Loading...
HomeMy WebLinkAboutDRB110223city Development,. 75 South Vail Application for Design Revie a Minor Exterior Alteration Il JUN $ 2011 General Information: This application is required for all proposals involving min chT t irWAJU siW m- provements, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information - Town Code Online. All projects re- quiring design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Plan- ning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Fee: o for Multi - Family /Commercial $2 or Single Family /Duplex Single Family ✓ Duplex Multi - Family Commercial Description of the Request: Szk } f A N]p A- <_SU4,� 1 V.. 6f..A 1 _ _ Physical Address: LA 0 1 v l u ce I_pcA^x V ate.\ C 0 <% b �� Parcel Number: 240 I % Z, Z 0 0 I 1 (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.) Property Owner: SS"— Qa tis- Mailing Address: Phone: r fi � 0 - 47 ` — & 41 Owner's Signature: Primary Contact/ Owner Representative: P-yc Z - C OY1 Vr. Ae", Td ^_"o Mailing Address: 0_f�lb 31 J Phone: 4 110 - `t1( - E- Mail: 1 � Oa/t2 Co�►ur+�ra,�.. �1� Fax: � � a � % to Z3-�g i—�— For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Exp. Date: Auth # Check # J40 - 1 o Fee Paid: S z v.o0 Received From: 0A>t& )C)RAkW% T�ceaNO I6S Meeting Date: DRB No.: UzR l I fla a 3 Planner: FT Project No: RR111- oa "77 Zoning Land Use: Location of the Proposal: Lot: Block Subdivision: _ R 16 Ht)Qg .SI 601VJS1L Abi�.3 O1- Jan -11 Jun 2011 01;52p susan 9704799578 p.2 TM, Pl� ` ' JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER The applicant must submit written joint property owner approval for applications affecting shared ownership properties such as duplex, condominium, and multi- tenant buildings. This form, or similar written correspondence, must be com- pleted by the adjoining duplex unit owner or the authorized agent of the Vome owner's association in the case of a con- dominium or multi - tenant building. All completed forms must be submitted with the applicants completed application. I, (print name) _�Y] �- T r' J I Y� �fV lr S 1.12 , a joint owner, or authority of the association, of property located at 1 7 3 IS S PROCC tWAl? provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address not- ed above. I understand that the proposed improvements include: (Signature) (Date) Additionally, please check the statement below which is most applicable bo you: I understand that minor modifcations may be made to the plans over the course of the review process to ensure com- pliance with the Town `s applicable codes and regulations. (Init,61 ere) , . <�C _ I understand that all modifications, minor or otherwise, which are made to the plans over the course of the review pro- ds, be brought to my attenb'on by the applicant for additional approval before undergoing further review by the Town. (Initial here) Jun 2011 01:52p susan FAX TO: �irl.A 9704799578 p.1 Date /iAO Number of pages including cover sheet FROM: Susan Pollack. 4173A Spruce Way Tail, CO 81657 -4706 Phone (970) 476 -68;45 Fax Phone (970) 4 79 -9578 CC.• `REMARKS. ❑ Urgent ❑ For your review ❑ RepIyASAP G�� s ❑ Please Comment GR.®au,o f ApQ &" Jun 10 11 09:21 p susan 9704799578 p.1 Pre - application for Photovoltaic CPV)_Installation (Revlsec arch Eftec ve February ;7, 2010) Submit tc Hcly Cross Energy via fax at ;970) 9 -5455 or electronically to c*at -_ roivcross.r thank you. Eligibility Criteria To be eligible for the WE CARE Program "Reneviabie Energy Generation" iricenove offered by Holy Coss Energy ( -iCE the completed application must Le receivk after execution of the contras (berween HCE Consume- of Record and Designer /installer) and in advance of the required "On- Site" inspection conducted by HCE personnel. Terms and conditions of the WE CARE Program, as may be amended from tame to time, shall govern and supersede this pre- apphcatior.. ?::Boots that rertilre. Compliar:ce %v,-b either REMP or _mil !;{,Its '^aRG:jt+r.', ~l n" i `? c.lii� : fl !C t o Q.'it?,'G'Y Q 2 nArilOn ;nf s?ritlt'P ; however, non- a :iglbil'ty for the