Loading...
HomeMy WebLinkAbout10-039 20110106 Slab-on-grade Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303)989-0204 FAX (970)241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 56 1309 Elkhorn Drive Vail, CO 81657 SUMMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: Interior slab-on-grade, Sampled at Gridlines A.7-B.0/0.0-2.0 and A.0-A.7/0.0-0.3 Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85822902 Mix Design No: RMXCE45DG8V Slump: 3.75 inch(es) Air Content: 4.5 % Wet Unit Weight: 143.2 pcf Concrete Temperature 67 °F Air Temperature: 31 °F Test Date: O1/06/]1 Time Test Taken: 12:23 PM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 5 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area(sq. in.) Compressive Stren�th (psi) Type of Fracture* 7 51247 4.01 12.63 4060 5 28 80525 4.01 12.63 6380 3 28 70968 4.01 12.63 5620 2 28 79875 4.01 12.63 6320 Average: 6]10 5