Loading...
HomeMy WebLinkAboutB11-0192NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES t no OF VAS,' Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11 -0192 Project #: Job Address: 2570 BALD MOUNTAIN RD VAIL Location......: EAST UNIT Parcel No....: 210103403009 OWNER JOHNSON, DOUGLAS G. - BRENT, 06/28/2011 2570 BALD MOUNTAIN RD VAIL CO 81657 CONTRACTOR DOUG JOHNSON 06/28/2011 Phone: 970 - 376 -3203 2750 BALD MOUNTAIN ROAD VAIL CO 81657 License: C000003110 APPLICANT JOHNSON, DOUGLAS G. - BRENT, 06/28/2011 2570 BALD MOUNTAIN RD VAIL CO 81657 Description: REMOVE EXISTING ASPHALT DRIVE AND REPLACE WITH SNOW MELT SYSTEM WITH BRICK PAVER TOP SURFACE. NEW BOILER TO HEAT CIRCULATING FLUID INSTALLED IN WEST 112 GARAGE IN THE NORTHWEST CORNER. ADDITIONAL ELECTRIC METER AND GAS METER TO BE INSTALLED. Occupancy: Type Construction: Applied.....: Issued... P RJ 11 -0257 06/28/2011 07/28/2011 Valuation: $80,500.00 ........................ .......«........... ..................,..........., FEE SUMMARY .,.,,,...............,............,,......... ........,...............,,,,.., Building Permit ------ - - - - -> $860.75 Bldg Plan Check ----- - - - - -> $559.49 Use Tax Fee------------------ - - - - -> $1,410.00 Electrical Permit ---- - - - - -> $115.00 Elec Plan Check ------ - - - - -> $74.75 Restuarant Plan Review--- - - - - -> $0.00 Mechanical Permit - - - - - -> $1,000.00 Mech Plan Check ---- - - - - -> $250.00 Additional Fees--------------- - - - - -> $0.00 Plumbing Permit --- - - - - -> $0.00 Plmb Plan Check ---- - - - - -> $0.00 Recreation Fee--------------- - - - - -> $0.00 Investigation------------------ - - - - -> $0.00 Will Call ------------------------------ > $15.00 TOTAL PERMIT FEES -- ----------- > $4,284.99 Payments -- ---------------------------- > $4,284.99 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. 1 agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTSFORINS 8:00 AM - 4 Q PM. - of SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM or Contractor f D ate t Name combination permit_012811 CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B11 -0192 Address: 2570 BALD MOUNTAIN RD VAIL Owner: JOHNSON, DOUGLAS G. - BRENT, ALISON ST.GERMAINE Location: EAST UNIT Cond: CON0011996 Prior to final inspection, the applicant shall paint the exterior portions of all boiler vents, flues, louvers, etc. to match the adjacent wall of the garage. The applicant shall also paint the new utility meters and associated conduit to match the adjacent exterior walls of the building. combination permit_012811 TOWN OVAL REQUIRED INSPECTIONS AND STATUSES Permit #: B11 -0192 Address: 2570 BALD MOUNTAIN RD VAIL Owner: JOHNSON, DOUGLAS G. - BRENT, ALISON ST.GERMAINE Location: EAST UNIT Item: 00110 ELEC - Service Item: 00200 MECH -Rough Item: 00310 MECH- Heating Item: 00240 PLMB -Gas Piping Item: 00290 PLMB -Final Item: 00390 MECH -Final Item: 00190 ELEC -Final Item: 00534 PLAN - FINAL C/O Item: 00090 BLDG -Final combination permit_012811 TOWN OF VAIL, COLORADO Statement Statement Number: R110000867 Amount: $3,705.03 07/28/201109:54 AM Payment Method:Credit Crd Init: LC Notation: CREDIT CARD FROM DOUGLAS GUY JOHNSON ----------------------------------------------------------------------------- Permit No: Bll -0192 Type: COMBINATION BLDG PERMIT Parcel No: 2101 - 034 - 0300 -9 Site Address: 2570 BALD MOUNTAIN RD VAIL Location: EAST UNIT Total Fees: $4,284.99 This Payment: $3,705.03 Total ALL Pmts: $4,284.99 Balance: $0.00 ACCOUNT ITEM LIST: Account Code ----------------- BP 00100003111100 EP 00100003111100 MP 00100003111100 PF 00100003112300 UT 11000003106000 WC 00100003112800 Description Current Pmts ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 860.75 ELECTRICAL PERMIT FEES 115.00 MECHANICAL PERMIT FEES 1,000.00 PLAN CHECK FEES 304.28 USE TAX 4% 1,410.00 WILL CALL INSPECTION FEE 15.00 Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: (ill -v t9 Z Project Street Address: Attention: ( ) Revisions 44iMsponse to Correction Letter _attached copy of correction letter () Deferred Submittal () Other (Number) (Street) (Suite #) Building /Complex Name: Contact Information: Company: Company Address: City: State: Zip: Contact Name: ��— Contact Phone: c l - E -Mail Valuations (Labor & Material)) Building: $ Plumbing: $ Electrical: $ Mechanical: $ Total: $ Description / List of Changes: (use additional sheet if necessary) Date Received: �CIE5WE D JUL 14 2 011 TOWN OF VAIL 1- Sep -09 TRANSMITTAL FORM 2570 Bald Mountain Rd. Vail, Co 81657 Town of Vail 75 S. Frontage Rd. Vail, CO 81657 Community Development Department Mr. Martin Haeberle Please call with any questions. Thack you, ( W Doug Johnson 970 - 376 -3203 sponse comments to letter dated 7/8/11 Mr. Haeberle: Architectural Comments: 1.) Gas and electric meters are enclosed in separate closets protected from snow and rain. 2.) See attached letter of approval from Ed Williams, owner of west half. Plumbing Comments: 1.) Existing garage floor slopes to exterior with no drain, per C&C conversation with you 7/14/11. 