Loading...
HomeMy WebLinkAbout10-039 20101123 Walkway and Wall Set 38 Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy• Suite 110• Lakewood, CO 8022&2845 � www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303) 989-0204 FAX (970)241-7783 FAX Tom Kassmel,P.E. Job No. ]0-039 Town of Vail, Department of Public Works/Transportation Set No. 38 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: ECO Building Wall, Sampled at Gridlines A.1/1.0 Total Cubic Yards: 8 Supplier: Lafarge Ticket No: 85909631 Mix Design No: RMXCE40GD87 Slump: 5.25 inch(es) Air Content: 4.5 % Wet Unit Weight: 144.4 pcf Concrete Temperature: 67 °F Air Temperature: 35 °F Test Date: 1 l/23/10 Time Test Taken: 4:05 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 0 gallons Remarks: Concrete did not meet average compressive strength at 28 days, but did make the required strength at 56 days. - - *Refer to ASTM C39/C39M-OS A e da s Total Load(lbs� Diameter in.� Area s�c. in.� Compressive Stren tg l]�,��si) Type of Fracture* 7 42934 4.01 12.63 3400 5 28 60620 4.01 12.63 4800 2 28 58725 4A1 12.63 4650 3 28 54725 4.01 12.63 4330 Average: 4590 5 56 75732 4.01 12.63 6000 3