax Fee------------------ - - - - -> $3,800.00 Electrical Permit ---- - - - - -> $276.00 Elec Plan Check ------ - - - - -> $179.40 Restuarant Plan Review--- - - - - -> $0.00 Mechanical Permit - - - - - -> $1,100.00 Mech Plan Check ---- - - - - -> $275.00 Additional Fees--------------- - - - - -> $15,000.00 Plumbing Permit --- - - - - -> $825.00 Plmb Plan Check ---- - - - - -> $206.25 Recreation Fee--------------- - - - - -> $0.00 Investigation------------------ - - - - -> $0.00 Will Call ------------------------------ > $20.00 TOTAL PERMIT FEES --- ---------- > $29,368.59 Payments -- ---------------------------- > $29,368.59 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00P . Sture of Owner ontractor Date 71, `,q,� CS L') Print Name combination permit_012811 OVAUL"TOWN CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B11 -0166 Owner: CREEKVIEW PROPERTY LLC VAIL ROWHOUSE UNIT 6A Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 Cond: CON0012164 All exterior lights shall be "full cut -off' style fixtures and be in compliance with the provisions of Section 14 -10 -7, Outdoor Lighting, Vail Town Code. Cond: CON0012165 The crawlspace shall have an opening of no larger than 12 square feet in area, and shall be in compliance with the provisions of Chapter 12 -15, Gross Residential Floor Area, Vail Town Code. combination permit_012811 Address: 303 GORE CREEK DR VAIL Location: TOWN OVARL REQUIRED INSPECTIONS AND STATUSES Permit #: B11 -0166 Owner: CREEKVIEW PROPERTY LLC VAIL ROWHOUSE UNIT 6A Address: 303 GORE CREEK DR VAIL Location: Item: 00120 ELEC -Rough Item: 00200 MECH -Rough Item: 00220 PLMB- Rough /D.W.V. Item: 00230 PLMB- Rough/Water Item: 00030 BLDG - Framing Item: 00060 BLDG - Sheetrock Nail Item: 00190 ELEC -Final Item: 00290 PLMB -Final Item: 00390 MECH -Final Item: 00090 BLDG -Final combination permit_012811 TOWN OF VAIL, COLORADO Statement Statement Number: R110001273 Amount: $19,436.94 09/21/201102:01 PM Payment Method: Check Init: DR Notation: CK# 40713 NEDBO ----------------------------------------------------------------------------- Permit No: Bll -0166 Type: COMBINATION BLDG PERMIT Parcel No: 2101 - 082 - 3001 -8 Site Address: 303 GORE CREEK DR VAIL Location: VAIL ROWHOUSE UNIT 6A Total Fees: $29,368.59 This Payment: $19,436.94 Total ALL Pmts: $29,368.59 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- BP - - - - -- 00100003111100 ------------------------ - - - - BUILDING PERMIT FEES -- ------ - - - - -- 3,105.00 MP 00100003111100 MECHANICAL PERMIT FEES 1,000.00 PP 00100003111100 PLUMBING PERMIT FEES 331.94 UT 11000003106000 USE TAX 4% 15,000.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R110001076 Amount: $2,873.81 08/26/201111:47 AM Payment Method: Check Init: LC Notation: #40549 /NEDBO CONSTRUCTION ----------------------------------------------------------------------------- Permit No: Bll -0166 Type: COMBINATION BLDG PERMIT Parcel No: 2101 - 082 - 3001 -8 Site Address: 303 GORE CREEK DR VAIL Location: VAIL ROWHOUSE UNIT 6A Total Fees: $29,368.59 This Payment: $2,873.81 Total ALL Pmts: $9,931.65 Balance: $19,436.94 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts - ------------- - - - PF 00100003112300 - -- ------------------------ - - - - -- ------ - - - - -- PLAN CHECK FEES 2,455.75 PP 00100003111100 PLUMBING PERMIT FEES 418.06 TRANSMITTAL FORM Revision Submittals: 1. "Field Set' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: 9 i I - 0 1 W� QQ Revisions () Response to Correction Letter _attached copy of correction letter () Deferred Submittal () Other Project Street Address: -363 6c,-c C+,� �� . / A Description / List of Changes: (Number) (Street) (Suite #) — �rtw� Sf"'VeI'm/ ���c3 %� e'�y� «l Building /Complex Name: V�� -Town6P*& �(U ) l�C�igni[�� �hI�NSGS Contact Information: Company: NeJ6 Consf twd --, � "t, Company Address: 170 f3 c,,x 3 t) I q City: 4 t State: (0 Zip: fr )lc�� Contact Name: (411;,e Contact Phone: 00 - cf77" 0Z 69 E -Mail relke 12 heAc,(C" Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: $_ 60 Wo Plumbing: $ S OVD Electrical: $ Sri c9 o Mechanical: $_ [U Total: $ �5-0. (use additional sheet if necessary) .... ... _ Date Received: D [E C EodFF D AUG 2 3 2011 TOWN OF VAIL 01- Jan -10 r t r9- a Job Name: C --e4y+ u,; `; �' ob Address: 305 Cxre C. - (6A MEOFV/d ` Permit No.: SPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 9701 of the IBC) The owner or his/her representative, on the advice of the design professional in responsible charge, shall complete; seal 'sign and submit a copy of the " "Special Inspection Agreement and Structural Tests Scheduled, to the Town of Vail for review and approval. Signatures are required on both pages; photocopied or faxed signatures are acceptable. The owner and his /her general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1. Contractor is responsible for proper notification to the Inspection or Testing agency for items listed.(Page 1) (IBC 1704) 2. Only the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on a weekly basis. 4.1 Inspection agency to- submit names and qualifications of on -site special inspectors to the Town of Vail for review and approval.( Page 2) 5. The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and/or problems encountered. 6. It is the responsibility of the contractor to review the Town of Vail approved plans for additional inspection or testing requirements that may be. noted. A pre - construction conference at the job site is recommended to review special inspection procedures. 7. The special inspector shall use only the Town of Vail approved drawings. 8. All special inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re- inspections. BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and sealed statement that all items requiring testing and inspection were fulfilled and reported. Those items not tested and /or inspected shall be noted in this statement. A copy of the statement shall be maintained at the job site for the Building Inspector's review prior to final inspection. Acknowledgement: Lu.. °re& ('X, la a Owner:�Le{ t ynern P �fk;� 8 "� S' ature Pn aName Date Special Insp o, - ����� Agency: — ''r_�_..ar� � S ✓e;.,, E- - �� ,.� �c=- Signature Print Name Project Arch/Eng: Signatum !� Date Print Name i Contractor: !,4)u c$ C es' Gjl.,^ �-- Sig ture el Print Name) Date TOWN *VAIL Job Name: _ C-_- dCJ;s4J Trvplt4 ,�ob Address: 303 (-Zm 6, . k 6r. 6H Permit No.: SPECIAL. INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC) The owner or his /her representative, on the advice of the design professional in responsible charge, shall complete,: sea% sign and submit a copy of the Special --- I-rigAddti6n: Agreement and Structural Tests Scheduled to the- Town - -of —Vail for review and approval. Signatures are required on both pages; photocopied or faxed signatures are acceptable. ....._...