Loading...
HomeMy WebLinkAbout10-039 20101006 Curb Gutter Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 10 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Curb and Gutter, Sampled at Station 10+20 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85909229 Mix Design No: RMXDG45GD87 Slump: 5.50 inch(es) Air Content: 5.5 % Wet Unit Weight: 138.5 pcf Concrete Temperature 65 °F Air Temperature: 62 °F Test Date: ]0/06/]0 Time Test Taken: 2:06 PM Design Strength: 4500 psi at 28 days Amount of Water Added at Site: 0 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 52194 4.02 12.69 4110 2 7 49508 4.02 12.69 3900 Average: 4010 5 28 56082 4.02 12.69 4420 5 28 61044 4.02 12.69 48]0 2 28 65808 4.01 12.63 5210 Average: 4810 3