Loading...
HomeMy WebLinkAbout10-039 20101021 Planter Wall Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 16 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: South Planter Wall at Drive-in/Drive-out, Sampled 10' East of West End Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85909416 Mix Design No: RMXCE40GD87 Slump: 5.00 inch(es) Air Content: 5.5 % Wet Unit Weight: 144.0 pcf Concrete Temperature 68 °F Air Temperature: 50 °F Test Date: ]0/21/]0 Time Test Taken: 5:20 PM Design Strength: 4000 psi at 28 days Amount of Water Added at Site: 11 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 53599 4.01 12.65 4240 2 28 76595 4.01 12.63 6060 2 28 76241 4.01 12.63 6040 Average: 6050 2