2.) Gas piping from meter to boiler to be 2" supply, approx. 110' in length. Boiler to be 600000 btu's. 3.) Safety traffic bollard to be installed once piping and boiler are installed to determine best placement for protection from vehicles pulling into garage. 4.) Boiler to be high efficiency 600000 btu with thermal efficiency of 94.6 %. 5.) The meter will be tagged —'Snow Melt Boiler'. 6.) Heated drive system to replace existing drive and common parking area, as outlined on plans. Concrete band (2' wide) to be installed as separator between end of drive and edge of Bald Mtn Rd. Verbal approval given by Chad (of Public Works) and Bill Gibson during meeting June 24, 2011. Last 5' of wirsbo piping before concrete band to be on separate zone. Electrical Comments: Electrical requirements will be completed by adding 2 branch circuits to supply the boiler. 1.) No longer an issue based on above statement. 2.) No longer an issue based on above statement. 3.) No longer an issue based on above statement. A4W s elf's W� ilk A July 14, 2011 JUL 14 2011 TOWN OF VAIL 6,1 a,,e, beW1 S 1� Vh AVId "4e,� `nat � fv 2570 Bald Mountain Road Vail, CO 81657 Martin A. Haeberle Town of Vail Community Development 75 South Frontage Road West Vail, CO 81657 Re: B 11 -0192 Dear Mr. Haeberle: Please accept this as approval and authorization to install the boiler and connections in the west garage of 2570 Bald Mountain Road. As owner of the west unit at this address, I am in agreement with the proposed construction and installation of the heated driveway and equipment. If you have any questions or need additional information please feel free to contact me at 303 -866 -0800. Sincerely, Ed Williams Department of Community Development 75 South Frontage Road Alu ' Vail, Colorado 81657 Tel: 970 - 479 -2128 Web: www.vailgov.com Development Review Coordinator v BUILDING PERMIT APPLICATION S t a lications are required for alarm & sprinkler) ( epara a pp Project Street Address: 2570 Bald Mountain Rd (Number) (Street) (Suite #) Building /Complex Name: Contractor Information Business Name: Doug Johnson Project #: 1"pS 1"Oa�J'�1 DRB #: 110209 Building Permit #: Lot #: 33 Block # 2 Subdivision: V V 13 Work Class: New ( ) Addition ( ) Alteration ( V ) Business Address: 2570 Bald Mtn Rd City Vail State: CO Zip: 81657 Contact Name: Doug Johnson Contact Phone: 970- 376 -3203 Contact E -Mail: Johnsonvail @gmail.com Contractor Registration Number: exp. 4/30/14 Owner /Owner's Representative Signature (Required) Ca; l`� VVIS " `A Project Information Owner Name: U Johnson &A. brent t. Williams, 7. Lynels Parcel #: 210103403009 (For Parcel #, contact Eagle County Assessors Office at (970 - 328 -8640 or visit www.eaglecounty.us/patie) Type of Building: Single - Family ( ) Duplex (✓) Multi - Family ( ) Commercial( ) Other( ) Work Type: Interior ( ) Exterior ( ) Both (V) Valuation of Work Included Plans Included Work Electrical (,/)Yes ( )No ( )Yes ( )No 500.00 Mechanical (V )Yes ( )No ( )Yes ( )No 50000.00 Plumbing (,/)Yes ( )No ( )Yes ( )No Building (,/)Yes ( )No ( )Yes ( )No 30000.00 Value of all work being performed: $ 854_9"TS0 i j00 (value based on IBC Section 109.3 & IRC Section 108.3) Electrical Square Footage Detailed Scope and Location of Work: Remove existing drive surface and replace with heated drive system topped with paver stones. New n.g. boiler to heat circulating fluid installed in West 1/2 garage NW corner. Additional electric meter and gas meter to be i nstalled. (use additional sheet if necessary) For Office Use Only: Fee Paid: $S Received From: Cash Check # CC: Visa / MC Last 4 CC # exp date: Auth # Date Received: ,2Q bf— JUN ffi 2011 TOWN OF VAIL 01- Jan -11 ID [ECL DVCE July 14, 2011 n JUL 18 2011 Town of Vail Building Department TOWN OF Vi41L Attn. Martin Haeberle Load Calculations for adding a boiler to 2570 Bald Mountain Rd. Vail, Co. BP. B 11- 0192/2570 Based on the NEC NFPA 70 220.83 (A): General lighting for 4000sf. @3watts per sf 12kw Hot Tub 1 @ 12kw 12kw Steamer 1 @ 7kw 7kw Clothes Washer 1 @ 1.5kw 1.5kw Electric Dryer 1 @ 7kw 7kw Heat Tape 3@ 1.5kw 4.5kw Range 1 @ l Okw l Okw Heater Toe Kick 2@ 2kw 4kw Warming Drawer 1@ 1.5kw 1.5kw Microwave 1 @ 1.5kw 1.5kw Dishwasher 2@ 1.92kw 3.84kw Disposal 2@ 1.92kw 3.84kw Small Appliance ckt. 2 @1.5kw 3.Okw Refrigerator 1 @ 1.92kw 1.92kw Outlet Circuits 10 @1.5kw 15.Okw Gas Boiler + Pumps 1@ 1.92kw 1.92kw Additional Boiler/Pumps 1 @ 1.92kw 1.92kw Last item being proposed new snow melt boiler and pump load. First 8kw of load @100 %. Remainder (84.44kw) @ 40% for 240volt Single Phase Total Calculated Load including new items= 140.73 Amps Service to each side of duplex is 200A at 240volts. New load will be below maximum allowable for service. Thank You.