Loading...
HomeMy WebLinkAbout10-039 20101102 Landing Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970) 241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 22 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: 2nd Floor Heated Landing, Southwest Stairs, Area C Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85909468 Mix Design No: RMXCE45DG8V Slump: 3.00 inch(es) Air Content: 4.5 % Wet Unit Weight: 143.2 pcf Concrete Temperature 67 °F Air Temperature: 49 °F Test Date: 1]/02/]0 Time Test Taken: 9:10 AM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 15 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 60832 4.01 12.63 4820 3 28 87268 4.01 12.63 6910 2 28 80483 4.01 12.63 6370 Average: 6640 2