Loading...
HomeMy WebLinkAbout10-039 Daily Field Report 104 REPORT OF CONSTRUCTION ACTIVITIES KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers Lakewood—(303)989-1223 Grand Junction—(970)241-7700 To: Town of Vail Job No. 10-039 Date: 6/22/11 Tom Kassmel,P.E. Town Engineer Report#: 104 Sheet: 1 of 1 Department of Public Works/Transportation 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 74°F± Construction Activities/Observations: Field engineer arrived on site, as requested, to perform concrete tests for the 1:00 pm concrete pour for the sidewalk sections on the south and northeast sides of the facility. Due to the fact that the concrete pump was going to be delayed unti12:30 pm, the contractor cancelled concrete testing. Don Sneed William H. Koechlein,P.E. Field Observer Reviewed By