Loading...
HomeMy WebLinkAbout10-039 20100930 Pedestrian Bridge Side Wall Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 5 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Pedestrian Bridge Side Wall, Sampled 20'North of Gridlines E-A.0/E-3.6 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85909200 Mix Design No: RMXCE45DG8V Slump: 4.50 inch(es) Air Content: 4.9 % Wet Unit Weight: 143.2 pcf Concrete Temperature 71 °F Air Temperature: 80 °F Test Date: 09/30/]0 Time Test Taken: 2:10 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 11 gallons Remarks: Concrete did not meet average compressive strength at 28 days or 56 days. *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 43387 4.01 12.63 3440 2 28 55530 4.00 12.57 4420 2 28 54520 4.00 12.57 4340 Average: 4380 5 56 61624 4.01 12.63 4880 5