Loading...
HomeMy WebLinkAbout10-039 20110103 Planter Box Foundation Walls Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303)989-0204 FAX (970)241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 54 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: ECO Building Planter Box Foundation Walls at Gridlines A.0/6.1 to 4'North, 4'North of Gridlines A.0/6.1-8.1, and A.0/8.l to 4'North Total Cubic Yards: 4 Supplier: Lafarge Ticket No: 85822883 Mix Design No: RMXCE45DG8V Slump: 3.00 inch(es) Air Content: 3.7 % Wet Unit Weight: 141.7 pcf Concrete Temperature 73 °F Air Temperature: 35 °F Test Date: O1/03/]1 Time Test Taken: 3:12 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 25 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 57905 4.01 12.63 4580 2 28 82999 4.01 12.63 6570 3 28 83282 4.00 12.57 6630 5 28 83663 4.01 12.63 6620 Average: 6610 2