Loading...
HomeMy WebLinkAbout10-039 Daily Field Report 97 REINFORCING STEEL (REBAR) OBSERVATION KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers Lakewood—(303)989-1223 Grand Junction—(970)241-7700 To: Town of Vail Job No. 10-039 Date: 5/12/11 Tom Kassmel,P.E. Town Engineer Report#: 97 Sheet: 1 of 1 Department of Public Works/Transportation 1309 Elkhorn Drive Vail,Colorado 81657 Project: Lionshead Transit Center,Vail, Colorado Weather: ❑ Sunny � Cloudy ❑ Rain � Snow Temp: 36°F± Reinforcing Steel (Rebar) Observations: Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): ECO Walkway Bridge Location of Observations: Gridlines E A to C/2.1-2.7 Sheet or Plan Number: 10/S 121 and 4/5210 Meets Project Spec. ECO Walkway Bridge Rebar: Gridlines E A to C/2.1-2.7 yes no Bottom dowels: Size: #4 (north Spacing: � ❑ end) 0'-7" o.c. drilled and epoxied Top and bottom: Size: #6 Spacing: 1'-0" o.c. each way � ❑ Middle: Size: 1 - #4 Spacing: Transverse at both sides � ❑ Galvanized embed: Size: 6 - #6 Spacing: Continuous with studs at south end � ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Splices:(yes/no) no Length: ❑ ❑ Meets Project Spec. Rebar: Gridlines yes no Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Size: Spacing: ❑ ❑ Splices:(yes/no) Length: ❑ ❑ Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no noted in this Daily Field Report has been properly placed and has met project specifications. � ❑ Don Sneed William H. Koechlein,P.E. Field Observer Reviewed By