Loading...
HomeMy WebLinkAbout10-039 20101202 Retaining Wall Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303)989-0204 FAX (970)241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 40 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: West-most Retaining Wall Section at 47' to 49' West of Gridlines E-1/E-D.6 to E-E.2, Sampled at Top Lift Total Cubic Yards: 20 Supplier: Lafarge Ticket No: 85909651 Mix Design No: RMXCE45DG8V Slump: 5.25 inch(es) Air Content: 5.6 % Wet Unit Weight: 141.8 pcf Concrete Temperature 66 °F Air Temperature: 36 °F Test Date: 12/02/]0 Time Test Taken: 4:04 PM Design Strength: 4500 psi at 28 days Amount of Water Added at Site: 8 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 52507 4.01 12.63 4160 2 28 80115 4.00 12.57 6370 2 28 78291 4.01 12.63 6200 2 28 84370 4.01 12.63 6680 Average: 6420 2