Loading...
HomeMy WebLinkAbout10-039 20110610 Slab-on-grade Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy YSuite 110 YLakewood, CO 80228-2845 , www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970)241-7700 (303)989-0204 FAX (970)241-7783 FAX Tom Kassmel, P.E. Job No. 10-039 Town of Vail, Department of Public Works/Transportation Set No. 63 1309 Elkhorn Drive Vail, CO 81657 SUIVIMARY OF CONCRETE TEST RESULTS Project: Lionshead Transit Center, Vail, Colorado Location: ECO Building Driveway Slab-on-grade, Sampled 96' to 144' East of West End Total Cubic Yards: 40 Supplier: Lafarge Ticket No: 85823808 Mix Design No: RMXCE45DG8V Slump: 6.50 inch(es) Air Content: 8.0 % Wet Unit Weight: 135.4 pcf Concrete Temperature 66 °F Air Temperature: 58 °F Test Date: 06/10/11 Time Test Taken: 10:50 AM Design Strength: 5000 psi at 28 days Amount of Water Added at Site: 8 gallons Remarks: *Refer to ASTM C39/C39M-OS Age (days) Total Load(lbs) Diameter(in.) Area (sq. in.) Compressive Stren�th(psi) Type of Fracture* 5 38905 4.01 12.63 3080 4 5 35979 4.01 12.63 2850 Average: 2970 6