HomeMy WebLinkAbout10-039 20110518 Walkway Koechlein Consulting Engineers, Inc.
Consulting Geotechnical Engineers
12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845
, www.KCE-Denver.com
LAKEWOOD GRAND JUNCTION
(303) 989-1223 (970)241-7700
(303)989-0204 FAX (970)241-7783 FAX
Tom Kassmel, P.E. Job No. 10-039
Town of Vail, Department of Public Works/Transportation Set No. 60
1309 Elkhorn Drive
Vail, CO 81657
SUIVIMARY OF CONCRETE TEST RESULTS
Project: Lionshead Transit Center, Vail, Colorado
Location: ECO Bridge Walkway, Sampled at Gridlines E-A to C/2.1-2.7
Total Cubic Yards: 2.5
Supplier: Lafarge Ticket No: 85823487 Mix Design No: RMXCE45DG8V
Slump: 3.50 inch(es) Air Content: 5.4 % Wet Unit Weight: 141.9 pcf
Concrete Temperature 60 °F Air Temperature: 57 °F
Test Date: OS/18/11 Time Test Taken: 4:05 PM
Design Strength: 4000 psi at 28 days Amount of Water Added at Site: 5 gallons
Remarks:
*Refer to ASTM C39/C39M-OS
Age (days) Total Load(lbs) Diameter(in.) Area (sq. in.) Compressive Stren�th(psi) Type of Fracture*
7 54654 4.01 12.63 4330 5
28 67844 4.01 12.63 5370 5
28 74008 4.01 12.63 5860 5
28 66444 4.02 12.69 5240 Average: 5490 2