__i:.:: __ ..... . ..:...: . The owner and his /her general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1. Contractor Is responsible for proper notification to the Inspection or Testing agency for items listed.(Page 1) (!PC 1704) 2. Only the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on a weekly basis. 4. Irspection agency to submit names and qualifications of on -site special inspectors to the Town of Vail for review and approval.( Page 2) 5. The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and /or problems encountered. 6. It is the responsibility of the contractor to review the Town of Vail approved plans for additional inspection or testing requirements that may be noted. A pre - construction conference at the job site is recommended to review special inspection procedures. 7. The special inspector shall use only the Town of Vail approved drawings. 8. All special inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re- inspections. BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and sealed statement that all items requiring testing and inspection were fulfilled and reported. Those items not tested and /or inspected shall be noted in this statement. A copy of the statement shall be maintained at the job site for the Building Inspector's review prior to final inspection. Acknowledgement: C'_.r�0_eKU1-ew ptb�'2A /ILIC- ��1►4 It"' 9-.23—/( Owner: Lq,vttufrua 1M em R / Si ure J PdP1 Name Date Special inspection Agency: -3- Signature Print Name Date Project `, ` , • ` Siggn`atur Print Name Date Contractor: G (� !C 1,4)u cQ k11 e_���_ Sig ture V Print Namef Date -3- REScheck Software Version 4.4.1 Compliance Certificate Project Title: Gallardo Residence Energy Code Location. Construction Type Project Type Heating Degree Days Climate Zone: Construction Site: 313 Gore Creek Dr Vail. CO 2009 IECC Vail, Colorado Multifamily Addition /Alteration 9248 6 Owner/Agent Unit 6A ,Pompliance: Compliance: 6.7% Better Than Code Maximum UA: 120 Your UA: 112 The % Belief or Worse Than Code index reflects how dose to compliance the house ts based on code trade -off rules It DOES NOT provide an estimate of energy use or cost relative to a mvumum -code home Designer/Contractor: Chuck Langston AEC 40801 US Hwy 6824 Ste 214 Avon, CO 81620 970- 748 -8520 chuck @aec- vail.com Window 1: Wood Frame:Double Pane with Low -E 10 0.329 3 Window 2: Wood Frame Double Pane with Low -E 16 0329 5 Window 3: Wood Frame:Doub +e Pane with low -E 17 0 329 6 Window 4 Wood Frame:Double Pane with Low -E 36 0 329 12 Window 5: Wood Frame:Double Pane with Low -E 16 0.329 5 Door 1: Glass 74 0.329 24 Door 2: Glass 38 0.329 13 Door 3 Solid 28 0.329 9 Door 4: Glass 67 0 329 22 Door 5: Glass 38 0.329 13 Compliance Statement The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. �jYl1lG � t.rtt ity �.a � — �.•ti,.1s/ - -� -- ,, f/` �e,;� � � 11 Name - Title lgnature Date Jr Project Title: Gallardo Residence Report date: 08/15!11 Data filename P: \Current Projects \11054 00 - Creek View Residence\Calcu lations\COM check\ 1 1054-Rescheck.rck Page 1 of 4 CNJ(REScheck Software Version 4.4.1 Inspection Checklist Windows: L ] Window 1 Wood Frame Double Pane with Low -E. U- factor 0 329 For windows without labeled U- factors, describe features. #Panes _ Frame Type Thermal Break? _ Yes _ -_ No Comments: U Window 2 Wood Frame Double Pane with Low -E. U- factor 0 329 For windows without labeled U- factors, describe features: #Panes _ Frame Type Thermal Break? Yes No Comments: U Window 3 Wood Frame:Double Pane with Low -E, U- factor: 0.329 For windows without labeled U- factors, describe features. #Panes — Frame Type Thermal Break? Yes No Comments U Window 4 Wood Frame Double Pane with Low -E, U- factor: 0.329 For windows without labeled U- factors, describe features: #Panes _ Frame Type Thermal Break? Yes No Comments: U Window 5 Wood Frame:Double Pane with Low -E. U- factor 0 329 For windows without labeled U- factors, describe features #Panes _ Frame Type Thermal Break? — Yes No Comments Doors: U Door 1 Glass, U- factor: 0.329 Comments: U Door 2: Glass, U- factor: 0.329 Comments U Door 3: Solid, U- factor: 0.329 Comments: U Door 4 Glass, U- factor: 0 329 Comments. F I Door 5 Glass, U- factor 0 329 Comments Air Leakage: Lj Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film of solid material U Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs /showers, and in openings between window /door jambs and framing U Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk between the housing and the interior wall or ceiling covering U Access doors separating conditioned from unconditioned space are weather - stripped and insulated (without insulation compression or damage) to at least the level of insulation on the surrounding surfaces Where loose fill insulation exists, a baffle or retainer is installed to maintain insulation application Project Title: Gallardo Residence Report date: 08/15111 Data filename: P: \Current Projects111054,00 - Creek View Residence\ Calculations \COMcheck\11054 - Rescheck rck Page 2 of 4 Lj Wood - burning fireplaces have gasketed doors and outdoor combustion air Air Sealing and Insulation: U Building envelope air tightness and insulation installation complies by either 1) a post rough -in blower door test result of less than 7 ACH at 33 5 psf OR 2) the following items have been satisfied: (a) Air barriers and thermal barrier Installed on outside of air - permeable insulation and breaks or joints in the air barrier are filled or repaired (b) Ceiling /attic: Air barrier in any dropped ceiling /soffit is substantially aligned with insulation and any gaps are sealed (c) Above -grade walls. Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier (d) Floors Air barrier is installed at any exposed edge of insulation (e) Plumbing and wiring. Insulation is placed between outside and pipes Batt insulation is cut to fit around wiring and plumbing, or sprayed /blown insulation extends behind piping and wiring (f) Corners, headers narrow framing cavities, and rim joists are insulated (9) Shower /tub on exterior wall: Insulation exists between showers /tubs and exterior wall. Sunrooms: U Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U- factor of 0.50 and the maximum skylight U- factor of 0 75 New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements Materials Identification and Installation: Materials and equipment are installed in accordance with the manufacturer's installation instructions Li Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R- value. Lj Materials and equipment are identified so that compliance can be determined. Li Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided 0 Insulation R- values, glazing U- factors, and heating equipment efficiency are clearly marked on the building plans or specifications Duct Insulation: C.1 Supply ducts in attics are insulated to a minimum of R -8 All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R -6 Duct Construction and Testing: Lj Building framing