Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
10-039 20101028 Walls Pedestals
Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 19 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Exterior Walls: Gridlines E-1/E-F.4 to E-F.8, E-1/E-D.3, E-1/E-B.7, E-1/E-B.S, E-1/E-B.1 and Pedestals: E-A/E-1.4, E-A.2/E-1, E-].2/E-1.4 Total Cubic Yards: 6 Supplier: Lafarge Ticket No: 85909437 Mix Design No: RMXCE45DG8V Slump: 5.75 inch(es) Air Content: 2.8 % Wet Unit Weight: 145.2 pcf Concrete Temperature 62 °F Air Temperature: 40 °F Test Date: ]0/28/]0 Time Test Taken: 1:55 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 0 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 68155 4.02 12.69 5370 2 28 85968 4.02 12.69 6770 2 28 86590 4.01 12.63 6860 Average: 6820 2