Loading...
HomeMy WebLinkAbout10-039 20110503 Mortar Cubes KOECHLEIN CONSULTING ENGINEERS, INC. Lakewood—(303)989-1223 Grand Junction—(970)241-7700 Report of Masonry Testing To: Town of vail Job No. 10-039 Cast Date: 5/3/11 Tom Kassmel,P.E. Town Engineer Department of Public Works/Transportation Set N0. 57 Sheet: 1 Of 1 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Test Location: Gridlines A.0-B.0/0.0 and B.0/0.0-1.0, at 0 feet to 4 feet Type and Size of Specimens: 2"x 2"x 2"Mortar Cubes Field Testing Information: Time Mixed: 11:57 am Flow Slump(in.): 3.0" Supplier: Rio Grande Time Sampled: 11:58 am Sample Temp: 42° Mix Design: Type S COMPRESNE STRENGTH: Specimen No. A B C Age(days) 7 28 28 Date Tested 5/10/11 5/31/1 l 5/31/11 Maximum Load(lbs.) 12681 13105 16625 Gross Strength(psi) N/A N/A N/A Net Strength(psi) 3170 3260 4135 Gross Area(in. squared) 4.00 4.02 4.02 Net Area(in. squared) N/A N/A N/A Design Strength 1800 psi @ 28 Days Progress Report: Don Sneed Field Observer