cavities are not used as supply ducts ❑ All joints and seams of air ducts, air handlers, filter boxes. and building cavities used as return ducts are substantially airtight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction Metal duct connections with equipment and /or fittings are mechanically fastened Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet -metal screws Exceptions Joint and seams covered with spray polyurethane foam Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in w.g (500 Pa) U All ducts and air handlers are located within conditioned space Temperature Controls: Li Thermostats exist for each dwelling unit (non - dwelling areas must have one thermostat for each system or zone) A manual or automatic means to partially restrict or shut off the heating and /or cooling input to each room is provided Electric Systems: J Separate electric meters exist for each dwelling unit Heating and Cooling Equipment Sizing: Lj Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code J For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and /or Service Water Heating (Sections 503 and 504) Circulating Service Hot Water Systems: Lj Circulating service hot water pipes are insulated to R -2 J Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use Project Title: Gallardo Residence Report date: 08/15/11 Data filename P: \Current Projects \11054.00 - Creek View Residence\Calculations\COMcheck \11054- Rescheck rck Page 3 of 4 Heating and Cooling Piping Insulation: u HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R -3 Swimming Pools: ❑ Heated swimming pools have an on /off heater switch L] Pool heaters operating on natural gas or LPG have an electronic pilot light u Timer switches on pool heaters and pumps are present Exceptions Where public health standards require continuous pump operation Where pumps operate within solar- and /or waste- heat - recovery systems Heated swimming pools have a cover on or at the water surface For pools heated over 90 degrees F (32 degrees C) the cover has a minimum insulation value of R -12 Exceptions Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source. Lighting Requirements: U A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following (a) Compact fluorescent (b) T -8 or smaller diameter linear fluorescent (c) 40 lumens per watt for lamp wattage <= 15 (d) 50 lumens per watt for lamp wattage > 15 and <= 40 (e) 60 lumens per watt for lamp wattage > 40 Other Requirements: U Snow- and ice - melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling and c) the outdoor temperature is above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement 'c') Certificate: J A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values' window U- factors; type and efficiency of space - conditioning and water heating equipment The certificate does not cover or obstruct the visibility of the circuit directory label. service disconnect label or other required labels NOTES TO FIELD: (Building Department Use Only) Project Title: Gallardo Residence Report date: 08/15/11 Data filename P:\Current Projects \11054.00 - Creek View Residence\ Calculations \COMcheck \11054- Rescheck.rck Page 4 of 4 2009 IECC Energy Efficiency Certificate Insulation Ratin Ceiling / Roof 0.00 Wall 0.00 Floor / Foundation 000 Ductwork (unconditioned spaces): Door Rating • Window 0.33 Door 0.33 NA • & Cooling Equipment Heating System: Cooling System:_ Water Heater: Name: Date: Comments: NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES m4W OF Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11 -0166 Job Address: 303 GORE CREEK DR VAIL Location......: VAIL ROWHOUSE UNIT 6A Parcel No....: 210108230018 OWNER PARKS, MARGRETTA B.& CHRISTO 06/08/2011 PO BOX 1850 VAIL CO 81658 APPLICANT NEDBO CONSTRUCTION INC 06/08/2011 Phone: 970 - 845 -1001 PO BOX 3419 VAIL CO 81658 License: C000003087 CONTRACTOR NEDBO CONSTRUCTION INC 06/08/2011 Phone: 970 - 845 -1001 PO BOX 3419 VAIL CO 81658 License: 0000003087 Description: REPLACE ALL INTERIOR FINISHES (CASE, BASE, DOORS, FLOORS). INSTALL NEW KITCHEN AND REMODEL BATHROOMS. Project #: Applied.....: Issued... P RJ 11 -0194 06/08/2011 06/27/2011 Occupancy: R3 Type Construction: VB Valuation: $200,000.00 ------- ............. ................. .... .. «....,.,......,.....,,._..... FEE SUMMARY ..._._< «.,,, ....<_,,,>....,,........,...,.... ....,....................,.._.. Building Permit ------ - - - - -> $1,553.75 Bldg Plan Check ----- - - - - -> $1,009.94 Use Tax Fee------------------ - - - - -> $3,800.00 Electrical Permit ---- - - - - -> $276.00 Elec Plan Check ------ - - - - -> $179.40 Restuarant Plan Review--- - - - - -> $0.00 Mechanical Permit - - - - - -> $100.00 Mech Plan Check ---- - - - - -> $25.00 Additional Fees--------------- - - - - -> $0.00 Plumbing Permit --- - - - - -> $75.00 Plmb Plan Check ---- - - - - -> $18.75 Recreation Fee--------------- - - - - -> $0.00 Investigation------------------ - - - - -> $0.00 Will Call ------------------------------ > $20.00 TOTAL PERMIT FEES -- ----------- > $7,057.84 Payments -- ---------------------------- > $7,057.84 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE T ENT -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:OOAM- 4:OOPM' 1 �K r 6-27-1) Si ture of Owne or Con F6 for Date p 10,v 0 '1 Print Name combination permit_012811 OV�AILL TOWN fk**** f* k* xxx******* kxfxxxk**** f* xxx* k****** kx** fk***** xx* kxkk* x** fff* f* ff** f*** fffff* fxffffkx**** fkx* xfxx*** fff* xxx*** xxfkxx* x** kx* xxxxx** xkxx* x**** xkkxx * * * *kkkxk * * * *k *kkx *f *xfxxk* CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B11 -0166 Address: 303 GORE CREEK DR VAIL Owner: PARKS, MARGRETTA B.& CHRISTOPHER L. Location: VAIL ROWHOUSE UNIT 6A *** kkx****** kk** f******* fxxxxx******* kx* xxf***** k**** x* k***** xxf k******* x* xf***** kkx** f*** ffxf** xk* f* f*** k* f** k***** xxkx****** xxxkx*** f* xx* kx***** kxk* *f * * *f *k *f * * * * *x * * * * * * * *x * * * * ** Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 combination permit_012811 OVAMIL TO N REQUIRED INSPECTIONS AND STATUSES Permit #: B11 -0166 Address: 303 GORE CREEK DR VAIL Owner: PARKS, MARGRETTA B.