ncendve does not relieve ,he HCE Consumer of Record of the obligaton to sub ch mit su pre - application ;'or the express purpose cf r�:itifyinc HCE that a PV system is being instabec within its service territory. That portion of a P%/ system ins`Lailed in excess of REMP or CO -SUIID obligations s eligible for incentives. A 525E -efundabie "Reservation Fee" {check payable to Hoy Cross Energy — Me,oer Services) shall accompany this Pre- Application. This fee voltl be refunded 'when the incentive check is disbursed) prcvlded that all five provisions listed below have been fulfilled within the estao'ished dead ine. If the five previsions are nct satisfied by such ceadline, the $250 fee w- fl be forfeited. in addition, this pre - appkcabort will be moved to the end of the list cf applicants eligible for :rcentive `ands which may 7ecpard¢e the appl:cant`s ability to -eca�ve an incentive if available funds have teen exhausted. Deadline for Required Approvals and Operation of System Please note that in order .o be eligible for a renewable energy generation incentive under the VIE CARE Program, the following Five provisions must be completed to the satisfaction of HCE within one hundred twenty (120) days of the date this Pre- Appiication is received by HCE: This Pre - Application must be signed and dated by the HCE Consumer of Record. 2. Designer installer must be NASCEP (Norm American Board of Certified Energy Practitioners) accredited. For electrical contractors, licensed ir. the State of Colorado, the system must be inspected and approved by a NABCEP accredited company prior to the "On- Site" inspection conducted by authorized HCE personnel. 3. The $250 reservation fee must be received by HCE. 4. The PV system must be iristalied, inspected and approved by HCE, and operational. 5. All required Interconnection Agreements, Government Inspections, Insurance Certificates, VVE CARE Programs consumer application, and otk.er aocumentadon (as may be required) must t'e received and approved by HCE. General Disclosure All enewable energy generatioc incent.ves offered by HCE are subject to availability of funds and such funding is limited, Fully executed Pre- Application forms wvi be accepted on a first come, first serve basis while finds are available. This mcentive is subject to modification and termination at any time without prior notice. HCE Consumer of Record Information Name: Installation Address: k-1k -r., cc Lti l o b 5 Contact Information: ���_ y��, (�`s-lE (Home Phone) (Work Phone) E -mail Address: S. ot'.r k �� Co C'a�f �fi Fax: F. icy - 4 - 7 L0 -�� 7� Designer/ Installer: Company: I�r I Address_ City, Stare, Zip, & Phone: u,; � ( e (-]) , (� 7C) '? ?L - ?- "S / Pa 0 e I of 2 Jun 10 11 09:21 p susan Pre- for Photovoltaic PV Installation Continued Photovoltaic System: a. Size (DC nameplate rating in kW) Li . g b. PV Module Manufacturer C. Number of Modules Z I d. Size of Module (DC watts) e. Mounting Type Metering Environment: Single Meter Master Meter w /Consumer Sub- meters Estimated Annual Production of PV System: X30`1 tu-) per kW Estimated Date for "Full -Time" Operation of PV System: _ 4�1<,•S z 20 ( 4 ECO- BUILD or REMP Mandate? No Yes Renewable Energy Credit (REC) Ownership Option: 1 r (1/we) want HCE to retain all rights, title and interest and REC Reporting Rights. (Ilwe) do not want ICE to retain all rights, title and interest and REC Reporting Rights and, as such, the incentive payment for $0.50 /watt will not be disbursed. E :O -BUILD or REMP Excess Ca aci ? No Yes 9704799578 p.2 f. Inverter Manufacturer g. Inverter Model Number h. Number of Inverters ; NC Disconnect .a rt :k isihle are lOckade. 5q1W7r 0. HQ rlcw duty or egwv&�mt) Y.r wing il eno r ; r. >� ���r• ,.. -t- a. p a u1?J'�r.S .�w. • - .r L'. �7L:r:., 53: i72; ; >i`rr. 17i /;': ?