Loading...
HomeMy WebLinkAbout10-039 20101112 Slab-on-grade Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303)989-0204 FAX (970)241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 32 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Structural Slab-on-grade Between Existing and Pedestrian Wall, Sampled at Gridlines E-D.2/E-1 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85909571 Mix Design No: RMXLTH45GD8V Slump: 5.00 inch(es) Air Content: 6.8 % Wet Unit Weight: 141.5 pcf Concrete Temperature 67 °F Air Temperature: 38 °F Test Date: 1]/12/10 Time Test Taken: 5:05 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 0 gallons Remarks: Concrete did not meet average compressive strength at 28 days, but did make the required strength at 56 days. *Refer to ASTM C39/C39M-OS A e da s Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 41209 4.01 12.63 3260 5 28 52236 4.01 12.63 4140 2 28 51968 4.01 12.63 4ll0 Average: 4130 5 56 65045 4.01 12.63 S l 50 5