& CHRISTOPHER L. Location: VAIL ROWHOUSE UNIT 6A Item: 00120 ELEC -Rough Item: 00200 MECH -Rough Item: 00220 PLMB- Rough /D.W.V. Item: 00230 PLMB- Rough/Water Item: 00030 BLDG - Framing Item: 00060 BLDG - Sheetrock Nail Item: 00190 ELEC -Final Item: 00290 PLMB -Final Item: 00390 MECH -Final Item: 00090 BLDG -Final combination permit_012811 TOWN OF VAIL, COLORADO Statement Statement Number: R110000702 Amount: $6,047.90 06/27/201102:26 PM Payment Method: Check Init: SAB Notation: 40301 NEDBO CONSTRUCTION ----------------------------------------------------------------------------- Permit No: Bll -0166 Type: COMBINATION BLDG PERMIT Parcel No: 2101 - 082 - 3001 -8 Site Address: 303 GORE CREEK DR VAIL Location: VAIL ROWHOUSE UNIT 6A Total Fees: $7,057.84 This Payment: $6,047.90 Total ALL Pmts: $7,057.84 Balance: $0.00 ACCOUNT ITEM LIST: Account Code -------------------- BP 00100003111100 EP 00100003111100 MP 00100003111100 PF 00100003112300 PP 00100003111100 UT 11000003106000 WC 00100003112800 Description BUILDING PERMIT FEES ELECTRICAL PERMIT FEES MECHANICAL PERMIT FEES PLAN CHECK FEES PLUMBING PERMIT FEES USE TAX 4% WILL CALL INSPECTION FEE Current Pmts 1,553.75 276.00 100.00 223.15 75.00 3,800.00 20.00 SO-Oke(� � `Consulting Final Clearance Air Monitoring Report 303 Gore Creek Dr, Unit 613, Vail, Colorado 81657 Presented To: Mr. Nicolas A. Gonzales MDR Corporation 10650 Irma Dr, Unit 15 Northglenn, CO 80233 Performed & Prepared By: Mr. Robert E. Kurvink DS Consulting, Inc. PO Box 6864 Avon,CO 81620 (720) 292 -8979 Project Details: Project Number: 4287 Conducted: June 22, 2011 (�IEC[Ef1WIE(� JUN 27 2091 UI TOWN OF VAIL PROJECT SUMMARY On June 22, 2011, Mr. Robert E. Kurvink with DS Consulting, Inc. (DSC) conducted a final visual inspection, performed aggressive clearance air monitoring, and analyzed clearance air - quality samples via Phase Contrast Microscopy (PCM) for an asbestos abatement project within a portion of the residence located at 303 Gore Creek Dr, Unit 613, Vail, Colorado. Services were provided at the request of Mr. Roland J. Kjesbo with NEDBO Construction in support of asbestos abatement activities being conducted to remove approximately 800ft2 of friable, asbestos - containing drywall ceiling texture from a full containment encompassing portions of the main level. Monitoring locations and frequencies were determined by Mr. Robert E. Kurvink; having EPA and State of Colorado accreditation No. 15413. PCM analysis was also performed by Mr. Kurvink (see Appendix B for certification). SCOPE OF WORK Prior to the collection of final clearance air samples, a final visual inspection was conducted to ensure all of the visual requirements were met. Once the abatement area passed the final visual inspection, DSC collected final clearance air samples from random locations within the containment. Following the collection of the final clearance air samples, Mr. Kurvink analyzed the samples - as well as sample blanks - to determine the airborne fiber concentrations. Mr. Kurvink is NIOSH 582 certified and DSC is a participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 and has a rating of Proficient. The abatement project passed the final visual inspection and the analytical results of all final clearance samples collected were below the State of Colorado's clearance criteria of 0.01 fibers /cubic centimeter (f /cc) (see Appendix A for Air Sample Analysis). This amount, quantified as "fibers ", is not specific to asbestos fibers; therefore, all fibers that meet the counting criteria are counted as asbestos fibers. If the total fiber count is less than 0.01 fibers /cubic centimeter (f /cc), it is known that the total asbestos fiber count is also less than 0.01 fibers /cubic centimeter (f /cc). PROJECT INFORMATION • General Abatement Contractor (GAC) MDR Corporation • GAC Project Supervisor Mr. Jim Juaregui • Project Location 303 Gore Creek Dr, Unit 613, Vail, Colorado • Project Contact Mr. Jim Juaregui Pa • Air Monitoring Specialist /Analyst Mr. Robert E. Kurvink • Date Conducted June 22, 2011 • Final Clearance Sample Results See Appendix A • Certifications See Appendix B AIR MONITORING Air - quality samples were collected utilizing a modified NIOSH 7400 Method, whereby samples were collected on 25- millimeter (mm) mixed - cellulose, ester - membrane filters with 0.45- micron pore size and analyzed via Phase Contrast Microscopy (PCM) as per the customer's requirements. Sample Collection - PCM samples, when applicable, were collected on 25- millimeter (mm) mixed - cellulose, ester - membrane filters with 0.45- micron pore size with an effective collection area of 385 mm. All filters were pre - assembled by the manufacturer in three stages, conductive sampling cassettes with extension cowls. Air samples were collected at an average flow rate 12.5 liters per minute (L /m) using Thomas high - volume pumps with a minimum of 1,200 liters being collected. Flow rates were collected at the beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a primary -flow calibration instrument. Start times and stop times were recorded for all sampling periods. A field blank and lab blank were also collected and analyzed along with the five (5) clearance samples. PCM Sample Analysis Method - PCM samples were analyzed according to a modified NIOSH 7400 Method —A Counting Rules— although samples were collected on 25 -mm mixed - cellulose, ester - membrane filters with 0.45- micron pore size and analyzed via PCM. Air sample results contained in this report have been calculated with blank sample corrections. APPENDIX A - AIR SAMPLE RESULTS Sample ID CL -309 Pump Typ Hi vol. Sample Northeast Bedroom Avg. 12.5 Start 12:41 .. 2:17p Time 96 Vol. 1200 Fibers 3.5/100 Results BRL CL -327 Hi vol. Full Bathroom 12.5 12:42 2:18p 96 1200 5.0 100 0.002 CL -293 Hi vol. Hallway 12.5 12:43 2:19p 96 1200 8.01/100 0.003 CL -851 Hi vol. Kitchen 12.5 12:44 2:20p 96 1200 4.5/100 BRL CL -473 Hi vol. Living Room 12.5 12:45 2:21p 96 1200 12.5/100 0.005 CL -lb n a Lab Blank n a n a n a n a n a 0/100 0.000 CL -fb n a Field Blank n a n a n a n a n a 0/100 1 0.000 BRL = Below Reporting Limit 3 APPENDIX B - AMS /ANALYST CERTIFICATIONS STATE OF COLORADO ASBESTOS CERTIFICATION* Coltxado Deparhnhent of Public Wealth and Lnvironment Air Pollution Contml thvtsion This ,cruties thm Robert E Kurvink Cerlffkatiun No: 9440 has net the rcywrernritu o(25-7-507, C.R.S. and Air Quality Control Commission Regulation No. 8, Part B, and is hereby certified by the state of Colorado in The following discipline- Air Monitoring Specialist* lased: 2/1112011 Y.aplrer w: 21114012 -1 .weft...«.. rk Ar.4iur ipwyv /.V e 4 06/15/2011 11:28 FAX all -01Wo X10002/0002 Colorado Department of Public Health and Environment Air Pollution Control Division — indoor Environment Program — Asbestos /IAQ unit 4300 Cherry Creek Drive South, APCD -IE -61 Denver, Colorado 80246 -1530 Phone: 303- 692 -3100 —Fax: 303- 782 -0278 E -mail: asbestos @state.co.us ASBESTOS Al3ATMNT PERMIT This permit is granted subject to Colorado Air �I and eff+tive January 30, 2008, the Colorado AirPollution Prevention and Control Act (25-7-101 r 25-7 -5 01 December 21, seq., C.R. S. 2007, the followin g provisions. It is only for the purpose of allowing ) a asbestos abatement. ADDITRONAT pERMIT PROVISIONS By performing work under this permit the abatement contractor; agrees that the Division may revoke or suspend this permit should the Division find that the contractor: • has violated or has aided and abetted in the violation, o .2�5- 7- 101:or 25 -7 -501 et seq., CRS. or Regulation No. 8, Part B, or an order of the Division or Commission, • has failed to meet any permit and notification. re_ u' ements� _ 1 