Loading...
HomeMy WebLinkAbout10-039 Daily Field Report 48B (Revised 12-15-10) REINFORCING STEEL (REBAR) OBSERVATION KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers Lakewood—(303)989-1223 Grand Junction—(970)241-7700 To: Town of Vail Job No. 10-039 Date: 10/29/10 Tom Kassmel,P.E. Revised Date: 12/15/10 Town Engineer Report#: 48B Sheet: 2 of 2 Department of Public Works/Transportation 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Weather: ❑ Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 34°F± in parking structure Reinforcing Steel (Rebar) Observations: Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Stair Tower Slabs Location of Observations: Gridlines E A.3/E-8.7 to E-19 and E-A.3/E-1 to E-1.4 (NW) Sheet or Plan Number: 5203 and 5204 Meets Project Spec. Stair Tower Slabs Rebar: Gridlines E-A3/&8.7 to E-19 and E-A.3/E-1 to E-1.4 yes no Bottom: Size: #5 Spacing: ]'-6" o.c., each way � ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Splices:(yes/no) yes Length: l'-3.5" ❑ ❑ Meets Project Spec. Rebar: yes no Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Splices:(yes/no) Length: ❑ ❑ Discrepancies/Remarks: As per the email sent by Eric Sobel, P.E., in response to Chadd Nelson's yes no email of November 2, 2010, the reinforcing steel (rebar) noted in this Daily Field Report has been � ❑ properly placed and has met project specifications. Don Sneed Scott B. Myers, P.E. Field Observer Reviewed By