Loading...
HomeMy WebLinkAbout10-039 20100930 Pedestrian Bridge Side Wall - Revised 10-22-10 Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 5 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Pedestrian Bridge Side Wall, Sampled 20'North of Gridlines E-A.0/E-3.6 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85909200 Mix Design No: RMXCE45DG8V Slump: 4.50 inch(es) Air Content: 4.9 % Wet Unit Weight: 143.2 pcf Concrete Temperature 71 °F Air Temperature: 80 °F Test Date: 09/30/10 Time Test Taken: 2:10 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: ll gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load (lbs) Diameter(in.) Area (sq. in.) Compressive Strength(psi) Type of Fracture* 7 43387 4.01 12.63 3440 2