Loading...
HomeMy WebLinkAbout10-039 20110506 Grout Prisms KOECHLEIN CONSULTING ENGINEERS, INC. Lakewood—(303)989-1223 Grand Junction—(970)241-7700 Report of Masonry Testing To: Town ot'vail Job No. 10-039 Cast Date: 5/6/11 Tom Kassmel,P.E. Town Engineer Department of Public Works/Transpartation Set No. 59 Sheet: 1 Of 1 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Test Location: 1St Level at Gridlines B.0-C.0/2.6 and B.0/2.6-3.3 (8'-0"); C.0/1.0-2.0, B.0-C.0/1.0, and B.0- C.0/2.0—double walls(8'-4"); A.0-B.0/0.0 and B.0/0.0-1.0 (3'-11") Type and Size of Specimens: 4"x 4"x 8"Grout Prisms Field Testing Information: Time MiYed: 1:24 pm Slump (in.): 10 Supplier: Lafarge Time Sampled: 3:08 pm Sample Temp: 68° MiY Design: RMXAGB40GF8 COMPRESIVE STRENGTH: Specimen No. A B C Age(days) 7 28 28 Date Tested 5/13/11 6/3/11 6/3/11 Ma�num Load(lbs.) 37715 50780 51005 Gross Strength (psi) 2070 2940 2970 Net Strength(psi) 2070 2940 2970 Gross Area(in. squared) 18.2 17.3 17.2 Net Area(in. squared) 18.2 17.3 172 Design Strength 1800 psi @ 28 Days Progress Report: Don Sneed Field Observer