HomeMy WebLinkAbout10-039 20110506 Grout Prisms KOECHLEIN CONSULTING ENGINEERS, INC.
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
Report of Masonry Testing
To: Town ot'vail Job No. 10-039 Cast Date: 5/6/11
Tom Kassmel,P.E.
Town Engineer
Department of Public Works/Transpartation Set No. 59 Sheet: 1 Of 1
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Test Location: 1St Level at Gridlines B.0-C.0/2.6 and B.0/2.6-3.3 (8'-0"); C.0/1.0-2.0, B.0-C.0/1.0, and B.0-
C.0/2.0—double walls(8'-4"); A.0-B.0/0.0 and B.0/0.0-1.0 (3'-11")
Type and Size of Specimens: 4"x 4"x 8"Grout Prisms
Field Testing Information:
Time MiYed: 1:24 pm Slump (in.): 10 Supplier: Lafarge
Time Sampled: 3:08 pm Sample Temp: 68° MiY Design: RMXAGB40GF8
COMPRESIVE STRENGTH:
Specimen No. A B C
Age(days) 7 28 28
Date Tested 5/13/11 6/3/11 6/3/11
Ma�num Load(lbs.) 37715 50780 51005
Gross Strength (psi) 2070 2940 2970
Net Strength(psi) 2070 2940 2970
Gross Area(in. squared) 18.2 17.3 17.2
Net Area(in. squared) 18.2 17.3 172
Design Strength 1800 psi @ 28 Days
Progress Report:
Don Sneed
Field Observer