HomeMy WebLinkAbout10-039 20101021 Planter Wall Koechlein Consulting Engineers, Inc.
Consulting Geotechnical Engineers
12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845
, www.KCE-Denver.com
LAKEWOOD GRAND JUNCTION
(303) 989-1223 (970)241-7700
(303) 989-0204 FAX (970) 241-7783 FAX
Tom Kassmel, P.E. Job No. 10-039
Town of Vail, Department of Public Works/Transportation Set No. 16
1309 Elkhorn Drive
Vail, CO 81657
SUMMARY OF CONCRETE TEST RESULTS
Project: Lionshead Transit Center, Vail, Colorado
Location: South Planter Wall at Drive-in/Drive-out, Sampled 10' East of West End
Total Cubic Yards: 10
Supplier: Lafarge Ticket No: 85909416 Mix Design No: RMXCE40GD87
Slump: 5.00 inch(es) Air Content: 5.5 % Wet Unit Weight: 144.0 pcf
Concrete Temperature 68 °F Air Temperature: 50 °F
Test Date: ]0/21/]0 Time Test Taken: 5:20 PM
Design Strength: 4000 psi at 28 days Amount of Water Added at Site: 11 gallons
Remarks:
*Refer to ASTM C39/C39M-OS
Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture*
7 53599 4.01 12.65 4240 2
28 76595 4.01 12.63 6060 2
28 76241 4.01 12.63 6040 Average: 6050 2