Loading...
HomeMy WebLinkAbout10-039 20100918 Retaining Wall - Revised 10-22-10 Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 1 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Retaining Wall, Sampled at Gridlines E.0 to B.5 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85821739 Mix Design No: RMXCE45DG8V Slump: 5.00 inch(es) Air Content: 7.5 % Wet Unit Weight: 139.5 pcf Concrete Temperature 65 °F Air Temperature: 68 °F Test Date: 09/18/10 Time Test Taken: 9:25 AM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 5 gallons Remarks: Concrete did not meet average compressive strength at 28 days, but falls with in 500 psi. Hold cylinder will be broken at 56 days. *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area (sq. in.) Compressive Strength(psi) Type of Fracture* 7 49437 4.00 12.57 3930 5 28 60179 4.01 12.63 4760 5 28 61100 4.02 12.69 4810 Average: 4790 5