Loading...
HomeMy WebLinkAbout10-039 20100918 Retaining Wall Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy• Suite 115 • Lakewood, CO 80228-2845 � www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970) 241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel,P.E. Job No. ]0-039 Town of Vail, Department of Public Works/Transportation Set No. 1 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Retaining Wall, Sampled at Gridlines E.0 to B.5 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85821739 Mix Design No: RMXCE45DG8V Slump: 5.00 inch(es) Air Content: 7.5 % Wet Unit Weight: 139.5 pcf Concrete Temperature: 65 °F Air Temperature: 68 °F Test Date: 09/18/10 Time Test Taken: 9:25 AM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 5 gallons Remarks: Concrete did not meet average compressive strength at 28 days, but did make the required strength at 56 days. - - *Refer to ASTM C39/C39M-OS A e da s Total Load(lbs� Diameter in.� Area s�c. in.� Compressive Stren tg l]�,��si) Type of Fracture* 7 49437 4.00 12.57 3930 5 28 60179 4.01 12.63 4760 5 28 61100 4.02 12.69 4810 Average: 4790 5 56 68438 4.O1 12.63 5420 2