d o cpuect an inspection within a reasonable period of time, as be deterthm�ed by the Division, cited by the Division during any • has used misrepresentation or fraud in obtaining this permit, or,l • has committed any act or omission which does not meet generally accepted standards of the practice of asbestos � h abatement. As a contractor, you may subject to other licenses and per mits,Idepending on the requirements of the county and municipality in which the work is being performed, The Colorado DepartmentiofPublic Health and Environment, Air Pollution Control Division strongly suggests that you check with county and municipal authorities in order to determine any other local buildi � ermitting requirements that must be met. I HE ORIGINAL PERMIT MUST BEI POSTED .ON SITE AT ALL TIMES. Immediately notify the Asbestos/L4Q Unit Of Project moth l the appropriate county health department by fax Project mody1'ca'ons include Scheduled srpe(aof work or the and above) or scheduled work dales, etc. in the co jl This asbestos abatement permit is valid beginning 6/9/2011 through 11:59 PM on 7/ I The actual scheduled work dates are from 6/9/2011 through 6/11/2011. 8/2011. Approval issued on: 6/1/2011 Record' umber: 78408 Fee paid: $400.00 Notice dumber: I IEA1999A Check number: 24506 Variance: None Project Supervisor: Comme'ts: None Timothy Jauregui - Cerification No.: 14305 For the cation specified below: Vacant Residence Project k\4S: Maio Level B Steve Shurtliff 303 Gore Creek Dr., Unit 613 Vail' Cerification No.: 15413 Eag]e County Project Manager: This permit has been issued to: MDR Corporation 10650 Irma Drive, 915 Northglenn, Co 80233 -3626 Issued by: LBM i ` 0 oy Department of Community Development ,75 South Frontage Road Vail, Colorado 81657 Tel: 970 - 479 -2128 Web: www.vailgov.com ''Development Review Coordinator BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project Street Address: 3 03 60re- Crc k 1br, (Number) (Street) Building /Complex Name: 614 (Suite #) Contractor Information Business Name: li+ {�� `pn5��✓���� Business Address: ?O sm >41q City A ai I State: (O Zip: X165$ Contact Name: QoHle- lges6o Contact Phone: 470--�,gt -77- ON 6-9 Contact E -Mail: fbwe& h+Ac, c0M Contractor Registration Number: z574 Owner /Owner's Representative Signature (Required) Project Information Owner Name: i(ree ue i U-6, Project #: e : /4- Building Permit #: �El\— OI 106 Lot #: Block # Subdivision: Work Class: New ( ) Addition ( ) Alteration (X ) Type of Building: Single - Family ( ) Duplex ( ) Multi - Family ( ) Commercial ( ) Other (X) hcvu_ Work Type: Interior (X) Exterior( ) Both W Valuation of Work Included Plans Included Work Electrical ( ) )Yes ( ) )No ( ( )Yes ( ) )No t t Mechanical ( ) )Yes ( ) )No ( ( )Yes ( ) )No 1 1�&00 Plumbing ( ) )Yes ( ) )No ( ( )Yes ( ) )No 5 5,0W Parcel #: ZIOI — 6z67-- 30-016 Value of all work being performed: $ ZCO OW (value based on IBC Section 109.3 & IRC Section 108.3) PER (For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit www.eaglecounty.us /patie) Electrical Square Footage a3'15 COLLOT`I Detailed Scope and Location of Work: (4?1w a,11 iA- ier�ul� {i+tiS�eS r%uk. lx�c� dacKS, t��e�) .A"5- 11 nex) kWlyn and -emc%/ 94�Arxin5. (use additional sheet if necessary) For Office Use Only: Fee Paid: Received From: Cash Check # _ CC: Visa / MC Last 4 CC # Auth # exp date: Date Received: I19EO16CEn I�( JUN 07 2011 lUl TOWN OF VAIL O1- Jan -11 State of Colorado Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including multi - family /condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified abatement contractor. The air clearance letter or form must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: F1 Will not disturb more than the threshold limits identified above. ❑ Tested negative, or at 1% or below (1 copies of test results included) © Tested positive at more than 1 %, requires abatement (1 copies of test results included) Tips & Facts: • Even recent construction projects may include asbestos - containing materials, so buildings of gny age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: Fire Prevention Bureau Vail Fire Department 75 S Frontage Rd Fire—inspectors@vailgov.com 970 - 479 -2252 www.vailgov.com State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303 - 692 -3158 asbestos @state.co.us www.cdphe.state.co. us 01 -Jan-] 1 DS Consulting, Inc. Asbestos Inspection and Sampling Report 303 Gore Creep Dr, Unit 6B, Vail, Colorado 81657 Presented To: Mr. Steve Walker Nedbo Construction 40690 US Hwys 6 & 24 Avon, Colorado 81620 Performed & Prepared By: Mr. Steve Shurtliff DS Consulting, Inc. PO Box 6864 Avon,CO 81620 (303) 378 -1544 Project Details: Project Number: 3676 Conducted: March 4, 2011 EXECUTIVE SUMMARY On March 4, 2011, Mr. Steve Shurtliff with DS Consulting, Inc. (DSC) performed a limited asbestos inspection and performed asbestos bulk - sampling at 303 Gore Creek Dr, Unit 613, Vail, Colorado, in order to identify potentially hazardous friable and non - friable asbestos - containing materials (ACM) within a portion of the above - referenced, single- family residence scheduled for renovations. The Colorado Department of Public Health and Environment's (CDPHE) Regulation 8, Part B defines an asbestos - containing material (ACM) as a material containing more than 1% asbestos. Mr. Shurtliff collected a total of sixteen (16) asbestos bulk- samples from the following locations within the residence: • Plaster Walls Type1- Main Level NW Bedroom, Lower Level Laundry Room and NW Bedroom • Plaster Walls Type 2 - Main Level N Bathroom, N Hallway and NE Bedroom • Plaster Ceiling Type 1- Main Level NE Bedroom and Dining Room • Drywall Type 1- Main Level Living Room, Stairwell to Lower Level • Drywall Type 2 - Lower Level NW Bathroom and W Bathroom • Resilient Floor Tile Type 1- Lower Level Laundry Room All sixteen (16) bulk - samples were analyzed by Aerobiology Laboratory Associates, Inc. (NVLAP #200860 -0) in Denver, Colorado with four (4) laboratory results being positive for asbestos greater than 1% Chrysotile (see Appendix B for laboratory results). The following sampled materials were found to contain asbestos greater than 1 % (ACM): *Quantities are approximations of damaged material and /or material to be removed and are subject to field verification, DO NOT use for bidding purposes. 2 Sample Material Sample Material Friable/ Estimated Material Asbestos Description Non- PL03 -01 Plaster Main Level NE Surfacing Friable <1,000ftz Good 4% Bedroom Ceiling Material Chrysotile PL03 -02 Plaster Main Level NE Surfacing Friable <1,000ftz Good 5% Bedroom Ceiling Material Chrysotile Main Level Surfacing 5% PL03 -03 Plaster Dining Room Material Friable <1,000ft 2 Good Chrysotile Ceiling FT01 -01 Resilient Lower Level Miscellaneous Non- Unknown Good 2% Floor Tile Laundry Room Material Friable Chrysotile *Quantities are approximations of damaged material and /or material to be removed and are subject to field verification, DO NOT use for bidding purposes. 