- L. fDrr7, J /or) m° as thE HcA Cro.:Z, Fr? gv Con:- a,T1er ?f Pec' i e do acl no! vj�'�'oo 6d 3q"e tic Cf the terms and CG/70ivo:v r/-5T sat foIth 310vc. By: 02 Date: e By: Date: Hofy Cross Erw9y Use ONy: Service Location Account Number Billing C cle Meter Number Meter Reading Bock self -read Turtfe Route Consumption history WO# Type (Prior r 12 month's arera usage; Date received Modules x Size = S Estimat d $ incentive Comments Budget T-ack Date G[F Agreement Received? N3o Yes ECO- BUILDfREMP Documertabo Rcv d? No Yes S250 Fee Received? No Yes 'vASCEP Certified? No Yes RECs Retained by? Consumer HCE Page 2 of 2 M'1040kbWembel smta• F fA�rk�tm)�Pt�(ryi,aLa[; P:'e Appr.&.KW1NPre -AprA tort o!17.:0) aevrwv 7 .rloe� Y rk S . f P, J d I , � Suniva OptimusTM Monocrystalline Solar Modules Engineering Excellence The OptimusT"I modules consist of Suniva's highest- efficiency cells: ARTisun" Select. These superior monocrystalline cells are designed and manufactured in the U.S. using our proprietary low -cost processing techniques. Engineered with industry- leading technology, high power - density Optimus modules provide excellent value, performance and reliability. • Built exclusively with Suniva's highest- efficiency ARTisunp Select cells, providing one of the highest power outputs per square meter at an affordable cost. Suniva" is a global leader in the high- efficiency. low -cost solar products market, with deep roots in PV technology and more than 20 years of proprietary cell research and design. • Our state -of- the -art manufacturing facilities feature the most advanced equipment and technology. • Suniva` is a U.S. -based company spun out from the Georgia Tech University Center of Excellence in Photovoltaics (one of only two such research centers in the U.S.). • The rated output of the OptimusT"' module is ideally suited for standalone as well as grid -tied systems. Quality & Reliability * 0 ® FSEC• UL 1703 61215 CEC 61730 Lf�rr�� rasp Ao Suniva`F OptimusTM modules are manufactured and warranted to our specifications, assuring consistently high quality and performance. • Adheres to rigorous quality management • Requires mechanical and electrical tests and visual inspections on each module • Protects performance longevity with low -iron tempered glass, EVA encapsulant and advanced polymer backsheet Features • Delivers panel efficiency conversion of up to 16.0% • Offers one of the tightest power tolerances in the industry • Provides industry- leading 25 -year warranty (5 years w/ 100% warranty on workmanship & materials: 12 years @ 900% rated performance; 25 years @ 80% rated performance) • Highly- durable frames meet increased IEC load requirements • Contains 80 ° U.S. content and is fully "Buy America" compliant 5765 Peachtree Industrial Blvd., Norcross, GA 30092 +1 404 477 2700, +1 404 477 2709 (fax) www.suniva.com OPT260- 60 -4 -1 f IWF Suniva° OptimusT"" Monocrystalline Solar Modules Current - Voltage (IV) as a Function of Insolation (W /m and Temperature 10.0 9.0 8.0 7.0 Q 6.0 5.0 t U 4.0 3.0 2.0 to OA 0.0 ELECTRICAL DATA (NOMINAL) The electrical data apply to standard test conditions (STC.): Irradiance of 1000 W%m' with AM 1.5 spectra at 25'C. 4.80 Drain t l�" Hdes4 6.60 1000 Mounting Holes-4 4.20 Grounding Holes-2 Tolerances , 1 mm Hole Tolerances Vary Dimensions in mm Power Classification Max. Pmax 240 1 245 250 255 260 Voltage at Max. Power Point Vmp (V) 30.00 30.10 30.60 31.10 31.40 Current at Max. Power Point Imp A) 8.00 8.12 8.16 8.21 8.28 Open Circuit Voltage Short Circuit Current Voc (V) Isc A 37.20 8.52 37.40 8.70 37.90 8.69 38.00 8.71 38.20 8.79 Tr,e rated powe! may vary by :2% Wp and all other electrical parameters by f 5 DIMENSIONS AND WEIGHTS Cells if Module 60 Module Dimensions 1653 x 982 mm; 65.08 x 38.66 in. Module Thickness (Depth) 46 mm; 1.81 in. Approximate Weight 18.69 kq; 41.22 lbs. CHARACTERISTIC DATA Type of Solar Cell High - efficiency Suniva$ ARTisuna Select monocrystalline ells of 156 x 156 mm Frame Silver anodized aluminum alloy Glass Anti - reflective coating, tempered and low -iron Junction Box . IP65 rated: IE & UL listed; with internal bypass di odes Cable & Connectors 14 rnm cable with Tyco connectors; cable length approximately 1 m TEMPERATURE COEFFICIENTS j Voltage a, v oc ( %/ °C) - f -- -0.332 Current a, Isc ( % / °C) +0.036 