Loading...
HomeMy WebLinkAbout10-039 20110609 Curb Gutter Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303)989-0204 FAX (970)241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 61 1309 Elkhorn Drive Vail, CO 81657 SUIVIMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: ECO Building Driveway Curb & Gutter, Sampled at East End to Approximately 87 Feet West Total Cubic Yards: 10 Supplier: Lafarge Ticket No: 85823782 Mix Design No: RMXDG45GD87 Slump: 4.50 inch(es) Air Content: 4.6 % Wet Unit Weight: 142.6 pcf Concrete Temperature 69 °F Air Temperature: 71 °F Test Date: 06/09/11 Time Test Taken: 12:14 PM Design Strength: 4200 psi at 28 days Amount of Water Added at Site: 4 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area (sq. in.) Compressive Stren�th(psi) Type of Fracture* 7 48066 4.02 12.69 3790 2