2 PROJECT OVERVIEW I. Introduction A limited asbestos inspection and bulk - sampling for ACM was conducted at 303 Gore Creek Dr, Unit 613, Vail, Colorado, by Mr. Shurtliff on March 4, 2011 at the request of Mr. Steve Walker with Nedbo Construction. Mr. Shurtliff is a Colorado State Certified Building Inspector; having EPA Accreditation #15413 (see Appendix A for certificate). The purpose of the inspection was to identify, sample and assess potentially hazardous friable and non - friable ACM within the residence that may be impacted by renovations activities. II. Structural Design The residence is a wood - framed, two- level, single- family residence. III. Sampling and Analytical Procedures The inspection, assessment and sampling were conducted by an EPA and AHERA accredited Building Inspector qualified by experience, education and training in the recognition of potential ACM and approved bulk- sampling techniques. The asbestos bulk - sampling was conducted on suspect ACM with a limited number of bulk - samples being collected within the residence. The inspection, assessment and sampling were performed in accordance with Environmental Protection Agency / AHERA recommended procedures. These procedures call for the visual inspection of the area of concern and the collection and analysis of representative bulk - samples of suspect material. Some minor destructive sampling was conducted. Walls, columns and perimeter pipe chases were not broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. Random bulk - samples, representative of the suspect asbestos - containing building materials (ACBM) of each homogeneous area (HA), were collected according to the guidelines published as Environmental Protection Agency (EPA) Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763. Representative sampling is based on the following criteria: 1. The distribution of the suspect material throughout the HA. 2. The suspect material's physical characteristics and application. 3. Random sampling patterns determined for each HA. Suspect materials sampled and analyzed should be considered to be representative of materials in each HA if they exhibit similar physical characteristics and the application of the sampled material can be correlated to the application of un- sampled material. Bulk- samples collected were analyzed utilizing the EPA's Method for the Determination of Asbestos in Bulk Building Materials (EPA 600/R/116, July, 1993) and the McCrone Research Institute's The Asbestos Particle Atlas as methods references. Analysis of the bulk - samples was performed on the "date reported," as listed in the bulk - sample analysis report. 3 IV. Notes on Report Format Suspect materials alike in appearance and application were sampled as HAs. Suspect materials were divided into three classifications: 1. Surfacing Material: sprayed or troweled onto structural building member. 2. Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation. 3. Miscellaneous Material: other suspect materials, floor tile, sheet vinyl /linoleum, ceiling tiles, insulation, and finishing materials. Condition assessments were performed by the accredited inspector at the time of inspection. Condition assessments are listed in the following section. Ratings of "good," "damaged," and "significantly damaged" are meant to indicate the overall condition of the material. A material in "good" condition has no visible damage or deterioration, or showing only very limited damage or deterioration. A material in "damaged" condition has the following characteristics: The surface is crumbling, blistered, water - stained, gouged, marred or otherwise abraded over less than one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces beneath the material can be used as confirmatory evidence. A material in "significantly damaged" condition has one or more of the following characteristics: • The surface is crumbling or blistered over at least one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). • One -tenth (one - quarter, if localized) of the material is hanging from the surface, deteriorated, or showing adhesive failure. • Water stains, gouges, or mars are over at least one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces beneath the material can be used as confirmatory evidence. Response- action recommendations for asbestos - containing HAs are listed in the section VII. Recommendations may be for more than one HA, if materials are alike. Recommendations are either "general" or "immediate." An immediate recommendation indicates the presence of asbestos greater than 1% within the bulk - sample, or a bulk- sample in the same HA, and should be addressed accordingly. A general recommendation indicates asbestos does not exist greater than 1% within the bulk- sample, or all bulk- samples in the same HA, and no further abatement activities are required for removal of the material. Any sample reporting a "TRACE" amount of asbestos must be considered to be positive for asbestos greater than 1% unless it is analyzed by the point -count method to be less than 1 %. V. Inspector Comments Asbestos - containing material was identified during the bulk - sampling conducted at 303 Gore Creek Dr, Unit 6B, Vail, Colorado. A total of sixteen (16) bulk - samples were collected of plaster, drywall and resilient floor tile from the upper and lower level of the above - referenced residence. Four (4) bulk - samples tested positive greater than 1% for asbestos. N ■ Asbestos was identified in the main level NE bedroom ceiling plaster (surfacing material) sample PL03 -01 at 4% Chrysotile ■ Asbestos was identified in the main level NE bedroom ceiling plaster (surfacing material) sample PL03 -02 at 5% Chrysotile ■ Asbestos was identified in the main level dining room ceiling plaster (surfacing material) sample PL03 -03 at 5% Chrysotile ■ Asbestos was identified in the lower level laundry room resilient floor tile (miscellaneous material) sample FT01 -01 at 2% Chrysotile VI. Homogeneous Area Descriptions The following section contains sampled HA descriptions and sample locations. Percent - asbestos content for each sample indicated can vary depending on sample locations, homogeneity of the materials, and type of application. The following samples were collected from the single family residence at 303 Gore Creek Dr, Unit 6B, Vail, Colorado, on March 4, 2011. The quantities are approximations and are subject to field verification. ND= Non - detect; CHRY = Chrysotile; TR =Trace ( <1% Visual Estimate). Homogeneous Area #01 Sample #: PL01 -01 Homogeneous Area #01 Sample #: PL01 -02 Sample Description: Plaster Sample Description: Plaster Sample Location: Main Level NW Bedroom Wall Sample Location: Lower Level Laundry Room Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers - Asbestos Content: White granular plaster w /white paint - ND Layers - Asbestos