Power y, Pmax ( */./ °C) I -0.460 LIMITS Max. System Voltage 1000 VDC for IEC (600 VDC for UL) Operating Modul Temperature -40'C to +90'C Storm Resistance/Static Load Tested to IEC 61215 for loads up to 5400 Pa Suniva' reserves the right to change the data at any time. * Some certifications may be pending. *4I"a Suniva Please recycle. --r4 60 10.0 15.0 20.0 25 -0 30.0 35.0 40.0 Voltage (V) -1000 WIm @ 25 °C -800 Wlm - 800 W /m' -400 WIm -200 WIm 1000 w im 2 @ 50 °C conundrum technologies& Department of Community Development 75 South Frontage Road Vail, CO 81657 To: Design Review Board Re: Pollack Solar PV Residence: Pollack Residence 4173 A Spruce Way. Vail, CO 81657 System: Ground Mounted(at 38 degree pitch) Solar PV System Narrative: Susan Pollack is requesting to install a Solar PV ground mounted system in her backyard toward the north property adjacent to 1 -70 in East Vail. The system will be on the north side of the building between the residence and 1 -70. The system will be approximately 6' off of the ground at the highest point. The panels will be black Monocrystalline to lesson the visual impact of blue colored panels and to blend into ground coloring. The intent is to offset the Pollack's overall electrical energy consumption and to contribute to lessoning global warming locally. Vail, Colorado Division 210 Edwards Village Blvd Suite B202 Edwards. Colorado 81632 PO Box 966 Edwards, CO 81620 p 970.926.2554 f 928.396.2329 Corporate Headquarters The leader in smart -home integration- PO Box 862 Denver. Colorado 80201 p 800.741.8639 f 866.308.9290 www.conundrumtechnologies.com "tr r o g llul,t ON' IN 14---- . I \ - 23 3 1'16 14 27,/ C, 8 c�- J 000� 6�mmmw Rachel Friede Dimond From:Jason Perez <JSPEREZ@CONUNDRUMTECHNOLOGIES.COM> Sent:Tuesday, July 05, 2011 4:57 PM To:Rachel Friede Dimond Subject:Pollack Solar PV Installation Attachments:unknown.jpg; Top_View.jpg; Side_View_Dimensions.jpg; Side_View_2_Dimensions.jpg Rachel, I have attached the Pollack array that is showing 282.16 sf. We raised the angle to 38 degrees from 30 to lesson the sf. Thanks and look forward to seeing you tomorrow. 1 2 3 Jason S. Perez || chief executive officer Conundrum Technologies 210 Edwards Village Blvd. || Suite B-202 || Edwards, CO 81632 PO Box 966 || Edwards, CO 81632 970.926.2554 phone 866.308.9290 fax jsperez@conundrumtechnologies.com www.conundrumtechnologies.com 4 Design Review Board 1::‘: ACTION FORM I - Department of Community Development TOWN OF VAIL i 75 Sough Frontage Road, Vail, Colorado 81657 tel: 979.479.2139 fax: 970.479.2452 ,iMUlI11-'i CeyEL OPMENT Web: w v.va I I g o i.c a m Project Name: DRB Number: DRB110223 Project Description: ADD SOLAR PV TO GROUND MOUNT SYSTEM IN BACKYARD. Participants: OWNER POLLACK, SUSAN G. &ALBERT H 06/23/2011 4173-A SPRUCE WY VAIL CO 81657 APPLICANT CONUNDRUM TECHNOLOGIES 06/23/2011 Phone: 970-926-2554 PO BOX 602 EDWARDS CO 81632 License: 969-S CONTRACTOR CONUNDRUM TECHNOLOGIES 06/23/2011 Phone: 970-926-2554 PO BOX 602 EDWARDS CO 81632 License: 969-S Project Address: 4173 SPRUCE WAY VAIL Location: A SIDE OF DUPLEX Legal Description: Lot: 11A Block: 9 Subdivision: BIGHORN 3RD ADDITION Parcel Number: 2101-122-0701-9 Comments: SEE CONDITIONS BOARD/STAFF ACTION Motion By: Gillette Action: APPROVED Second By: Maio Vote: 4-1-0 (DuBois opposed) Date of Approval: 07/27/2011 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0012043 The applicant shall shift the solar panels down slope from the proposed location resulting in the uphill portion of the panels being located where the stakes were placed on site identifying the downhill terminus of the proposed panel location. 2)The applicant shall screen the substructure of the panels by placing an evergreen plant species on the east and west sides. The proposed plant material does not need to be a species which exceeds the height of the underside of the panels. The proposed plant species, quantity and size shall be included in the plans submitted for review in conjunction with the building permit. Planner: DRB Fee Paid: $20.00