Loading...
HomeMy WebLinkAbout10-039 20110504 Block Prisms KOECHLEIN CONSULTING ENGINEERS, INC. Lakewood—(303)989-1223 Grand Junction—(970)241-7700 Report of Masonry Testing To: Town ofvail Job No. 10-039 Cast Date: 5/4/11 Tom Kassmel,P.E. Town Engineer Department of Public Works/Transportation Set NO. 5g Sheet: 1 Of 1 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Test Location: Gridlines C.0/2.6-7.0, 4 to 8 feet Type and Size of Specimens: 8"x 8"x 16"Block Prisms Field Testing Information: Time Mixed: 9:47 am Flow Slump(in.): 2.25 Supplier: Rio Grande Time Sampled: 9:57 am Sample Temp: 53° Mix Design: Type S COMPRESNE STRENGTH: Specimen No. A B C Age(days) 7 28 28 Date Tested 5/11/11 6/1/11 6/1/I 1 Maximum Load(lbs.) 172020 189540 166750 Gross Strength(psi) 1440 1590 1400 Net Strength(psi) 2700 2790 2420 Corrected Net Strength(psi)* 2700 2790 2420 Gross Area(in. squared) 119.34 119.42 119.42 Net Area(in. squared) 63.76 67.93 68.83 Design Strength 1800 psi @ 28 Days Progress Report: * - A correction factor of 1 was applied to the Net Strength in order to take into consideration the height to thickness ratio, as presented in ASTM C 1314. Don Sneed Field Observer