Content: White granular paint - ND White plaster - ND White granular plaster - ND Recommendations: GENERAL - See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #01 Sample #: PL01 -03 Homogeneous Area #02 0 Sample #: PL02 -01 Sample Description: Plaster Sample Description: Plaster Sample Location: Lower Level NW Bedroom Wall Sample Location: Main Level NE Bedroom Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity. <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers - Asbestos Content: White granular plaster - ND White granular plaster - ND Layers - Asbestos Content. White granular plaster - ND Pink granular plaster w /white paint - ND Tan granular plaster - ND Recommendations: GENERAL - See Section VII I Recommendations: GENERAL - See Section VII 5 Homogeneous Area #02 Sample #: PL02 -02 Homogeneous Area #02 Sample #: PL02 -03 Sample Description: Plaster Sample Description: Plaster Sample Location: Main Level N Hallway Wall Sample Location: Main Level NE Bedroom Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers - Asbestos Content: White plaster w /white paint - ND White granular plaster - ND Layers - Asbestos Content: White tape - ND White texture w /white paint - ND White joint compound - ND White tan drywall - ND Recommendations: GENERAL - See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #03 Sample #: PL03 -01 Homogeneous Area #03 Sample #: PL03 -02 Sample Description: Plaster Sample Description: Plaster Sample Location: Main Level NE Bedroom Ceiling Sample Location: Main Level NE Bedroom Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers -Asbestos Content: White micaceous plaster w /white paint - 4% CHRY Layers - Asbestos Content: White micaceous plaster w /white paint - 5% CHRY Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Homogeneous Area #03 Sample #: PL03 -03 Homogeneous Area #04 Sample #: DW01 -01 Sample Description: Plaster Sample Description: Drywall Sample Location: Main Level Dining Room Ceiling Sample Location: Main Level Living Room Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers -Asbestos Content: White micaceous plaster w /white paint - 5% CHRY Layers -Asbestos Content: White texture w /white paint - ND White joint compound - ND White tape - ND White tan drywall - ND Recommendations: IMMEDIATE - See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #04 Sample #: DW01 -02 Homogeneous Area #04 Sample #: DW01 -03 Sample Description: Drywall Sample Description: Drywall Sample Location: Main Level Living Room Wall Sample Location: Main Level Stairwell Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers -Asbestos Content: White tape - ND White texture w /white paint - ND White joint compound - ND White tan drywall - ND Layers - Asbestos Content: White tape - ND White texture w /white paint - ND White joint compound - ND White tan drywall - ND Recommendations: GENERAL - See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #05 Sample #: DW02 -01 Homogeneous Area #05 Sample #: DW02 -02 Sample Description: Drywall Sample Description: Drywall /Plaster Sample Location: Lower Level N Bathroom Wall Sample Location: Lower Level N Bathroom Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: <1,000ft2 Material Quantity: <1,000ft2 Material Condition: Good Material Condition: Good Layers -Asbestos Content: White tape - ND White texture w /white paint - ND White joint compound - ND White tan drywall - ND Layers -Asbestos Content: White granular plaster - ND White granular plaster w /white paint - ND Recommendations: GENERAL - See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #OS Sample #: DW02 -03 Homogeneous Area #06 Sample #: FT01 -01 Sample Description: Drywall /Plaster Sample Description: Resilient Floor Tile Sample Location: Lower Level E Bathroom Wall Sample Location: Lower Level Laundry Room Floor Material Classification: Surfacing Material Material Classification: Miscellaneous Material Material Quantity: <1,000ft2 Material Quantity: Unknown Material Condition: Good Material Condition: Good Layers - Asbestos Content: Tan granular plaster - ND White granular plaster w white paint - ND Layers - Asbestos Content: Black mastic - ND White tan tile - 2% CHRY Recommendations: GENERAL - See Section VII Recommendations: IMMEDIATE - See Section VII VII. Recommendations IMMEDIATE: The laboratory results of the potential ACM sampled at 303 Gore Creek Dr, Unit 613, Vail, Colorado, on March 4, 2011, indicate that the plaster ceiling within the main level NE bedroom and the main level dining room as well as the lower level laundry room resilient floor tile reported as positive for asbestos at 2% to 5% Chrysotile. If the above - referenced ACM is to be removed from the residence and the total quantity exceeds any of the regulatory trigger levels of 50 linear feet on pipes, 32 square feet on other surfaces, or the volume equivalent of a 55- gallon drum, a Colorado - licensed asbestos abatement contractor is required to perform the removal, including formal notification to the Colorado Department of Public Health and Environment prior to the abatement of the ACM. 8 APPENDIX A CERTIFICATION STATE OF COLORADO ASBESTOS CERTIFICATION* Colorado Department of Public Health and Environment Air Pollution Control Division This certifies that Steve Shurtliff Certification No: 15413 has met the requirements of 25-7-5(17, C.R.S. and Air Quality Control Cotnniission Regulation No. 8, Puri B, and is hereby certified by the state of Colorado in the following discipline: Building Inspector* Issued: 6112/2010 Expires on: 6/12/2011 A tikd APCD Rq.- ThA ,'enitka, is -lid _iy A. lh,p_w. 'j. cumnl Phiu.—Pp4 _ig —iflow— M the Akwh y-if"d straw APPENDIX B LABORATORY ANALYSIS 0 Q Q1 •� V7 � N O U 0 0 0 0 U �� o M M ;2i M� 3 oMo 0000,_, . `m a M m a�i a�i 3 Q Q ° a a a U 0 U Q Q Q Q M T 7 M ONE C O O Q c. W vi to c lo. o lop o m Q N O � L,n U O y lu rte+ r. U 0. o a� �< O +r L Z o C U C y Q y A y w O a c 0 O U a y y mo R o Q W H � L CO c U C 0o en U ' v c o s 7E U' s o U� k >M o ~° �Z QvMi�ci:° r°i no. G� oil Lp z N IL b U L R 7 '� a0i a0i T c a+ O x cO Y . a a a a ° a a a U 0 U 3 U o a� y A y U O 0. z mo R c U N 0. N v v Q ^ ^ ^ ^ ^ _ C C C lu p Q U c0 e � R aCi O C O O O C C O O 00. O 7 ° E a, z z z z z z z z z z o� r to 3 ca Cd m LI 3 Y L L L C z v C7 U U L cz 3 3 3 � 3 3 L 0. a N z ° o 0 0 0 0 0 0 0 0 N N M en en R w c a N M — N 4. y U ^O _7�a II II d A L N aiC7 p II zZ IdUll�� 11 II U� Fes- Q z ULU O y y y u l l¢ r I l n u z <U C� o ¢U � F- �z O r G d V� R = is O R ..] o N Q J i R T \ G C G¢ R G z, kA 0��0 � M • � 7 Q M ° U N O o � C M N z Q i� CQ O Q w O CQ V L 6> EF Ci:z n (` oC O M N O O O O M M M M O^ 0000 _, u 22 y y y V R � R 0 �^ o 00 0 o o U � C z FO c � r✓ o U C U U 'o .k U O O y M n' =r° d e W z a `r e v a0i rT c ?+ en a, ti N� C 0 0 0. W R v G CD _ G] CQ _ O ¢ O _ 0 R G p w O s n. R _ 0 V �a c p � T Y o �+ U c � r � Q N N � rry 0. N c � v o z s C O U � O O � � O O kn O R V oc 01 C', 01 a z o� y R V A °° N ¢� ° ^ o �- z OD R r U N 0 L ¢ 9 r U o z z z z z z z v s ¢ ..R7 cc G z z z z z z O � T a a a .C3 .