Loading...
HomeMy WebLinkAbout10-039 Daily Field Report 44C (Revised 11-1-10) REINFORCING STEEL (REBAR) OBSERVATION KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers Lakewood—(303)989-1223 Grand Junction—(970)241-7700 To: Town of Vail Job No. 10-039 Date: 10/21/10 Tom Kassmel,P.E. Revised Date: ll/1/10 Town Engineer Report#: 44C Sheet: 3 of 5 Department of Public Works/Transportation 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 63°F± Reinforcing Steel (Rebar) Observations: Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Grade Beams Location of Observations: Level 2 Upper Landing, Southwest Corner of Parking Structure Sheet or Plan Number: 12/5213 and 9/5215 Meets Project Spec. Grade Beam Rebal': Level 2 Upper Landing,Southwest Corner of Parking Structure yeS n0 Horizontal: Size: 6 - #8 Spacing: Top and bottom continuous � ❑ Horizontal: Size: 2 - #4 Spacing: Each side � ❑ Stirrups: Size: #3 Spacing: 0'-5" o.c. � ❑ Standard hook: Size: #4 Spacing: 1'-0" o.c. � ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Splices:(yes/no) no Length: � ❑ Meets Project Spec. Grade Beam Rebal': Level 2 Upper Landing,Southwest Corner of Parking Structure yeS n0 Horizontal: Size: 4 - #8#� Spacing: Top and bottom � �- Dowels: Size: 2 rows 3 - Spacing: 0'-4" o.c. � ❑ #5 Horizontal: Size: 2 - #4 Spacing: Each side � ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Splices:(yes/no) no Length: � ❑ Discrepancies/Remarks: Field engineer reviewed original field report dated 10/21/10 and corrected yes no the size of the reinforcing for the grade beams. Based on our observations, it is our opinion that the � � reinforcing steel (rebar) noted in this Daily Field Report has been properly placed and has met project specifications. Mike Brath Scott B. Myers, P.E. Field Observer Reviewed By