� 3 Z ss cl .D ° iO•. � O ° � � � �v�i ry�i, •� cc 3 3 3 = = = T y y y 0. Z i 1 3 3 3 c� d at U p 00 ON O O O O O O O C� a y N N N N N N en N en N en O O ti N M N M y N N M M M Q G G G G G t+ cNc r V G C � II II ICI, awp U aF- ¢ y d � L a`aC7 II II zz IdUII�F II II U� ¢ z •y Os ti� Ot EtsvII o�N� ¢¢ e UF" u o U 11 az ¢u" �z O O N �T C C- 9 �• O � R J N 0 C 1 T V R_ 0. R ¢ i � V R O R v w 0 0 a C y U G U M75 3 g ° c a3i � M N WQ N V Z 4 N Q Q 4- O Q CC u L. L 6> Lo N 0 0 0 0 0 lu lu 0 � t N T U C G N U Q o y y d y 0. 0 dal N O LJ � a z c 7 UoCO� y A L v U Ic t v U M V: m ei to z a y ` N •°' v z R � y y T C Y d C R Y m C y y L Q N C C M �b � O � t 2 0 :: c CL Ci U U C7 U U C7 o U 7 N O � R �? y R U N oc N O O N O O z 0 O U tw R 00 a 0 a, 00 ^ c a z to R r U n. O N d .U+ N o lu z z z z z z z z z z lu d c0 T= o o 0 0 k 0 0 o O o 0. o= ° z z z z z z z z z z N T R C C G _ cC G q C ca b ,--. 3 CL v Q CL Q cl 3 U 3 U Q c _ c � Y _ c �" 3 3 , L 0. a U U U Q EO O ,-. ,� .- •-- Z O Q, C\ G\ CN .N. C1 O O O O O O O O O O M cq M R M O M O M O Cl M O M C M O en O M O C C C/] C O C C O O C C O O N G N M R O C O un U C Q 0 c� v � E 0 II �� am C] U �d ti p N y � zz U IaUV�F�U z r N o II U:� TO• � C U ocG�'a °ray E 5 ddc11UF"�o u li d�. it II az dd¢UU�RQ F- O ti it { G U V] C R C R O �v R� ti � c v J _T G. R G C R QO G � V� v 10 v N N C M 0 M Q [NCn • X N M `y O p°p M V1 U N �z n iz� 00 M O O O O O U � O 3 OM 0000_ v � a� � A d d d d .� O U y U A G N O 7 U ooQo a, U O M M� C O O z v? ¢ o 0. vi ro A 00 00 C 'O 3� Y Q .0 z O N l +• L Z o � R U U 0. � N Q t 402 N .d O t d a U c rA .o o o z z z � y z z z _ A c� T N�, f O ^^ Y h W r ¢ M o_ V Gw OD M ill 4 z off} UN Q z z z z z z z z z z X R C O U 7 U U O O � U z o A 00 o a z l U U 0. N O N d U o z z z z z z z z z ¢ OD M a off} z z z z z z z z z z c c T as y �+ y c0 .b L 3 In O CL ca 3 C U C y L m C oj ° m cn `° Cd Y L F L Q 'LU z 0 0 0 y o 0 0 0 0 0 0 M M M M M M M M M M O O C O O O O O O O c a O C O C O C O O C O R U � � t:. G U 9 L N M v y N N N CD 7S e _ = O II II I�j" F¢ Oil azz C'Il ��FC16U U F¢ z aU+ � � U y •--• U .. Ot O O• R U O E ULL O y� ¢¢c� o F O a v � R � c 1' v O c V U v J _T c� a° O R � O A v N O cc Ij M O 0 O a 0 3 A 0 N 3 R U 3 0 7 o o v Q `on C; o c h U N o U ° o � Y .a "R C d R v 1` C Q r 401 go >.z 4u r r Og �0 � y< A �n co i 00000 0000� a 0 0 0 Um r94 0. p Q Q Q V Q Q m �o V U `o v 0 M u a 0 z v 0 w y =ta. ��t >v n�•- 0s m In 'n Q 0 z u O .0 a 0 L E �o r U a 3 0 y U �v c c z 0 a c ° ` .= o C U •}, O 1" y' c to cc on t00 w 7i y a y a 1=0 3 a y y z v lQ d p ip O 0O A Rf y a y O> 4 w£ r N¢ .0 •pp C a€ O ♦ E a ♦ ri ♦ o ♦ .c ♦ w a Q z a c z y U R a [i C U c T C O V? z G z T C U aci `c > C � C. C co m C y � a > U � d C U p. b o re z C6 c m U I- a O O d U a r o � c U U a � y � T � O O O > V r o � o � � N L M N O M O 0 Y a N Gn d 4A .. U c ayi Y T T 3 Q y o f � 3 a a N N �•c 3 ` t t C r s d d o •= y y °L' E E 3 3 d c L L r ry St e`i 'C t t a0i O O y y F F v Sy� O d CO ' O C G w C � 5 C •y ' 'O L _ r � 5 _� r OD C C y v v N w O O y rg u u r O N N : :fl . vi • •.�. •� c y .G v y O a y _� L L L.. � � N N a y y U d •0 � w y y L A o � A O •� y y E t 0 y Z � y • �• L t 0 � Z y 4. y U U U y L s•0 0 0 ; ; o cd o� w s a a . ,°�� E E a C y y x 0 0 c t t• U 1 o y y y L L O U U O O U � O O � O W T T� O O. • �w•+ O z ,a 7 � L L a a R O O y > > O N N O O O d d to O O •� r U s O s N a Q z a c z y U R a [i C U c T C O V? z G z T C U aci `c > C � C. C co m C y � a > U � d C U p. b o re z C6 c m U I- a O O d U a r o � c U U a � y � T � O O O > V r o � o � � N L M N O M O 0 Y a N Gn d 4A .. U PRSU -oiRti 12 -11 -2014 Inspection Request Reporting Page 1 4:47 pm Vail, CO*- City Of Requested Inspect Date: Friday December 12 2014 Site Address: 303 GORE CREEK A VAIL VAIL ROWHOUSE UNIT 6A A/P /D Information Activity: B11 -0166 Type: COMBO Sub Type: AMF Status: ISSUED Cons' Type: Occupancy: Use: R -2 Insp Area: Owner: CREEKVIEW PROPERTY LLC Applicant: NEDBO CONSTRUCTION INC Phone: 970 - 845 -1001 Contractor: NEDBO CONSTRUCTION INC Phone: 970 - 845 -1001 Description: REPLACE ALL INTERIOR FINISHES (CASE, BASE, DOORS, FLOORS). INSTALL NEW KITCHEN AND REMODEL BATHROOMS. Comment: SCANNED APPLICATION AND ASBESTOS TEST REPORT (POSITIVE). ROUTED TO BIN A -1 AND FIRE (ALL INTERIOR WORK ONLY- DRHOADES Comment: NEED FINAL AIR CLEARANCE PRIOR TO ISSUANCE. - DRHOADES Comment: Martin has for review - MHAEBERLE Comment: RECEIVED A DEFERRED SUBMITTAL REGARDING THE CONCRETE FOUNDATION SPECIAL INSPECTIONS, OBSERVATION REPORTS, TESTING RESULTS BY GROUND ENGINEERING Comment: Comment: SPECIAL BILL UIOJVIV HIVIJ riff C. CIVIHILCIJ LCVIVHrIIJ IIV MdUIC %011CVr\ rlJn HIV T rVV 10JVC0. - LV1'%1VIrDCLL Comment: Returned plans to A -1 awaiting fire review - MHAEBERLE Notice: This parcel is immediately adjacent to Town -owned stream tract lands. Please confirm that no improvements or activities resulting in trespass, or other code violations, are present on the adjacent Town -owned stream tract prior to the acceptance of an application for review. A permit or approval shall not be granted until the code vinlatinn is rocnkt I - I TAMP I I Requested Inspection(s) Item: 542 PLAN -FINAL qw— ��6 Requested Time: 08:00 AM Requestor: `"'�, �� �� Phone: Assigned To: WCAMPBELL Entered By: CGODFREY K Action: Time Exp: Inspection History Item: 420 Special Inspect -final rept Approved " 07/05/12 Ins eetor: J 3W Action: AP APPROVED Comment: SPECIAL INSPECTION PACKET RECD SCANNED AND APPROVED Item: 10 BLDG - FOOTING *` Approved " 10/26/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: rear footing 11/16/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: column in NW corner wall Sw ok pwer Si report 11/23/11 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: EAST/ WEST ENDS ALONG NORTH SIDE 12/01/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: rear east and west walls ok per si report 12/02/11 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: FOOTER ON SOUTH WEST CORNER ONLY 12/08/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Detail #4 on s4 footing Detail #13 on s5 wall 12/21/11 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: FRONT (SOUTH WEST) FOOTER ONLY 12/23/11 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: MID SPAN EAST WALL AREA FOOTER APPROVED 01/19/12 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: footer GRID LINE B and side walls on each end of grid line B Comment: grInspector: d f to6 C of re mefooting Action: PI PARTIAL INSPECTION grid line B at 1 to 1.25 - wall 02/06/12 Inspector: sgremmer Af.tion: PI PARTIAL INSPECTION Comment: C line footing 02/08/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: line #2 from Co C.5 line #1 from B to C ok per special inspection report on dowels 05/31/12 Inspector: sgremmer Action: AP APPROVED Comment: mech room footing REPT131 Run Id: 14892